AB50,115111Section 1151. 66.0825 (4) (b) of the statutes is amended to read:
AB50,592,161266.0825 (4) (b) Any contract entered into under this section shall be filed with
13the secretary of state administration. Upon receipt, the secretary shall record the
14contract and issue a certificate of incorporation stating the name of the company
15and the date and fact of incorporation. Upon issuance of the certificate, the
16existence of the company shall begin.
AB50,115217Section 1152. 66.0901 (1) (ae) of the statutes is repealed.
AB50,115318Section 1153. 66.0901 (1) (am) of the statutes is repealed.
AB50,115419Section 1154. 66.0901 (6) of the statutes is amended to read:
AB50,593,82066.0901 (6) Separation of contracts; classification of contractors. In
21public contracts for the construction, repair, remodeling or improvement of a public
22building or structure, other than highway structures and facilities, a municipality
23may bid projects based on a single or multiple division of the work. Public contracts

1shall be awarded according to the division of work selected for bidding. Except as
2provided in sub. (6m), the The municipality may set out in any public contract
3reasonable and lawful conditions as to the hours of labor, wages, residence,
4character and classification of workers to be employed by any contractor, classify
5contractors as to their financial responsibility, competency and ability to perform
6work and set up a classified list of contractors. The municipality may reject the bid
7of any person, if the person has not been classified for the kind or amount of work in
8the bid.
AB50,11559Section 1155. 66.0901 (6m) of the statutes is repealed.
AB50,115610Section 1156. 66.0901 (6s) of the statutes is repealed.
AB50,115711Section 1157. 66.0903 (1) (a), (am), (b), (cm), (dr), (em), (hm) and (im) of the
12statutes are created to read:
AB50,593,211366.0903 (1) (a) Area means the county in which a proposed project of public
14works that is subject to this section is located or, if the department determines that
15there is insufficient wage data in that county, area means those counties that are
16contiguous to that county or, if the department determines that there is insufficient
17wage data in those counties, area means those counties that are contiguous to
18those counties or, if the department determines that there is insufficient wage data
19in those counties, area means the entire state or, if the department is requested to
20review a determination under sub. (3) (br), area means the city, village, or town in
21which a proposed project of public works that is subject to this section is located.
AB50,593,2222(am) Bona fide economic benefit has the meaning given in s. 103.49 (1) (am).
AB50,593,2323(b) Department means the department of workforce development.
AB50,594,1
1(cm) Insufficient wage data has the meaning given in s. 103.49 (1) (bg).
AB50,594,102(dr) Minor service or maintenance work means a project of public works
3that is limited to minor crack filling, chip or slurry sealing, or other minor
4pavement patching, not including overlays, that has a projected life span of no
5longer than 5 years or that is performed for a town and is not funded under s. 86.31,
6regardless of projected life span; the depositing of gravel on an existing gravel road
7applied solely to maintain the road; road shoulder maintenance; cleaning of
8drainage or sewer ditches or structures; or any other limited, minor work on public
9facilities or equipment that is routinely performed to prevent breakdown or
10deterioration.
AB50,594,1211(em) Multiple-trade project of public works has the meaning given in s.
12103.49 (1) (br).
AB50,594,1413(hm) Single-trade project of public works has the meaning given in s. 103.49
14(1) (em).
AB50,594,1615(im) Supply and installation contract has the meaning given in s. 103.49 (1)
16(fm).
