Forest nursery stock seedling surcharge repealed [S.Sub.Amdt.2: Sec. 216] -
SB70Hunting and fishing approvals: certain nonresident fees increased; conservation fund provision [S.Sub.Amdt.2: Sec. 144, 217-231, 9232 (1)] -
SB70ID card issued by DOT to establish residency for DNR approvals allowed; DOT to allow DNR access to certain records -
AB306ID card issued by DOT to establish residency for DNR approvals allowed; DOT to allow DNR access to certain records -
SB310Lac du Flambeau band of Lake Superior Chippewa: unencumbered balance in appropriation revert to Indian gaming receipts appropriation [Sec. 379] -
AB43Lac du Flambeau band of Lake Superior Chippewa: unencumbered balance in appropriation revert to Indian gaming receipts appropriation [Sec. 379] [original bill only] -
SB70Large dams: permit and approval fees changed [Sec. 635, 636, 9432 (1)] -
AB43Large dams: permit and approval fees changed [Sec. 635, 636, 9432 (1)] [original bill only] -
SB70Nonpoint source water pollution abatement: bonding authority increased [Sec. 547] -
AB43Nonpoint source water pollution abatement: bonding authority increased [Sec. 547; S.Sub.Amdt.2: further revisions, appropriation created, Sec. 80] -
SB70PFAS group of substances: DNR to establish and enforce standards, emergency rules provision [Sec. 2321-2323, 2643, 2665, 2667, 2668, 2672, 2673, 9132 (3)-(6), 9432 (2)] -
AB43PFAS group of substances: DNR to establish and enforce standards, emergency rules provision [Sec. 2321-2323, 2643, 2665, 2667, 2668, 2672, 2673, 9132 (3)-(6), 9432 (2)] [original bill only] -
SB70PFAS proposed rule that exceeds economic impact analyses: DNR authorized to resume permanent rule-making process (introduced per s. 227.139 (2)(a), Wis.Stats.) -
AB1173PFAS proposed rule that exceeds economic impact analyses: DNR authorized to resume permanent rule-making process (introduced per s. 227.139 (2)(a), Wis.Stats.) -
SB1079PFAS trust fund created [S.Sub.Amdt.2: Sec. 79, 197, 210, 9232 (2)-(4)] -
SB70Products containing PFAS that were intentionally added: sale or distribution of prohibited; DNR provision -
AB1194Products containing PFAS that were intentionally added: sale or distribution of prohibited; DNR provision -
SB1093Terrestrial invasive species prevention: appropriation from conservation fund [Sec. 365] -
AB43Terrestrial invasive species prevention: appropriation from conservation fund [Sec. 365] [original bill only] -
SB70Water resources account lapse to the conservation fund [Sec. 9232 (2)] -
AB43Water resources account lapse to the conservation fund [Sec. 9232 (2)] [original bill only] -
SB70Well construction notification fee increased [Sec. 2644] -
AB43Well construction notification fee increased [Sec. 2644] [original bill only] -
SB70Well construction variances application fee [Sec. 2645] -
AB43Well construction variances application fee [Sec. 2645] [original bill only] -
SB70Well drilling, heat exchange drilling, or pump installing license applicants: exam administration (remedial legislation suggested by DNR) -
AB1102Well drilling, heat exchange drilling, or pump installing license applicants: exam administration (remedial legislation suggested by DNR) -
SB1055WPDES permit violations: notification requirements [Sec. 2664, 9132 (11), 9432 (7)] -
AB43WPDES permit violations: notification requirements [Sec. 2664, 9132 (11), 9432 (7)] [original bill only] -
SB70Aquatic plant management permit program appropriation changes [Sec. 360] -
AB43Aquatic plant management permit program appropriation changes [Sec. 360] [original bill only] -
SB70Aquatic plant management plans and permit considerations and exemptions -
AB318Aquatic plant management plans and permit considerations and exemptions [S.Amdt.1: further revisions] -
SB316Artificial bodies of water re nonmetallic mining reclamation: construction or enlargement permit requirements modified; rule revised [Admin.Code NR 135.02] -
AB320Asphalt or concrete plant at nonmetallic mining site: subject to reclamation ordinances and rules; reclamation plan provisions; rules revised [Admin.Code NR 135.02, 135.03, 135.19] -
AB319Battery manufacturers required to administer battery collection and recycling programs; DNR duties; report and penalty provisions -
AB1205Clean Water Fund Program funding: projects for the reduction of infiltration and inflow in connecting laterals and sewer lines are eligible -
AB100Clean Water Fund Program funding: projects for the reduction of infiltration and inflow in connecting laterals and sewer lines are eligible -
SB99County forest administration grant eligibility changes -
AB1162County forest administration grant eligibility changes -
SB1070County forest administration grants and county sustainable forestry program: appropriation changes [Sec. 363, 369, 614, 615] -
AB43County forest administration grants and county sustainable forestry program: appropriation changes [Sec. 363, 369, 614, 615] [original bill only] -
SB70CWD research and management funding -
AB884CWD research and management funding -
SB798Dam on Sheboygan River at the Sheboygan Marsh: funding for removal and reconstruction [Sec. 9132 (12)] -
AB43Dam on Sheboygan River at the Sheboygan Marsh: funding for removal and reconstruction [Sec. 9132 (12); S.Sub.Amdt.2: further revisions, Sec. 74] -
SB70Dam safety project cost limits created in 2021 WisAct 58 do not apply to dam removal project -
AB136Dam safety project cost limits created in 2021 WisAct 58 do not apply to dam removal project -
SB140Dam safety projects: bonding authority increased [Sec. 550] -
AB43Dam safety projects: bonding authority increased [Sec. 550; S.Sub.Amdt.2: further revisions, appropriation created, Sec. 73, 232-234] -
SB70Deer carcass disposal within set distance of a deer farm prohibited -
AB874Deicer applicators certification program established -
AB61Deicer applicators certification program established [S.Sub.Amdt.2: further revisions, DNR changed to DATCP] -
SB52Double-fencing of farm-raised white-tailed deer: DNR grants -
AB1085Double-fencing of farm-raised white-tailed deer: DNR grants -
SB994Dry cleaner environmental response program eliminated; Revitalize Wisconsin program created re hazardous substances and environmental cleanup [Sec. 73, 350, 359, 373, 375, 376, 380, 528, 585, 599, 601-603, 1646, 2669, 2670, 9232 (1)] -
AB43Dry cleaner environmental response program eliminated; Revitalize Wisconsin program created re hazardous substances and environmental cleanup -
AB1055Dry cleaner environmental response program eliminated; Revitalize Wisconsin program created re hazardous substances and environmental cleanup [Sec. 73, 350, 359, 373, 375, 376, 380, 528, 585, 599, 601-603, 1646, 2669, 2670, 9232 (1)] [original bill only] -
SB70Dry cleaner environmental response program eliminated; Revitalize Wisconsin program created re hazardous substances and environmental cleanup -
SB1071Echo Lake dam: grant to City of Burlington for restoration [S.Sub.Amdt.2: Sec. 75] -
SB70Electronic waste cleanup in certain counties [S.Sub.Amdt.2: Sec. 72, 452] -
SB70Electronic waste recycling program changes, fee provision -
AB958Electronic waste recycling program changes, fee provision [S.Amdt.1: further revisions] -
SB866Endangered resources program: limit on appropriation to match gifts, grants, and bequests increased [Sec. 354] -
AB43Endangered resources program: limit on appropriation to match gifts, grants, and bequests increased [Sec. 354] [original bill only] -
SB70Environmental fund used for statewide education on solid waste reduction, recovery, and recycling programs allowed -
AB935Environmental fund used for statewide education on solid waste reduction, recovery, and recycling programs allowed -
SB876Fencing and signage of retention ponds required -
AB1117Forest-industry-wide strategic plan: DNR required to develop [Sec. 356, 9132 (10)] -
AB43Forest-industry-wide strategic plan: DNR required to develop [Sec. 356, 9132 (10)] [original bill only] -
SB70Great Lakes and Mississippi River erosion control revolving loan programs; DNR emergency rule-making authority [Sec. 381, 579, 580, 9132 (1), (2)] -
AB43Great Lakes and Mississippi River erosion control revolving loan programs; DNR emergency rule-making authority [Sec. 381, 579, 580, 9132 (1), (2)] [original bill only] -
SB70Great Lakes contaminated sediment removal: bonding authority increased [Sec. 549] -
AB43Great Lakes contaminated sediment removal: bonding authority increased [Sec. 549; S.Sub.Amdt.2: further revisions, appropriation created, Sec. 71] -
SB70Great Lakes erosion control revolving loan program created in DNR -
AB1190Green Tier program and the environmental compliance audit program repealed; governmental actions with regard to certain international programs and organizations restricted -
AB1059Groundwater protection standards for PFAS: exemption to requirement re suspension of work on permanent rules costing over certain amount -
AB1119Groundwater protection standards for PFAS: exemption to requirement re suspension of work on permanent rules costing over certain amount -
SB1022Habitat work plan: DNR required to prepare biennially -
AB157Habitat work plan: DNR required to prepare biennially [S.Amdt.1: report to JCF added] -
SB159Insecticide use near pollinator habitat on land maintained by DNR prohibited, limited exceptions -
AB360Insecticide use near pollinator habitat on land maintained by DNR prohibited, limited exceptions -
SB360Lake Altoona sediment dredging: DNR grant to the Lake Altoona Protection and Rehabilitation District [S.Sub.Amdt.2: Sec. 9132 (6)] -
SB70Lake Mallalieu Association: grant for dredging [S.Sub.Amdt.2: Sec. 78] -
SB70Land Recycling Loan Program eliminated [S.Amdt.1: rule repealed [Admin.Code NR 167]] -
SB13Mill Pond dam: grant to City of Plymouth for removal and restoration [S.Sub.Amdt.2: Sec. 77] -
SB70Mirror Lake Management District: grant for dredging and gully rehabilitation [S.Sub.Amdt.2: Sec. 9132 (2)] -
SB70Mississippi River erosion control revolving loan program established in DNR to assist certain municipalities and home owners -
AB828