NR 410.03(2)(f)(f) $4,500, for any source, other than a minor source or minor modification to a major source, whose projected air quality impact requires a detailed air quality modeling analysis.
NR 410.03(2)(g)(g) $1,000, if the source is subject to an emission limitation under chs. NR 446 to 469, or if the permit establishes an emission limit for a hazardous air contaminant listed in Table A, B or C of s. NR 445.07.
NR 410.03(2)(h)(h) If the construction permit requires emission testing, $2,500 for the first air contaminant tested and $1,250 for each additional air contaminant tested up to a maximum of $6,000. If the department later finds that some or all of the tests are not required, the corresponding fees shall be refunded.
NR 410.03(2)(i)(i) $1,500, if an environmental analysis under ch. NR 150 is required.
NR 410.03(2)(j)(j) $1,500, if a public hearing is held at the request of the applicant or the applicant’s agent.
NR 410.03(2)(k)(k) $600 for each basic emissions unit at a source which requires an emission limit determination under s. NR 424.03 (2) (c).
NR 410.03(2)(L)(L) $2,000 for each case-by-case determination of best available control technology (BACT) or lowest achievable emission rate (LAER) required under ch. NR 445. If the department makes a single BACT or LAER determination addressing the control of multiple air contaminants, the source shall be billed for only one BACT or LAER determination under this paragraph.
NR 410.03(2)(m)(m) $3,500, if specific permit conditions limiting the potential to emit are required to make the source a minor source or to make the modification a minor modification.
NR 410.03(2)(n)(n) $3,500, for a medical waste incinerator requiring review of a needs and siting analysis under s. 285.63 (10), Stats.
NR 410.03(2)(o)(o) If the applicant requests, in writing, that the permit be issued in a shorter time interval than the time interval allowed under s. 285.61, Stats., and the department is able to comply with the request:
NR 410.03(2)(o)1.1. $5,000, for an application not subject to review under ch. NR 405 or 408 if the permit is issued within 50 days of receipt of a complete application.
NR 410.03(2)(o)2.2. $7,500, for an application reviewed under ch. NR 405 or 408 if the permit is issued within 60 days of receipt of a complete application.
NR 410.03(2)(o)3.3. $4,000, for an application reviewed under ch. NR 405 or 408 if the permit is issued within 61 to 90 days of receipt of a complete application.
NR 410.03(4)(4)Payment and refunds.
NR 410.03(4)(a)(a) When the amount due with an application or request is less than the final fee, the department shall bill the applicant for the balance due when a final decision is issued or upon a determination that no further action will be taken on the application. For a determination of no further action, the final fee shall include an amount for work completed under subs. (1) to (2), except that the final fee for a small business, as defined in s. 227.114, Stats., shall only be the initial amount due with the application or request. The balance due shall be paid within 30 days of the date of the billing statement.
NR 410.03(4)(b)(b) The department may refund all of, or a portion of, the fee submitted with an application or request for a direct source, in the following situations and amounts:
NR 410.03(4)(b)1.1. If, upon review of an individual permit application for a direct source, the department determines that the source is exempt from the need to obtain the permit, the difference between the initial application fee and the appropriate amount in sub. (1) (b).
NR 410.03(4)(b)2.2. If an applicant for an individual permit for a direct source that is a part 70 source requests that the application be processed as an application for coverage under either a general or registration construction permit, the difference between the initial fee submitted with the individual permit application and the appropriate amount in sub. (1) (am) or (as).
NR 410.03(4)(b)3.3. If the initial application fee is greater than the final fee, the difference between the application and final fees.
NR 410.03(4)(b)4.4. If an applicant for an individual permit for a direct source that is a non-part 70 source requests that the application be processed as an application for coverage under either a general or registration construction permit, the full initial fee submitted with the individual permit application.
NR 410.03 HistoryHistory: Cr. Register, April, 1984, No. 340, eff. 5-1-84; renum. from NR 410.04, Register, September, 1986, No. 369, eff. 10-1-86; r. and recr. Register, April, 1988, No. 388, eff. 5-1-88; am. (2) (g), Register, September, 1988, No. 393, eff. 10-1-88; am. (2) (l), Register, April, 1989, No. 400, eff. 5-1-89; corrections in (intro.), (1) (b) (intro.) and 1., (2) (intro.) made under s. 13.93 (2m) (b) 7., Stats., Register, April, 1989; am. (intro.), (1) (b) (intro.) and 1., renum. (1) (b) 2. to be 4., cr. (1) (b) 2. and 3., Register, October, 1991, No. 430, eff. 11-1-91; am. (intro.), (1) (b) (intro.), (d), (e) and (3), r. (1) (a) 2. and (1) (b) 4., Register, May, 1993, No. 449, eff. 6-1-93; am. (intro.), (1) (b) (intro.), r. (1) (b) 1. to 3., Register, February, 1995, No. 470, eff. 3-1-95; am. (intro.), (2) (intro.), (a) to (f), (i), r. and recr. (1) and (2) (h), r. (2) (j), renum. (2) (k) to (m) and (3) to be (2) (j), (k) and (o) and (4) and am. (2) (j), (k) and (o), cr. (2) (l) to (n) and (3), Register, June, 1995, No. 474, eff. 7-1-95; correction in (2) (k) made under s. 13.93 (2m) (b) 7., Stats., Register, December, 1995, No. 480, eff. 1-1-96; am. (1) (a) 2., Register, December, 1996, No. 492, eff. 1-1-97; am. (intro.), (1) (a), (b) and (d), (2) and (4), Register, December, 1999, No. 528, eff. 7-1-00; correction in (2) (g) made under s. 13.93 (2m) (b) 7., Stats., Register October 2003 No. 574; CR 02-097: am. (2) (g) Register June 2004 No. 582, eff. 7-1-04; CR 04-107: am. (1) (a) 5., cr. (1) (a) 6. and 7. Register August 2005 No. 596, eff. 9-1-05; CR 06-047: am. (1) (d), cr. (1) (f) Register May 2007 No. 617, eff. 6-1-07; CR 06-079: am. (intro.), cr. (1) (bm) Register May 2007 No. 617, eff. 6-1-07; CR 06-019: am. (intro.), cr. (1) (a) 8. to 10., (b) (intro.) and 2. to 4., renum. (1) (b) to be (1) (b) 1. and am., Register June 2007 No. 618, eff. 7-1-07; CR 07-040: am. (4) Register April 2008 No. 628, eff. 5-1-08; CR 10-047: am. (title), (1) (a) (intro.), 1. to 4., 8. to 10., (b), (e), (2), (4) (title), r. (intro.), (1) (d), renum. (1) (a) 5., 6., 7., (f) and (4) to be (1) (ae), (am), (as), (b) 3m., and (4) (a) and am., cr. (4) (b) Register December 2010 No. 660, eff. 1-1-11; correction in (4) (a) made under s. 13.92 (4) (b) 7., Stats., Register December 2010 No. 660; CR 13-022: am. (2) (i), (3) (a) 2. Register March 2014 No. 699, eff. 4-1-14; CR 13-070: r. (3) Register July 2014 No. 703, eff. 8-1-14.
NR 410.04NR 410.04Annual emission fee.
NR 410.04(1)(1)Fee required. Except as provided under sub. (3), any person who owns or operates a facility for which an operation permit is required under s. 285.60, Stats., shall pay an annual emission fee to the department at the rate specified in s. 285.69 (2), Stats.
NR 410.04(2)(2)Air contaminants subject to fee.
NR 410.04(2)(a)(a) Except as provided under par. (b), the annual emission fee shall be based on the annual actual emissions of the air contaminants listed in Table 1 of s. NR 438.03, as those annual actual emissions are recorded in the annual emission inventory prepared by the department under s. NR 438.03 (5).
NR 410.04(2)(b)(b) The following emissions are exempt from the emission fees required under this section:
NR 410.04(2)(b)1.1. Emissions from any acid rain phase I affected unit for the years 1995 through 1999.
NR 410.04(2)(b)2.2. Except as provided under sub. (4), emissions in excess of 5,000 tons per year of any air contaminant from any one facility.
NR 410.04(2)(b)3.3. Emissions of carbon monoxide and carbon dioxide.