ATCP 50.88(1)(d) (d) Riparian buffers under s. ATCP 50.83.
ATCP 50.88(1)(e) (e) Roof runoff systems under s. ATCP 50.85.
ATCP 50.88(1)(f) (f) Subsurface drain under s. ATCP 50.90.
ATCP 50.88(1)(g) (g) Underground outlet under s. ATCP 50.92.
ATCP 50.88(1)(h) (h) Wetland development or restoration under s. ATCP 50.98.
ATCP 50.88(2) (2)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse any of the following costs related to streambank or shoreline protection:
ATCP 50.88(2)(a) (a) Costs to install new soil bioengineering and structural treatments including rock riprap. Wood chunks, unsorted demolition material, brick, plaster, blacktop, and other materials that may produce leachates may not be used as riprap. A cost-share grant may reimburse costs for rock and timber riprap used to establish fish habitat, in combination with the restoration of a riparian buffer and as part of a streambank or shoreline protection scheme, provided that reimbursement for fish habitat does not exceed 25% of the cost-share grant.
ATCP 50.88 Note Note: Lunker structures, or rock and timber riprap, are sometimes used to create fish habitat.
ATCP 50.88(2)(b) (b) Costs to shape streambanks or shorelines before installing protective plantings or structures.
ATCP 50.88(2)(c) (c) Costs to establish permanent vegetative cover, or to provide temporary cover until permanent cover is established. This may include costs for mulch, fertilizer, and other necessary materials.
ATCP 50.88 Note Note: Additional cost-shared practices may be combined with this practice to fully address the environmental problems at the site and protect the natural resource. Where appropriate, additional practices may include fencing (s. ATCP 50.75) to exclude livestock, water pumps, or other facilities (s. ATCP 50.76) if this is the most cost-effective way to deliver water to livestock excluded from access to surface water, or stream crossings (s. ATCP 50.885) to minimize disturbance at points of entry to a stream.
ATCP 50.88(2m) (2m)Ineligible costs. Except for violations of this chapter or ch. NR 151, a cost-share grant under s. ATCP 50.40 may not reimburse costs related to mitigation or correction of a violation of state or local laws.
ATCP 50.88(3) (3)Design, construction, and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse costs for streambank or shoreline protection unless all of the following conditions are met:
ATCP 50.88(3)(a) (a) The streambank or shoreline protection complies with all of the following that apply:
ATCP 50.88(3)(a)1. 1. NRCS technical guide critical area planting standard 342 (August, 2016).
ATCP 50.88(3)(a)2. 2. NRCS technical guide fence standard 382 (January, 2014).
ATCP 50.88(3)(a)3. 3. NRCS technical guide streambank and shoreline protection standard 580 (August, 2013).
ATCP 50.88(3)(a)4. 4. NRCS technical guide tree/shrub establishment standard 612 (July, 2011).
ATCP 50.88(3)(a)5. 5. NRCS technical guide heavy use area protection standard 561 (August, 2015).
ATCP 50.88(3)(b) (b) Cost-share recipients shall obtain all required DNR permits before installing any practices. The department may require documentation that permits have been obtained before it makes reimbursements under this chapter.
ATCP 50.88(3)(c) (c) The landowner agrees to maintain the streambank or shoreline protection for 10 years unless the practice is no longer required to prevent the soil and water resource problem for which the practice was installed.
ATCP 50.88 History History: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (3) (a) 1. to 5. Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (title), renum. (1) to (1) (intro.), cr. (1) (a) to (h), am. (2) (intro.), r. (2) (a), renum. (2) (b) to (2) (a) and am., renum. (2) (c) to (2) (b), r. (2) (d), renum. (2) (e) to (2) (c), r. (2) (f), cr. (2m), am. (3) (a) 1. to 5., r. and recr. (3) (b), am. (3) (c) Register February 2014 No. 698, eff. 5-1-14; CR 14-047: am. (3) (a) 2., 3., 5. Register May 2015 No. 713, eff. 6-1-15; CR 16-102: am. (3) (a) 5. Register August 2016 No. 728, eff. 9-1-16; CR 16-083: am. (3) (a) 1. Register January 2018 No. 745, eff. 2-1-18.
ATCP 50.885 ATCP 50.885Stream Crossing.
ATCP 50.885(1) (1) Definition. In this section, “stream crossing" means a road or pathway which confines or directs the movement of livestock, farm equipment, or vehicular traffic over a stream, and which is designed and installed to improve water quality, reduce erosion, protect an installed practice, or control livestock access to a stream.
ATCP 50.885(2) (2)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse any of the following costs related to a stream crossing:
ATCP 50.885(2)(a) (a) The costs of constructing a culvert, ford, or other allowed stream crossing structure other than a bridge.
