This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
DHS 163.32 Note Note: Pursuant to s. 254.30 (2) (b), Stats., any person who knowingly violates any provision of this chapter or an order issued under sub. (3) shall be subject to criminal penalty and shall be fined not less than $100 or more than $5,000 per day for each violation. The court may also place the person on probation under s. 973.09, Stats., for a period not to exceed 2 years.
DHS 163.32 History History: CR 00-172: cr. Register February 2002 No. 554, eff. 3-1-02; EmR0928: emerg. am. (intro.) and (3) (intro.), eff. 10-16-09; CR 09-085: am. (intro.) and (3) (intro.) Register March 2010 No. 651, eff. 4-1-10; CR 19-110: am. (1) (a) to (c), (e), (f), (2), (3), (5) (b) Register June 2021 No. 786, eff. 7-1-21.
DHS 163.33 DHS 163.33 Appeal.
DHS 163.33(1)(1)Right to appeal. An action taken by the department under s. DHS 163.32 (1) to (6) is subject to administrative review under ch. 227, Stats.
DHS 163.33(2) (2)Appeals process. To request a hearing under ch. 227, Stats., the aggrieved person shall file, within 10 working days after the date of the department's action, a written request for a hearing under s. 227.44, Stats. A hearing request is considered filed when the division of hearings and appeals receives the request. A request by facsimile is complete upon transmission. If the request is filed by facsimile transmission and such transmission is completed between 5 PM and midnight, one day shall be added to the prescribed period.
DHS 163.33 Note Note: A hearing request should be addressed to the Division of Hearings and Appeals, P.O. Box 7875, Madison, WI 53707. Hearing requests may be delivered in person to that office at 5005 University Avenue, Room 201, Madison, WI. Hearing requests may be faxed to 608-264-9885.
DHS 163.33(3) (3)Administrative hearing. The division of hearings and appeals shall hold an administrative hearing under s. 227.42, Stats., within 30 calendar days after receipt of the request for the administrative hearing, unless the aggrieved person consents to an extension of that time period. The division of hearings and appeals shall issue a decision no later than 45 calendar days after holding the hearing, unless both parties agree to a later date.
DHS 163.33 History History: CR 00-172: cr. Register February 2002 No. 554, eff. 3-1-02.
subch. V of ch. DHS 163 Subchapter V — Registry of Property with Certificates of Lead-Free Status or Lead-Safe Status
DHS 163.40 DHS 163.40 General provisions.
DHS 163.40(1)(1)Applicability. This subchapter applies to registered lead-free property and registered lead-safe property, the property owners and the employees and agents of property owners of registered lead-free property or registered lead-safe property, and persons performing lead-based paint activities on registered lead-safe property.
DHS 163.40(2) (2)Requirements and restrictions.
DHS 163.40(2)(b) (b) Registered lead-free property or registered lead-safe property. Only a dwelling, dwelling unit or premises with a valid certificate of lead-free status in effect may be claimed to be registered lead-free property and only a dwelling, dwelling unit or premises with a valid certificate of lead-safe status in effect may be claimed to be registered lead-safe property.
DHS 163.40(2)(c) (c) Sampling or testing.
DHS 163.40(2)(c)2.2. `Treating paint as lead-based paint for registered lead-free or lead-safe properties.' For purposes of obtaining a certificate of lead-free status or a certificate of lead-safe status and for performing lead abatement or non-abatement lead-based paint activities on registered lead-safe property, untested paint shall be treated as lead-based paint.
DHS 163.40(2)(c)3. 3. `Who may sample or test paint for a lead-free inspection or lead-safe investigation.' To be included in a lead-free inspection or lead-safe investigation, sampling or testing of paint shall be conducted by an appropriately certified person who is:
DHS 163.40(2)(c)3.a. a. Not the property owner or an immediate family member, agent or employee of the property owner.
DHS 163.40(2)(c)3.b. b. Not a company or associated with a company that is directly or beneficially owned, controlled or managed by the property owner, or by an immediate family member, agent or employee of the property owner.
DHS 163.40(2)(c)3.c. c. Not a person hired by or under contract with the property owner to manage or maintain the property owner's real property as directed by the property owner.