AB50,115817Section 1158. 66.0903 (1) (c) of the statutes is amended to read:
AB50,594,191866.0903 (1) (c) Hourly basic rate of pay has the meaning given in s. 16.856
19103.49 (1) (b), 2015 stats.
AB50,115920Section 1159. 66.0903 (1) (f) of the statutes is amended to read:
AB50,594,222166.0903 (1) (f) Prevailing hours of labor has the meaning given in s. 16.856
22103.49 (1) (e), 2015 stats. (c).
AB50,1160
1Section 1160. 66.0903 (1) (g) of the statutes is repealed and recreated to
2read:
AB50,595,4366.0903 (1) (g) Prevailing wage rate has the meaning given in s. 103.49 (1)
4(d).
AB50,11615Section 1161. 66.0903 (1) (j) of the statutes is amended to read:
AB50,595,7666.0903 (1) (j) Truck driver includes an owner-operator of a truck has the
7meaning given in s. 103.49 (1) (g).
AB50,11628Section 1162. 66.0903 (1m) (b) of the statutes is amended to read:
AB50,595,23966.0903 (1m) (b) The legislature finds that the enactment of ordinances or
10other enactments by local governmental units requiring laborers, workers,
11mechanics, and truck drivers employed on projects of public works or on publicly
12funded private construction projects to be paid the prevailing wage rate and to be
13paid at least 1.5 times their hourly basic rate of pay for hours worked in excess of the
14prevailing hours of labor would be logically inconsistent with, would defeat the
15purpose of, and would go against the repeals spirit of this section and the repeal of
16s. 66.0904, 2009 stats., and s. 66.0903 (2) to (12), 2013 stats. Therefore, this section
17shall be construed as an enactment of statewide concern for the purposes of
18facilitating broader participation with respect to bidding on projects of public
19works, ensuring that wages accurately reflect market conditions, providing local
20governments with the flexibility to reduce costs on capital projects, and reducing
21spending at all levels of government in this state purpose of providing uniform
22prevailing wage rate and prevailing hours of labor requirements throughout the
23state.
AB50,1163
1Section 1163. 66.0903 (2) to (12) of the statutes are created to read:
AB50,596,4266.0903 (2) Applicability. Subject to sub. (5), this section applies to any
3project of public works erected, constructed, repaired, remodeled, or demolished for
4a local governmental unit, including all of the following:
AB50,596,55(a) A highway, street, bridge, building, or other infrastructure project.
AB50,596,96(b) A project erected, constructed, repaired, remodeled, or demolished by one
7local governmental unit for another local governmental unit under a contract under
8s. 66.0301 (2), 83.03, 83.035, or 86.31 (2) (b) or under any other statute specifically
9authorizing cooperation between local governmental units.
AB50,596,1310(c) A project in which the completed facility is leased, purchased, lease
11purchased, or otherwise acquired by, or dedicated to, a local governmental unit in
12lieu of the local governmental unit contracting for the erection, construction, repair,
13remodeling, or demolition of the facility.
AB50,596,1714(d) A road, street, bridge, sanitary sewer, or water main project in which the
15completed road, street, bridge, sanitary sewer, or water main is acquired by, or
16dedicated to, a local governmental unit, including under s. 236.13 (2), for ownership
17or maintenance by the local governmental unit.
AB50,597,618(3) Prevailing wage rates and hours of labor. (am) A local governmental
19unit, before making a contract by direct negotiation or soliciting bids on a contract
20for the erection, construction, remodeling, repairing, or demolition of any project of
21public works, shall apply to the department to determine the prevailing wage rate
22for each trade or occupation required in the work contemplated. The department
23shall conduct investigations and hold public hearings as necessary to define the