ATCP 50.885(2)(b) (b) The costs of installing conservation practices necessary to limit water quality impairment from a stream crossing.
ATCP 50.885(3) (3)Ineligible costs. A cost-share grant under s. ATCP 50.40 may not reimburse for the costs of a stream crossing if the traffic can be re-directed along another route that would not result in the same water quality impairment.
ATCP 50.885(4) (4)Design, construction, and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse the cost of establishing a stream crossing unless all of the following conditions are met:
ATCP 50.885(4)(a) (a) The stream crossing complies with all of the following that apply:
ATCP 50.885(4)(a)1. 1. NRCS technical guide access road standard 560 (October, 2014).
ATCP 50.885(4)(a)2. 2. NRCS technical guide streambank and shoreline protection standard 580 (August, 2013).
ATCP 50.885(4)(a)3. 3. NRCS technical guide fence standard 382 (January, 2014).
ATCP 50.885(4)(a)4. 4. NRCS technical guide stream crossing standard 578 (March, 2015).
ATCP 50.885(4)(b) (b) The landowner agrees to maintain the stream crossing for 10 years unless the farming operations on the affected land are discontinued or the practice is no longer required to prevent the soil and water resource problem for which the practice was installed.
ATCP 50.885 History History: CR 13-016: cr. Register February 2014 No. 698, eff. 5-1-14; CR 14-047: am. (4) (a) 1. to 3. Register May 2015 No. 713, eff. 6-1-15; CR 16-012: am. (4) (a) 1., 2., 4. Register August 2016 No. 728, eff. 9-1-16; CR 16-083: am. (4) (a) 2. Register January 2018 No. 745, eff. 2-1-18.
ATCP 50.89 ATCP 50.89Stripcropping.
ATCP 50.89(1) (1) Definition. In this section, “stripcropping" means growing crops in a systematic strip arrangement in which strips of grass, legumes, or other close growing crops are alternated with strips of clean tilled crops or fallow, and in which all of the strips are established on the contour or across a slope to reduce water or wind erosion.
ATCP 50.89(2) (2)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse the cost of establishing a stripcropping system, including costs for the necessary removal of obstructions.
ATCP 50.89(3) (3)Design, construction, and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse the cost of establishing a stripcropping system unless all of the following conditions are met:
ATCP 50.89(3)(a) (a) The stripcropping operations are performed, to the maximum extent feasible, on the contour.
ATCP 50.89(3)(b) (b) The stripcropping system complies with all of the following that apply:
ATCP 50.89(3)(b)1. 1. NRCS technical guide obstruction removal standard 500 (July, 2016).
ATCP 50.89(3)(b)2. 2. NRCS technical guide stripcropping standard 585 (June, 2016).
ATCP 50.89(3)(c) (c) The landowner agrees to maintain the stripcropping for 10 years unless farming operations on the affected land are discontinued.
ATCP 50.89 History History: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (title), (1) to (3) (b) (intro.), (b) 2. and (c) Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (3) (b) 1., 2., r. (3) (b) 3., 4. Register February 2014 No. 698, eff. 5-1-14; CR 16-083: am. (3) (b) 1., 2. Register January 2018 No. 745, eff. 2-1-18.
ATCP 50.90 ATCP 50.90Subsurface drains.
ATCP 50.90(1) (1) Definition. In this section, “subsurface drain" means a conduit installed below the surface of the ground to collect drainage water and convey it to a suitable outlet.
ATCP 50.90(2) (2)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse the cost of designing and constructing a subsurface drain as part of a manure storage system, barnyard runoff control system, or erosion control system.
ATCP 50.90(3) (3)Design, construction, and maintenance. A cost-share grant may not reimburse the cost of establishing a subsurface drain unless all of the following conditions are met:
ATCP 50.90(3)(a) (a) The subsurface drain is a necessary component of a manure storage system, barnyard runoff control system, or erosion control system.
ATCP 50.90(3)(b) (b) The subsurface drain complies with all of the following that apply:
ATCP 50.90(3)(b)1. 1. NRCS technical guide subsurface drain standard 606 (March, 2014).
ATCP 50.90(3)(b)2. 2. NRCS technical guide underground outlet standard 620 (March, 2014).
ATCP 50.90(3)(c) (c) The landowner agrees to maintain the subsurface drain for 10 years unless farming operations on the affected land are discontinued.
ATCP 50.90 History History: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (3) (b) 1. Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (3) (b) 1., 2. Register February 2014 No. 698, eff. 5-1-14; CR 14-047: am. (3) (b) 1., 2. Register May 2015 No. 713, eff. 6-1-15.
ATCP 50.91 ATCP 50.91Terrace systems.