DHS 163.40(2)(c)3.d. d. Not a person who has been authorized by the property owner to manage or maintain the property owner's real property on the property owner's behalf.
DHS 163.40(2)(c)3.e. e. Not a person who has a financial interest in the laboratory results of the sampling or testing or in the determination of whether the property meets the registered lead-free property standard or the registered lead-safe property standard.
DHS 163.40(2)(c)5. 5. `Conducting sampling or testing.' If sampling or testing of paint is conducted on registered lead-free property or registered lead-safe property, the certified individual shall use documented methodologies that incorporate adequate quality control procedures to do one of the following:
DHS 163.40(2)(c)5.a. a. Using the procedures under s. DHS 163.14 (8), test the paint with an XRF and, if the XRF reading is more than 1 milligram lead per square centimeter, determine that lead-based paint is present. If the reading is less than or equal to 1 milligram lead per square centimeter, determine that lead-based paint is not present. When a reading is in the inconclusive range for the XRF used, treat the paint as lead-based paint unless a paint chip sample taken under subd. 5. b. results in a determination that lead-based paint is not present.
DHS 163.40(2)(c)5.b. b. Collect a paint chip sample; have the paint chip sample analyzed by a recognized laboratory to determine detectable levels of lead that can be quantified numerically; and determine that lead-based paint is present if the laboratory result for the paint chip sample is more than 0.5% lead by weight. If the laboratory result for the paint chip sample is equal to or less than 0.5% lead by weight, determine that lead-based paint is not present.
DHS 163.40(3) (3)Transfer of certificate ownership.
DHS 163.40(3)(a)(a) Requirement to transfer. When a person obtains both equitable title and legal possession of a registered lead-free property or registered lead-safe property, any certificate issued to the previous property owner is no longer in effect unless transferred under par. (b).
DHS 163.40(3)(b) (b) Written notice to transfer.
DHS 163.40(3)(b)1.1. To request a transfer of ownership and an amended certificate, one of the new property owners shall submit a signed and dated written notice of the change in ownership of the property to the department within 60 days after the date on which the new property owner obtains both equitable title and legal possession of a registered lead-free property or registered lead-safe property. In the written notice, the property owner who provides the notice shall provide the names and mailing addresses of the property owners or the name and mailing address of the authorized representative of the property owners.
DHS 163.40(3)(b)2. 2. The property owner shall submit the appropriate fee for an amended certificate under s. DHS 163.41 (2) (f) or 163.42 (2).
DHS 163.40(3)(c) (c) Amended certificate. After receiving a written notice and fee under par. (b), the department shall issue an amended certificate that reflects the change in the ownership of the property.
DHS 163.40(3)(d) (d) Maintaining a certificate of lead-safe status. The new owners shall comply with the conditions for maintaining the certificate under s. DHS 163.42 until the certificate expires or is terminated or revoked.
DHS 163.40 Note Note: Along with the amended certificate, the department will send the new owners information about the conditions for maintaining the certificate.
DHS 163.40(5) (5)Voluntary termination of a certificate. To voluntarily terminate a certificate of lead-free status or to terminate a certificate of lead-safe and the requirement to comply with conditions for maintaining a certificate of lead-safe status, the property owner shall return the original certificate and any existing copies to the department with a signed and dated notice to terminate the certificate. The certificate is no longer in effect on the date the department receives the notice.
DHS 163.40 History History: CR 00-172: cr. Register February 2002 No. 554, eff. 3-1-02; EmR0928: emerg. am. (1), (2) (c) 2., 3. b. and 5. a., r. (2) (a), (c) 1., 4., and (4), eff. 10-16-09; CR 09-085: am. (1), (2) (c) 2., 3. b. and 5. a., r. (2) (a), (c) 1., 4., and (4) Register March 2010 No. 651, eff. 4-1-10; CR 19-110: am. (2) (c) 2., 5. a., b. Register June 2021 No. 786, eff. 7-1-21.
DHS 163.41 DHS 163.41 Certificate of lead-free status.
DHS 163.41(1)(1)Registered lead-free property standards. All registered lead-free property shall meet all of the following standards:
DHS 163.41(1)(a) (a) Painted components. Painted components shall be free of lead-based paint, as determined by a lead-free inspection under sub. (2).
DHS 163.41(1)(b) (b) Dust from removal of paint or components. Property shall be free of a dust-lead hazard created by removal of lead-based paint or lead-based paint components, as determined by a lead-free inspection under sub. (2).
DHS 163.41(2) (2)issuance of lead-free certificate. All of the following apply to issuing a certificate of lead-free status:
DHS 163.41(2)(a) (a) Lead-free inspection protocol.
DHS 163.41(2)(a)1.1. `Who may conduct.' A lead-free inspection shall be conducted by a certified lead inspector or lead risk assessor associated with a certified lead company. Under direct on-site supervision of a certified lead inspector or risk assessor, a certified lead hazard investigator or sampling technician may assist with a lead-free inspection but may not use an XRF. Certified individuals involved with conducting a lead-free inspection shall conduct it in an unbiased, objective and impartial manner. All persons involved with conducting the lead-free inspection shall meet the requirements under s. DHS 163.40 (2) (c) 3.
DHS 163.41(2)(a)2. 2. `Locations inspected.' The registered lead-free property covered by a certificate is limited to those locations subject to the lead-free inspection under one of the following subd. pars., except that all dwelling units are included when a random selection process under subd. 2. c. is successfully used:
DHS 163.41(2)(a)2.a. a. When a certificate of lead-free status is being sought for a single dwelling unit, the locations inspected shall include the dwelling unit for which the certificate is being sought and all interior and exterior common areas for the real property associated with the dwelling.
DHS 163.41(2)(a)2.b. b. When a certificate of lead-free status is being sought for an entire multi-family dwelling, the locations inspected shall include all dwelling units unless subd. 2. c. applies, and shall include all interior and exterior common areas for the real property associated with the dwelling.
DHS 163.41(2)(a)2.c. c. When a certificate of lead-free status is being sought for a multi-family dwelling with more than 20 dwelling units that are similar in construction, age and have a common painting history, the locations inspected shall include either all dwelling units or a subset of the dwelling units selected using the random selection process, and shall include all interior and exterior common areas for the real property associated with the dwelling. When the random selection process is used for dwellings built before 1960, a sufficient number of dwelling units shall be selected to provide a 95% level of confidence that at least 95% of all dwelling units would meet the standard for registered lead-free property if all dwelling units were investigated. When the random selection process is used for dwellings built in 1960 or later, a sufficient number of dwelling units shall be selected to provide a 95% level of confidence that at least 90% of all dwelling units would meet the standard for registered lead-free property if all dwelling units were investigated. If any dwelling unit included in the lead-free inspection does not meet the standard, a certificate of lead-free status may not be issued. If conditions in the failed dwelling unit are corrected, conduct a new lead-free inspection that includes a new selection of dwelling units chosen using the random selection process.
DHS 163.41 Note Note: For assistance in selecting the correct number of dwelling units to include in the lead-free inspection, refer to the most current edition of the HUD “Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing,” available at https://www.hud.gov/program_offices/healthy_homes/lbp/hudguidelines. At the first instance that a property fails a lead-free inspection, follow the actions agreed upon in the contract under s. DHS 163.13 (5) (e). Actions that might be required in the contract include the following: stop the lead-free inspection, continue with the lead-free inspection or a lead inspection to discover other sources of lead-based paint, or convert the lead-free inspection to a lead-safe risk assessment.
DHS 163.41(2)(a)2.d. d. When a certificate of lead-free status is being sought for a premises that is not a dwelling, such as a child-occupied facility, the locations inspected shall include all interior and exterior common areas for the real property associated with the premises where an occupant of the child-occupied facility might be exposed to a lead-based paint hazard.
DHS 163.41 Note Note: Subd. 2. a. to c. apply only to dwellings and subd. 2. d. applies only to other premises that are not dwellings, such as child-occupied facilities.
DHS 163.41(2)(a)2.e. e. The lead-free inspection may incorporate a determination from a prior lead investigation activity that lead-based paint is not present on a painted component when the prior investigation activity meets the requirements under s. DHS 163.40 (2) (c) 3.
DHS 163.41(2)(a)3. 3. `Lead inspection.' A lead-free inspection shall include a lead inspection under s. DHS 163.14 (8).
DHS 163.41(2)(a)4. 4. `Clearance.' A lead-free inspection shall include clearance under s. DHS 163.14 (5) of the work area where more than 2 square feet of paint was removed or more than 2 square feet of paint was disturbed in removing a painted component, if known, or of the dwelling units and common areas inspected under subd. 2., unless one of the following is obtained:
DHS 163.41(2)(a)4.a. a. A clearance report issued by an appropriately certified person after the most recent removal of more than 2 square feet of paint or removal of a painted component when the removal disturbed more than 2 square feet of paint. A certified individual involved with conducting clearance that is included in a lead-free inspection may not be a property owner or an immediate family member, agent or employee of a property owner or associated with a certified lead company that is directly or beneficially owned, controlled or managed by a property owner, or by an immediate family member, agent or employee of a property owner.
DHS 163.41(2)(a)4.b. b. The following statement signed by the property owner or the property owner's agent or employee and dated at the time of signature: “I have no notice or knowledge of any person, during the previous 12 months, removing a total of more than 2 square feet of paint or disturbing more than 2 square feet of paint when removing a painted component from the real property included in this lead-free inspection."
DHS 163.41(2)(b) (b) Submission of registration form. Following instructions provided by the department, a lead company shall complete and submit the lead-free inspection registration form to the department within 10 working days after completing the lead-free inspection, including receipt of any laboratory results. The registration form shall be submitted using an electronic format provided by the department or an alternative method approved by the department.
DHS 163.41(2)(c) (c) Verification of qualification and registration. The lead company shall follow the instructions provided by the department to issue the certificate of lead-free status to the property owner within 10 working days after receiving verification of qualification and registration from the department.
DHS 163.41(2)(d) (d) Effective date.
DHS 163.41(2)(d)1.1. If a certified lead company conducts a lead-free inspection and submits the registration form to the department under par. (b) within 10 working days after completion of the lead-free inspection, and, if the department determines the dwelling unit, dwelling or premises meets the standards for registered lead-free property, the certificate shall be valid on the date the on-site sampling was completed.
DHS 163.41(2)(d)2. 2. If a lead company fails to submit the registration form within 10 working days under par. (b), the certificate shall be valid on the date the dwelling unit, dwelling or premises met the standards, as determined by the department based on evidence submitted by the property owner or lead company.
DHS 163.41(2)(d)3. 3. If a certified lead company conducted a lead inspection prior to the availability of certificates of lead-free status, the certificate shall be valid on the date the lead-free inspection form under par. (b) is received by the department when one of the following meets the requirements of the lead-free inspection protocol under par. (a):
DHS 163.41(2)(d)3.a. a. The prior lead inspection.
DHS 163.41(2)(d)3.b. b. The prior lead inspection combined with a subsequent update to the lead inspection.
DHS 163.41(2)(e) (e) Expiration date. A certificate of lead-free status is valid until revoked, which shall be stated on each certificate of lead-free status issued.
DHS 163.41(2)(f) (f) Fees.
DHS 163.41(2)(f)1.1. In addition to fees charged by the lead company for the lead-free investigation and any laboratory analysis, the property owner shall pay a lead-free certificate fee of $50 to the lead company issuing a lead-free certificate and the lead company shall forward payment to the department before the 10th day of the month following issuance.
DHS 163.41(2)(f)2. 2. In addition to the fee under subd. 1., a lead company that submits a lead-free report using an approved alternative under sub. (2) (b) shall pay a handling fee of $25.
DHS 163.41(2)(f)3. 3. If a property owner requests the department to issue a duplicate or an amended certificate of lead-free status, the property owner shall submit a fee of $50, payable to the department of health services.
DHS 163.41 Note Note: The department will provide training to lead company staff on the process for registering and issuing a lead-free or lead-safe certificate. To request training, call 608-261-6876.