1trades or occupations that are commonly employed on projects of public works that
2are subject to this section and to inform itself of the prevailing wage rates in all
3areas of the state for those trades or occupations, in order to determine the
4prevailing wage rate for each trade or occupation. The department shall issue its
5determination within 30 days after receiving the request and shall file the
6determination with the requesting local governmental unit.
AB50,597,137(ar) The department shall, by January 1 of each year, compile the prevailing
8wage rates for each trade or occupation in each area. The compilation shall, in
9addition to the current prevailing wage rates, include future prevailing wage rates
10when those prevailing wage rates can be determined for any trade or occupation in
11any area and shall specify the effective date of those future prevailing wage rates.
12If a project of public works extends into more than one area, the department shall
13determine only one standard of prevailing wage rates for the entire project.
AB50,597,2114(av) In determining prevailing wage rates under par. (am) or (ar), the
15department may not use data from projects that are subject to this section, s. 103.49
16or 103.50, or 40 USC 3142 unless the department determines that there is
17insufficient wage data in the area to determine those prevailing wage rates, in
18which case the department may use data from projects that are subject to this
19section, s. 103.49 or 103.50, or 40 USC 3142. In determining prevailing wage rates
20under par. (am) or (ar), the department may not use data from any construction
21work that is performed by a local governmental unit or a state agency.
AB50,598,722(bm) Any person may request a recalculation of any portion of an initial
23determination within 30 days after the initial determination date if the person

1submits evidence with the request showing that the prevailing wage rate for any
2given trade or occupation included in the initial determination does not represent
3the prevailing wage rate for that trade or occupation in the area. The evidence shall
4include wage rate information reflecting work performed by individuals working in
5the contested trade or occupation in the area during the current survey period. The
6department shall affirm or modify the initial determination within 15 days after
7the date on which the department receives the request for recalculation.
AB50,598,218(br) In addition to the recalculation under par. (bm), the local governmental
9unit that requested the determination under this subsection may request a review
10of any portion of a determination within 30 days after the date of issuance of the
11determination if the local governmental unit submits evidence with the request
12showing that the prevailing wage rate for any given trade or occupation included in
13the determination does not represent the prevailing wage rate for that trade or
14occupation in the city, village, or town in which the proposed project of public works
15is located. That evidence shall include wage rate information for the contested
16trade or occupation on at least 3 similar projects located in the city, village, or town
17where the proposed project of public works is located and on which some work has
18been performed during the current survey period and which were considered by the
19department in issuing its most recent compilation under par. (ar). The department
20shall affirm or modify the determination within 15 days after the date on which the
21department receives the request for review.
AB50,599,1122(dm) A local governmental unit that is subject to this section shall include a
23reference to the prevailing wage rates determined by the department and to the

1prevailing hours of labor in the notice published for the purpose of securing bids for
2the project of public works. Except as otherwise provided in this paragraph, if any
3contract or subcontract for a project of public works is entered into, the prevailing
4wage rates determined by the department and the prevailing hours of labor shall be
5physically incorporated into and made a part of the contract or subcontract. For a
6minor subcontract, as determined by the department, the department shall
7prescribe by rule the method of notifying the minor subcontractor of the prevailing
8wage rates and prevailing hours of labor applicable to the minor subcontract. The
9prevailing wage rates and prevailing hours of labor applicable to a contract or
10subcontract may not be changed during the time that the contract or subcontract is
11in force.
AB50,599,1312(e) No contractor, subcontractor, or contractors or subcontractors agent that
13is subject to this section may do any of the following:
AB50,599,16141. Pay an individual performing the work described in sub. (4) less than the
15prevailing wage rate in the same or most similar trade or occupation determined
16under this subsection.
AB50,599,21172. Allow an individual performing the work described in sub. (4) to work a
18greater number of hours per day or per week than the prevailing hours of labor,
19unless the contractor, subcontractor, or contractors or subcontractors agent pays
20the individual for all hours worked in excess of the prevailing hours of labor at a
21rate of at least 1.5 times the individuals hourly basic rate of pay.
AB50,600,422(4) Covered employees. (a) Subject to par. (b), any person subject to this
23section shall pay all of the following employees the prevailing wage rate determined

1under sub. (3) and may not allow such employees to work a greater number of hours
2per day or per week than the prevailing hours of labor, unless the person pays the
3employee for all hours worked in excess of the prevailing hours of labor at a rate of
4at least 1.5 times the employees hourly basic rate of pay:
AB50,600,651. All laborers, workers, mechanics, and truck drivers employed on the site of
6a project of public works that is subject to this section.
AB50,600,1272. All laborers, workers, mechanics, and truck drivers employed in the
8manufacturing or furnishing of materials, articles, supplies, or equipment on the
9site of a project of public works that is subject to this section or from a facility
10dedicated exclusively, or nearly so, to a project of public works that is subject to this
11section by a contractor, subcontractor, agent, or other person performing any work
12on the site of the project.
AB50,600,2013(b) A laborer, worker, mechanic, or truck driver who is employed to process,
14manufacture, pick up, or deliver materials or products from a commercial
15establishment that has a fixed place of business from which the establishment
16supplies processed or manufactured materials or products or from a facility that is
17not dedicated exclusively, or nearly so, to a project of public works that is subject to
18this section is not entitled to receive the prevailing wage rate determined under
19sub. (3) or to receive at least 1.5 times his or her hourly basic rate of pay for all hours
20worked in excess of the prevailing hours of labor unless any of the following applies:
AB50,601,2211. The laborer, worker, mechanic, or truck driver is employed to go to the
22source of mineral aggregate such as sand, gravel, or stone and deliver that mineral
23aggregate to the site of a project of public works that is subject to this section by

1depositing the material directly in final place, from the transporting vehicle or
2through spreaders from the transporting vehicle.
AB50,601,632. The laborer, worker, mechanic, or truck driver is employed to go to the site
4of a project of public works that is subject to this section, pick up excavated material
5or spoil from the site of the project, and transport that excavated material or spoil
6away from the site of the project.
AB50,601,87(c) A person subject to this section shall pay a truck driver who is an owner-
8operator of a truck separately for his or her work and for the use of his or her truck.
AB50,601,99(5) Nonapplicability. This section does not apply to any of the following:
AB50,601,1610(a) A single-trade project of public works for which the estimated project cost
11of completion is less than $48,000, a multiple-trade project of public works for which
12the estimated project cost of completion is less than $100,000, or, in the case of a
13multiple-trade project of public works erected, constructed, repaired, remodeled, or
14demolished by a private contractor for a city or village having a population of less
15than 2,500 or for a town, a multiple-trade project of public works for which the
16estimated project cost of completion is less than $234,000.
AB50,601,2017(b) Work performed on a project of public works for which the local
18governmental unit contracting for the project is not required to compensate any
19contractor, subcontractor, contractors or subcontractors agent, or individual for
20performing the work.
AB50,601,2221(c) Minor service or maintenance work, warranty work, or work under a
22supply and installation contract.
AB50,602,223(f) A project of public works involving the erection, construction, repair,