ATCP 50.91(1) (1) Definition. In this section, “terrace system" means a system of ridges and channels installed on the contour with a non-erosive grade and suitable spacing.
ATCP 50.91(2) (2)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse any of the following costs related to a terrace system:
ATCP 50.91(2)(a) (a) Costs to install the system, including necessary costs for necessary leveling, filling, and obstruction removal.
ATCP 50.91(2)(b) (b) Costs to purchase and install necessary underground pipe outlets and other necessary mechanical outlets.
ATCP 50.91(2)(c) (c) Costs to modify an ineffective system, unless the system has been rendered ineffective because of changes in cropping patterns or equipment usage.
ATCP 50.91(2)(d) (d) Costs to establish permanent vegetative cover, or to provide temporary cover until permanent cover is established. This may include costs for mulch, fertilizer, and other necessary materials.
ATCP 50.91(3) (3)Design, construction, and maintenance. A cost-share grant may not reimburse terrace system costs unless all of the following conditions are met:
ATCP 50.91(3)(a) (a) The terrace system includes a stable outlet or waterway of adequate capacity.
ATCP 50.91(3)(b) (b) The terrace system complies with all of the following that apply:
ATCP 50.91(3)(b)1. 1. NRCS technical guide critical area planting standard 342 (August, 2016).
ATCP 50.91(3)(b)2. 2. NRCS technical guide grassed waterway standard 412 (July, 2016).
ATCP 50.91(3)(b)3. 3. NRCS technical guide lined waterway or outlet standard 468 (March, 2013).
ATCP 50.91(3)(b)4. 4. NRCS technical guide obstruction removal standard 500 (July, 2016).
ATCP 50.91(3)(b)5. 5. NRCS technical guide terrace standard 600 (March, 2015).
ATCP 50.91(3)(b)6. 6. NRCS technical guide subsurface drain standard 606 (March, 2014).
ATCP 50.91(3)(b)7. 7. NRCS technical guide underground outlet standard 620 (March, 2014).
ATCP 50.91(3)(b)8. 8. NRCS technical guide water and sediment control basin standard 638 (August, 2016).
ATCP 50.91(3)(c) (c) The landowner agrees to maintain the terrace system for 10 years unless farming operations on the affected land are discontinued.
ATCP 50.91 History History: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (3) (b) 1. to 3., 5. and 6. Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (3) (b) 1. to 8. Register February 2014 No. 698, eff. 5-1-14; CR 14-047: am. (3) (b) 6., 7. Register May 2015 No. 713, eff. 6-1-15; CR 16-012: am. (3) (b) 2., 5. Register August 2016 No. 728, eff. 9-1-16; CR 16-083: am. (3) (b) 1., 2., 4., 8. Register January 2018 No. 745, eff. 2-1-18.
ATCP 50.92 ATCP 50.92Underground outlets.
ATCP 50.92(1) (1) Definition. In this section, “underground outlet" means a conduit installed below the surface of the ground to collect surface water and convey it to a suitable outlet.
ATCP 50.92(2) (2)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse the cost of designing and constructing an underground outlet as part of a manure storage system, barnyard runoff control system, or erosion control system.
ATCP 50.92(3) (3)Design, construction, and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse the cost of establishing an underground outlet unless all of the following conditions are met:
ATCP 50.92(3)(a) (a) The underground outlet is a necessary component of a manure storage system, barnyard runoff control system, or erosion control system.
ATCP 50.92(3)(b) (b) The underground outlet complies with all of the following that apply:
ATCP 50.92(3)(b)1. 1. NRCS technical guide subsurface drain standard 606 (March, 2014).
ATCP 50.92(3)(b)2. 2. NRCS technical guide underground outlet standard 620 (March, 2014).
ATCP 50.92(3)(c) (c) The landowner agrees to maintain the underground outlet for 10 years unless farming operations on the affected land are discontinued.
ATCP 50.92 History History: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (3) (b) 1. Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (3) (b) 1., 2. Register February 2014 No. 698, eff. 5-1-14; CR14-047: am. (3) (b) 1., 2. Register May 2015 No. 713, eff. 6-1-15.
ATCP 50.93 ATCP 50.93Waste transfer systems.
ATCP 50.93(1) (1) Definition. In this section, “waste transfer system" means components such as pumps, pipes, conduits, valves, and other structures installed to convey manure and milking center wastes from buildings and animal feeding operations to a storage structure, loading area, or treatment area.
ATCP 50.93(2) (2)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse the cost of designing and constructing a waste transfer system which is a necessary component of a manure storage system, barnyard runoff control system, or milking center waste system funded under this chapter, provided that the waste transfer system is designed and used for that sole purpose.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.