DHS 163.41(3) (3)Revocation. If the department provides written notice of revocation, the grounds for revocation and an explanation of the process under s. DHS 163.33 for appealing a revocation not less than 30 days before the date of the revocation, and the violation on which the revocation is based remains substantially uncorrected at the end of the 30-day notice period, the department may revoke a certificate of lead-free status for any of the following reasons:
DHS 163.41(3)(a) (a) The dwelling, dwelling unit, child-occupied facility or other premises is not free of lead-based paint, as determined by sampling conducted using documented methodologies.
DHS 163.41(3)(b) (b) The certificate was issued in error.
DHS 163.41(3)(c) (c) The lead-free inspection does not support that the property meets the registered lead-free property standards under sub. (1) because the lead-free inspection protocol under sub. (2) was not followed in determining that the dwelling, dwelling unit, child-occupied facility or other premises met the standards for registered lead-free property and a subsequent lead-free inspection does not verify that the dwelling, dwelling unit, child-occupied facility or other premises met the lead-free standards.
DHS 163.41 Note Note: When a property owner is notified of a problem with a lead-free inspection, the property owner may hire a certified lead company to conduct a new lead-free inspection to verify that the property was, in fact, eligible for the lead-free certificate. If the property owner submits the inspection report for the new lead-free inspection to the department, the department will review the report and stop the revocation action if the new lead-free inspection verifies the property meets the standards.
DHS 163.41(3)(d) (d) The property owner or his or her employee or agent obtained the certificate by fraud.
DHS 163.41 History History: CR 00-172: cr. Register February 2002 No. 554, eff. 3-1-02; EmR0928: emerg. am. (2) (a) 2. d., eff. 10-16-09; CR 09-085: am. (2) (a) 2. d. Register March 2010 No. 651, eff. 4-1-10; correction in (2) (f) 3. made under s. 13.92 (4) (b) 6., Stats., Register March 2010 No. 651; CR 19-110: am. (2) (a) 2. e., 4. a. Register June 2021 No. 786, eff. 7-1-21.
DHS 163.42 DHS 163.42 Certificate of lead-safe status.
DHS 163.42(1)(1)Registered lead-safe property standards. Under the standards in this subsection, paint is considered to be lead-based paint unless tested under s. DHS 163.40 (2) (c) and determined not to be lead-based paint. For registered lead-safe property, all locations under sub. (2) (a) 2. that are subject to a lead-safe investigation shall meet all of the following standards, as determined by a lead-safe investigation under sub. (2):
DHS 163.42(1)(a) (a) Interior painted components. Interior painted components shall be free of deteriorated lead-based paint.
DHS 163.42(1)(b) (b) Exterior painted components. Exterior painted components shall be free of deteriorated lead-based paint.
DHS 163.42(1)(c) (c) Paint chips. Floors, stairways, windowsills, window wells or troughs and soil shall be free of visible paint chips.
DHS 163.42(1)(d) (d) Substrate. Substrates with lead-based paint shall have no visible defect, damage, decay or deterioration that might cause paint failure.
DHS 163.42(1)(e) (e) Dust-lead hazards. The property shall have no dust-lead hazards as defined under DHS 163.15 (1) (b).
DHS 163.42(1)(f) (f) Moisture or water damage. Surfaces with lead-based paint shall be free from ongoing water damage caused by any of the following:
DHS 163.42(1)(f)1. 1. Unrepaired water leaks in gutters, downspouts, roofs, foundations or other components.
DHS 163.42(1)(f)2. 2. Unrepaired leaks in plumbing, air conditioning or heating systems.
DHS 163.42(1)(f)3. 3. Absent or malfunctioning gutters or downspouts.
DHS 163.42(1)(g) (g) Painted floors and stairs. Painted interior and exterior floors and stairs shall be free of deteriorated or abraded lead-based paint.
DHS 163.42(1)(h) (h) Window systems, including storm and screen windows. For window systems with lead-based paint, all of the following apply:
DHS 163.42(1)(h)1. 1. Weep holes shall be present and open in any window system designed to have weep holes.
DHS 163.42(1)(h)2. 2. Window wells or troughs shall be smooth and cleanable.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.