1remodeling, or demolition of a residential property containing 2 dwelling units or
2less.
AB50,602,83(g) A road, street, bridge, sanitary sewer, or water main project that is a part
4of a development in which not less than 90 percent of the lots contain or will contain
52 dwelling units or less, as determined by the local governmental unit at the time of
6approval of the development, and that, on completion, is acquired by, or dedicated
7to, a local governmental unit, including under s. 236.13 (2), for ownership or
8maintenance by the local governmental unit.
AB50,602,149(8) Posting. A local governmental unit that has contracted for a project of
10public works shall post the prevailing wage rates determined by the department,
11the prevailing hours of labor, and the provisions of subs. (10) (a) and (11) (a) in at
12least one conspicuous place on the site of the project that is easily accessible by
13employees working on the project, or, if there is no common site on the project, at the
14place normally used by the local governmental unit to post public notices.
AB50,602,2315(9) Compliance. (a) When the department finds that a local governmental
16unit has not requested a determination under sub. (3) (am) or that a local
17governmental unit, contractor, or subcontractor has not physically incorporated a
18determination into a contract or subcontract as required under this section or has
19not notified a minor subcontractor of a determination in the manner prescribed by
20the department by rule promulgated under sub. (3) (dm), the department shall
21notify the local governmental unit, contractor, or subcontractor of the
22noncompliance and shall file the determination with the local governmental unit,
23contractor, or subcontractor within 30 days after the notice.
AB50,603,5
1(b) Upon completion of a project of public works and before receiving final
2payment for his or her work on the project, each agent or subcontractor shall
3furnish the contractor with an affidavit stating that the agent or subcontractor has
4complied fully with the requirements of this section. A contractor may not
5authorize final payment until the affidavit is filed in proper form and order.
AB50,603,206(c) Upon completion of a project of public works and before receiving final
7payment for his or her work on the project, each contractor shall file with the local
8governmental unit authorizing the work an affidavit stating that the contractor has
9complied fully with the requirements of this section and that the contractor has
10received an affidavit under par. (b) from each of the contractors agents and
11subcontractors. A local governmental unit may not authorize a final payment until
12the affidavit is filed in proper form and order. If a local governmental unit
13authorizes a final payment before an affidavit is filed in proper form and order or if
14the department determines, based on the greater weight of the credible evidence,
15that any person performing the work specified in sub. (4) has been or may have been
16paid less than the prevailing wage rate or less than 1.5 times the hourly basic rate
17of pay for all hours worked in excess of the prevailing hours of labor and requests
18that the local governmental unit withhold all or part of the final payment, but the
19local governmental unit fails to do so, the local governmental unit is liable for all
20back wages payable up to the amount of the final payment.
AB50,604,421(10) Records; inspection; enforcement. (a) Each contractor,
22subcontractor, or contractors or subcontractors agent that performs work on a
23project of public works that is subject to this section shall keep full and accurate

1records clearly indicating the name and trade or occupation of every individual
2performing the work described in sub. (4) and an accurate record of the number of
3hours worked by each of those individuals and the actual wages paid for the hours
4worked.
AB50,604,135(b) The department or the contracting local governmental unit may demand
6and examine, and every contractor, subcontractor, and contractors or
7subcontractors agent shall keep, and furnish upon request by the department or
8local governmental unit, copies of payrolls and other records and information
9relating to the wages paid to individuals performing the work described in sub. (4)
10for work to which this section applies. The department may inspect records in the
11manner provided in ch. 103. Every contractor, subcontractor, or agent performing
12work on a project of public works that is subject to this section is subject to the
13requirements of ch. 103 relating to the examination of records.
AB50,605,414(c) If requested by any person, the department shall inspect the payroll
15records of any contractor, subcontractor, or agent performing work on a project of
16public works that is subject to this section as provided in this paragraph to ensure
17compliance with this section. On receipt of such a request, the department shall
18request that the contractor, subcontractor, or agent submit to the department a
19certified record of the information specified in par. (a), other than personally
20identifiable information relating to an employee of the contractor, subcontractor, or
21agent, for no longer than a 4-week period. The department may request that a
22contractor, subcontractor, or agent submit those records no more than once per
23calendar quarter for each project of public works on which the contractor,

1subcontractor, or agent is performing work. The department may not charge a
2requester a fee for obtaining that information. Certified records submitted to the
3department under this paragraph are open for public inspection and copying under
4s. 19.35 (1).
AB50,605,105(d) Section 103.005 (5) (f), (11), (12), and (13) applies to this section, except
6that s. 103.005 (12) (a) does not apply to a person who fails to provide any
7information to the department to assist the department in determining prevailing
8wage rates under sub. (3) (am) or (ar). Section 111.322 (2m) applies to discharge
9and other discriminatory acts arising in connection with any proceeding under this
10section, including proceedings under sub. (11) (a).
AB50,605,1711(11) Liability and penalties. (a) 1. A contractor, subcontractor, or
12contractors or subcontractors agent who fails to pay the prevailing wage rate
13determined by the department under sub. (3) or who pays less than 1.5 times the
14hourly basic rate of pay for all hours worked in excess of the prevailing hours of
15labor is liable to any affected employee in the amount of his or her unpaid wages or
16his or her unpaid overtime compensation and in an additional amount as liquidated
17damages as provided under subd. 2. or 3., whichever is applicable.
AB50,606,3182. If the department determines upon inspection under sub. (10) (b) or (c) that
19a contractor, subcontractor, or contractors or subcontractors agent has failed to
20pay the prevailing wage rate determined by the department under sub. (3) or has
21paid less than 1.5 times the hourly basic rate of pay for all hours worked in excess of
22the prevailing hours of labor, the department shall order the contractor to pay to
23any affected employee the amount of his or her unpaid wages or his or her unpaid

