Mvret is the mass of volatile matter retained in the coated web after curing or drying, or otherwise not emitted to the atmosphere, kg. The value of this term will be zero in all cases except where you choose to take into account the volatile matter retained in the coated web or otherwise not emitted to the atmosphere for the compliance demonstration procedures in this section.
NR 466.25(15)(d)(d) For each web coating line or group of web coating lines for which you use the provisions of sub. (14) (b) 2. b. or (c) 3. b. on using a performance test to determine capture efficiency and control device efficiency, calculate the organic HAP emitted during the month using Equation 15: where:
He is the total monthly organic HAP emitted, kg
p is the number of different coating materials applied in a month
MCi is the sum of the mass of coating material, i, as-applied on intermittently-controlled work stations operating in controlled mode and the mass of coating material, i, as-applied on always-controlled work stations, in a month, kg
Cahi is the monthly average, as-applied, organic HAP content of coating material, i, expressed as a mass fraction, kg/kg
R is the overall organic HAP control efficiency, percent
MBi is the sum of the mass of coating material, i, as-applied on intermittently-controlled work stations operating in bypass mode and the mass of coating material, i, as-applied on never-controlled work stations, in a month, kg
Mvret is the mass of volatile matter retained in the coated web after curing or drying, or otherwise not emitted to the atmosphere, kg. The value of this term will be zero in all cases except where you choose to take into account the volatile matter retained in the coated web or otherwise not emitted to the atmosphere for the compliance demonstration procedures in this section.
NR 466.25(16)(16) Always-controlled work stations with more than one capture and control system. If you operate more than one capture system or more than one control device and only have always-controlled work stations, you are in compliance with the emission standards in s. NR 466.23 (1) (b) 1. for the month if for each web coating line or group of web coating lines controlled by a common control device you satisfy one of the following: NR 466.25(16)(a)(a) The volatile matter collection and recovery efficiency as determined by sub. (9) (a) 1., 3., 5. and 6. is at least 95% at an existing affected source and at least 98% at a new affected source. NR 466.25(16)(b)(b) The overall organic HAP control efficiency as determined by sub. (9) (b) 1. to 4. for each web coating line or group of web coating lines served by that control device and a common capture system is at least 95% at an existing affected source and at least 98% at a new affected source. NR 466.25(16)(c)(c) The overall organic HAP control efficiency as determined by sub. (11) (a) 1. to 3. and (b) 1. for each web coating line or group of web coating lines served by that control device and a common capture system is at least 95% at an existing affected source and at least 98% at a new affected source. NR 466.25 HistoryHistory: CR 07-045: cr. Register April 2008 No. 628, eff. 5-1-08. NR 466.26NR 466.26 Notifications, reports and records. NR 466.26(1)(1) What notifications and reports must I submit? NR 466.26(1)(a)(a) Each owner or operator of an affected source subject to this subchapter shall submit the reports specified in pars. (b) to (g) to the department. NR 466.26(1)(b)(b) You shall submit an initial notification according to the following requirements: NR 466.26(1)(b)1.1. Initial notification for existing affected sources shall be submitted no later than one year before the compliance date specified in s. NR 466.23 (3) (a). NR 466.26(1)(b)3.3. For the purpose of this subchapter, a permit application submitted under ch. NR 407 may be used in lieu of the initial notification required under s. NR 460.08 (2), provided the same information is contained in the permit application as required by s. NR 460.08 (2). NR 466.26(1)(b)4.4. If you are using a permit application in lieu of an initial notification in accordance with subd. 3., the permit application shall be submitted by the same due date specified for the initial notification. NR 466.26(1)(c)(c) You shall submit a semiannual compliance report according to subds. 1. and 2. NR 466.26(1)(c)1.a.a. The first compliance report shall cover the period beginning on the compliance date that is specified for your affected source in s. NR 466.23 (3) and ending on June 30 or December 31, whichever date is the first date following the end of the calendar half immediately following the compliance date that is specified for your affected source in s. NR 466.23 (3). NR 466.26(1)(c)1.b.b. The first compliance report shall be postmarked or delivered no later than July 31 or January 31, whichever date follows the end of the calendar half immediately following the compliance date that is specified for your affected source in s. NR 466.23 (3). NR 466.26(1)(c)1.c.c. Each subsequent compliance report shall cover the semiannual reporting period from January 1 to June 30 or the semiannual reporting period from July 1 to December 31.