NR 440.76(3)(h)2.2. Make the comment response document available to the public in the service area where you will construct your municipal waste combustion unit. You shall distribute the document at least to the main public libraries used to announce the public meeting.
NR 440.76(3)(h)3.3. Prepare a revised materials separation plan for the municipal waste combustion unit that includes, as appropriate, changes made in response to any public comments you received during the public comment period.
NR 440.76(3)(i)(i) What must I do with my revised materials separation plan? You shall do the following 2 tasks:
NR 440.76(3)(i)1.1. As specified under sub. (13) (a), submit the 5 items in subds. a. to e. to the department by the date you submit the application for a construction permit under ch. NR 405 or 408. If you are not required to submit an application for a construction permit under ch. NR 405 or 408, submit the 5 items to the department by the date of your notice of construction under sub. (13) (b).
NR 440.76(3)(i)1.a.a. Your draft materials separation plan.
NR 440.76(3)(i)1.b.b. Your revised materials separation plan.
NR 440.76(3)(i)1.c.c. Your notice of the public meeting for your draft materials separation plan.
NR 440.76(3)(i)1.d.d. A transcript of the public meeting on your draft materials separation plan.
NR 440.76(3)(i)1.e.e. The document that summarizes your responses to the public comments you received during the public comment period on your draft materials separation plan.
NR 440.76(3)(i)2.2. Make your revised materials separation plan available to the public as part of the siting analysis procedures under sub. (4) (e).
NR 440.76(3)(j)(j) What must I include in the public meeting on my revised materials separation plan? As part of the public meeting for review of the siting analysis, as specified under sub. (4) (g), you shall discuss the following 2 areas:
NR 440.76(3)(j)1.1. Differences between your revised materials separation plan and your draft materials separation plan discussed at the first public meeting, conducted under par. (g).
NR 440.76(3)(j)2.2. Questions about your revised materials separation plan.
NR 440.76(3)(k)(k) What must I do with any public comments I receive on my revised materials separation plan?
NR 440.76(3)(k)1.1. You shall prepare written responses to any public comments and include them in the document that summarizes your responses to public comments on the siting analysis.
NR 440.76(3)(k)2.2. You shall prepare a final materials separation plan that includes, as appropriate, changes made in response to any public comments you received on your revised materials separation plan.
NR 440.76(3)(L)(L) How do I submit my final materials separation plan? As specified under sub. (13) (b), you shall submit your final materials separation plan to the department as part of the notice of construction for the municipal waste combustion unit.
NR 440.76(4)(4)Preconstruction requirements: siting analysis.
NR 440.76(4)(a)(a) Who must submit a siting analysis?
NR 440.76(4)(a)1.1. You shall prepare a siting analysis if you commence construction of a small municipal waste combustion unit after December 6, 2000.
NR 440.76(4)(a)2.2. If you commence construction on your municipal waste combustion unit after August 30, 1999, but before December 6, 2000, you are not required to prepare the siting analysis specified in this subsection.
NR 440.76(4)(a)3.3. You shall prepare a siting analysis if you are required to submit an initial application for a construction permit, under ch. NR 405 or 408, as applicable, for the reconstruction or modification of your municipal waste combustion unit.
NR 440.76(4)(b)(b) What is a siting analysis? The siting analysis addresses how your municipal waste combustion unit affects ambient air quality, visibility, soils, vegetation and other relevant factors. The analysis can be used to determine whether the benefits of your proposed facility significantly outweigh the environmental and social costs resulting from its location and construction. The analysis shall also consider other major industrial facilities near the proposed site.
NR 440.76(4)(c)(c) What steps must I complete for my siting analysis?
NR 440.76(4)(c)1.1. For your siting analysis, you shall complete the following 5 steps:
NR 440.76(4)(c)1.a.a. Prepare an analysis.
NR 440.76(4)(c)1.b.b. Make your analysis available to the public.
NR 440.76(4)(c)1.c.c. Hold a public meeting on your analysis.
NR 440.76(4)(c)1.d.d. Prepare responses to public comments received on your analysis.