1overtime compensation and an additional amount equal to 100 percent of the
2amount of those unpaid wages or that unpaid overtime compensation as liquidated
3damages within a period specified by the department in the order.
AB50,606,1543. In addition to or in lieu of recovering the liability specified in subd. 1. as
5provided in subd. 2., any employee for and on behalf of that employee and other
6employees similarly situated may commence an action to recover that liability in
7any court of competent jurisdiction. If the court finds that a contractor,
8subcontractor, or contractors or subcontractors agent has failed to pay the
9prevailing wage rate determined by the department under sub. (3) or has paid less
10than 1.5 times the hourly basic rate of pay for all hours worked in excess of the
11prevailing hours of labor, the court shall order the contractor, subcontractor, or
12agent to pay to any affected employee the amount of his or her unpaid wages or his
13or her unpaid overtime compensation and an additional amount equal to 100
14percent of the amount of those unpaid wages or that unpaid overtime compensation
15as liquidated damages.
AB50,606,20165. No employee may be a party plaintiff to an action under subd. 3. unless the
17employee consents in writing to become a party and the consent is filed in the court
18in which the action is brought. Notwithstanding s. 814.04 (1), the court shall, in
19addition to any judgment awarded to the plaintiff, allow reasonable attorney fees
20and costs to be paid by the defendant.
AB50,607,221(b) 1. Except as provided in subds. 2., 4., and 6., any contractor, subcontractor,
22or contractors or subcontractors agent who violates this section may be fined not

1more than $200 or imprisoned for not more than 6 months or both. Each day that
2any violation continues is a separate offense.
AB50,607,1132. Whoever induces any individual who seeks to be or is employed on any
4project of public works that is subject to this section to give up, waive, or return any
5part of the wages to which the individual is entitled under the contract governing
6the project, or who reduces the hourly basic rate of pay normally paid to an
7individual for work on a project that is not subject to this section during a week in
8which the individual works both on a project of public works that is subject to this
9section and on a project that is not subject to this section, by threat not to employ, by
10threat of dismissal from employment, or by any other means is guilty of an offense
11under s. 946.15 (1).
AB50,607,21123. Any individual employed on a project of public works that is subject to this
13section who knowingly allows a contractor, subcontractor, or contractors or
14subcontractors agent to pay him or her less than the prevailing wage rate set forth
15in the contract governing the project, who gives up, waives, or returns any part of
16the compensation to which he or she is entitled under the contract, or who gives up,
17waives, or returns any part of the compensation to which he or she is normally
18entitled for work on a project that is not subject to this section during a week in
19which the individual works both on a project of public works that is subject to this
20section and on a project that is not subject to this section, is guilty of an offense
21under s. 946.15 (2).
AB50,608,4224. Whoever induces any individual who seeks to be or is employed on any
23project of public works that is subject to this section to allow any part of the wages

1to which the individual is entitled under the contract governing the project to be
2deducted from the individuals pay is guilty of an offense under s. 946.15 (3), unless
3the deduction would be allowed under 29 CFR 3.5 or 3.6 from an individual who is
4working on a project that is subject to 40 USC 3142.
AB50,608,1055. Any individual who is employed on a project of public works that is subject
6to this section who knowingly allows any part of the wages to which he or she is
7entitled under the contract governing the project to be deducted from his or her pay
8is guilty of an offense under s. 946.15 (4), unless the deduction would be allowed
9under 29 CFR 3.5 or 3.6 from an individual who is working on a project that is
10subject to 40 USC 3142.
AB50,608,13116. Subdivision 1. does not apply to any person who fails to provide any
12information to the department to assist the department in determining prevailing
13wage rates under sub. (3) (am) or (ar).
AB50,609,314(12) Debarment. (a) Except as provided under pars. (b) and (c), the
15department shall notify any local governmental unit applying for a determination
16under sub. (3) of the names of all persons that the department has found to have
17failed to pay the prevailing wage rate determined under sub. (3) or has found to
18have paid less than 1.5 times the hourly basic rate of pay for all hours worked in
19excess of the prevailing hours of labor at any time in the preceding 3 years. The
20department shall include with each name the address of the person and shall
21specify when the person failed to pay the prevailing wage rate and when the person
22paid less than 1.5 times the hourly basic rate of pay for all hours worked in excess of
23the prevailing hours of labor. A local governmental unit may not award any

1contract to the person unless otherwise recommended by the department or unless
23 years have elapsed from the date the department issued its findings or the date of
3final determination by a court of competent jurisdiction, whichever is later.
AB50,609,94(b) The department may not include in a notification under par. (a) the name
5of any person on the basis of having subcontracted a contract for a project of public
6works to a person that the department has found to have failed to pay the prevailing
7wage rate determined under sub. (3) or has found to have paid less than 1.5 times
8the hourly basic rate of pay for all hours worked in excess of the prevailing hours of
9labor.
AB50,609,1310(c) This subsection does not apply to any contractor, subcontractor, or agent
11who in good faith commits a minor violation of this section, as determined on a case-
12by-case basis through administrative hearings with all rights to due process
13afforded to all parties or who has not exhausted or waived all appeals.
AB50,609,2314(d) Any person submitting a bid or negotiating a contract on a project of public
15works that is subject to this section shall, on the date the person submits the bid or
16negotiates the contract, identify any construction business in which the person, or a
17shareholder, officer, or partner of the person, if the person is a business, owns, or
18has owned at least a 25 percent interest on the date the person submits the bid or
19negotiates the contract or at any other time within 3 years preceding the date the
20person submits the bid or negotiates the contract, if the business has been found to
21have failed to pay the prevailing wage rate determined under sub. (3) or to have
22paid less than 1.5 times the hourly basic rate of pay for all hours worked in excess of
23the prevailing hours of labor.
AB50,610,1
1(e) The department shall promulgate rules to administer this subsection.
AB50,11642Section 1164. 66.10012 of the statutes is created to read:
AB50,610,3366.10012 Workforce housing. (1) Definitions. In this section:
AB50,610,44(a) Housing agency means the department of administration.
AB50,610,65(b) Housing grant means any grant administered by the department of
6administration under s. 16.303 or 16.309.
AB50,610,77(c) Political subdivision means any city, village, town, or county.
AB50,610,118(d) Workforce housing means housing to which all of the following apply, as
9adjusted for family size and the county in which the household is located, based on
10the countys 5-year average median income and housing costs as calculated by the
11U.S. bureau of the census in its American community survey:
AB50,610,13121. The housing costs a household no more than 30 percent of the households
13gross median income.
AB50,610,16142. The residential units of the housing are for initial occupancy by individuals
15whose household median income is no more than 120 percent of the countys gross
16median income.
AB50,610,1917(2) Housing initiatives. (a) Subject to par. (b), to implement a workforce
18housing initiative, a political subdivision may enact an ordinance, adopt a
19resolution, or put into effect a policy to accomplish any of the following:
AB50,610,21201. Reduce by at least 10 percent the processing time for all permits related to
21workforce housing.
AB50,610,23222. Reduce by at least 10 percent the cost of impact fees that a political
23subdivision may impose on developments that include workforce housing units.
Loading...