58,367
Section
367. 281.59 (4) (f) of the statutes is amended to read:
281.59 (4) (f) Revenue obligations may be contracted by the building commission when it reasonably appears to the building commission that all obligations incurred under this subsection, and all payments under an agreement or ancillary arrangement entered into under s. 18.55 (6) with respect to revenue obligations issued under this subsection, can be fully paid on a timely basis from moneys received or anticipated to be received. Revenue obligations issued under this subsection for the clean water fund program and safe drinking water loan program shall not exceed $2,526,700,000 in principal amount, excluding obligations issued to refund outstanding revenue obligation notes. The building commission may contract additional revenue obligations in an amount up to $24,700,000.
58,368
Section 368
. 289.63 (6) (d) 1. (intro.) of the statutes is amended to read:
289.63 (6) (d) 1. (intro.) In this paragraph, “qualified materials recovery facility" means one of the following:
58,369
Section
369. 289.63 (6) (d) 1. c. of the statutes is created to read:
289.63 (6) (d) 1. c. A facility that is in operation on the effective date of this subd. 1. c. .... [LRB inserts date], at which solid waste is incinerated for the purpose of energy recovery, if the facility is licensed as a municipal solid waste combustor; the approved plan of operation for the facility requires the reporting of the weight of material coming into the facility, the weight of material rejected by the facility and where it was sent, and the weight of residue produced and where it was sent; and the facility is in compliance with its approved plan of operation.
58,370
Section 370
. 289.63 (6) (d) 2. a. of the statutes is amended to read:
289.63 (6) (d) 2. a. For a qualified materials recovery facility described in subd. 1. a., an amount equal to the weight of the residue generated by the qualified materials recovery facility or 10 percent of the total weight of material accepted by the qualified materials recovery facility, whichever is less.
58,371
Section
371. 289.63 (6) (d) 2. b. of the statutes is amended to read:
289.63 (6) (d) 2. b. For a qualified materials recovery facility described in subd. 1. b. or c., an amount equal to the weight of the residue generated by the qualified materials recovery facility or 30 percent of the total weight of material accepted by the qualified materials recovery facility, whichever is less. This exemption does not apply to ash residue generated by a qualified facility described in subd. 1. c.
58,372
Section
372. 289.63 (6) (d) 3. a. of the statutes is amended to read:
289.63 (6) (d) 3. a. The department may require an operator that claims the exemption under this paragraph to certify that the operator's facility satisfies the criteria in subd. 1. a. or, b., or c. and to report the weight of the residue for which the operator does not pay the groundwater and well compensation fees and any other information needed to determine eligibility for the exemption.
58,373
Section 373
. 289.64 (4) (d) 1. (intro.) of the statutes is amended to read:
289.64 (4) (d) 1. (intro.) In this paragraph, “qualified materials recovery facility" means one of the following:
58,374
Section
374. 289.64 (4) (d) 1. c. of the statutes is created to read:
289.64 (4) (d) 1. c. A facility that is in operation on the effective date of this subd. 1. c. .... [LRB inserts date], at which solid waste is incinerated for the purpose of energy recovery, if the facility is licensed as a municipal solid waste combustor; the approved plan of operation for the facility requires the reporting of the weight of material coming into the facility, the weight of material rejected by the facility and where it was sent, and the weight of residue produced and where it was sent; and the facility is in compliance with its approved plan of operation.
58,375
Section 375
. 289.64 (4) (d) 2. a. of the statutes is amended to read:
289.64 (4) (d) 2. a. For a qualified materials recovery facility described in subd. 1. a., an amount equal to the weight of the residue generated by the qualified materials recovery facility or 10 percent of the total weight of material accepted by the qualified materials recovery facility, whichever is less.
58,376
Section
376. 289.64 (4) (d) 2. b. of the statutes is amended to read:
289.64 (4) (d) 2. b. For a qualified materials recovery facility described in subd. 1. b. or c., an amount equal to the weight of the residue generated by the qualified materials recovery facility or 30 percent of the total weight of material accepted by the qualified materials recovery facility, whichever is less. This exemption does not apply to ash residue generated by a qualified facility described in subd. 1. c.
58,377
Section
377. 289.64 (4) (d) 3. a. of the statutes is amended to read:
289.64 (4) (d) 3. a. The department may require an operator that claims the exemption under this paragraph to certify that the operator's facility satisfies the criteria in subd. 1. a. or, b., or c. and to report the weight of the residue for which the operator does not pay the solid waste facility siting board fee and any other information needed to determine eligibility for the exemption.
58,378
Section 378
. 289.645 (4) (h) 1. (intro.) of the statutes is amended to read:
289.645 (4) (h) 1. (intro.) In this paragraph, “qualified materials recovery facility" means one of the following:
58,379
Section
379. 289.645 (4) (h) 1. c. of the statutes is created to read:
289.645 (4) (h) 1. c. A facility that is in operation on the effective date of this subd. 1. c. .... [LRB inserts date], at which solid waste is incinerated for the purpose of energy recovery, if the facility is licensed as a municipal solid waste combustor; the approved plan of operation for the facility requires the reporting of the weight of material coming into the facility, the weight of material rejected by the facility and where it was sent, and the weight of residue produced and where it was sent; and the facility is in compliance with its approved plan of operation.
58,380
Section 380
. 289.645 (4) (h) 2. a. of the statutes is amended to read:
289.645 (4) (h) 2. a. For a qualified materials recovery facility described in subd. 1. a., an amount equal to the weight of the residue generated by the qualified materials recovery facility or 10 percent of the total weight of material accepted by the qualified materials recovery facility, whichever is less.
58,381
Section
381. 289.645 (4) (h) 2. b. of the statutes is amended to read: