NR 113.12(3)(a)2.2. A management plan in conformance with sub. (7).
NR 113.12(3)(a)3.3. If available, a copy of the construction inspection report in conformance with sub. (6). If this report is unavailable, the facility owner or operator shall provide an inspection report completed by a qualified inspector for each storage unit completed within the last 2 years.
NR 113.12(3)(b)(b) Transfer ownership of previously approved septage storage facilities. A septage only storage facility for which the department has issued written approval may continue in operation after the transfer of ownership and upon the new owner of the septage storage facility completing all of the following:
NR 113.12(3)(b)1.1. Within 15 days of ownership transfer notifying the department of the change of ownership and providing new owner’s contact information including legal entity name, address, phone number, and email address.
NR 113.12(3)(b)2.2. Within 15 days of ownership transfer providing to the department a copy of the plan and specification approval, conditional approval, or acceptance.
NR 113.12(3)(b)3.3. Within 60 days of ownership transfer, submitting to the department all of the following:
NR 113.12(3)(b)3.a.a. A spill plan in conformance with sub. (7) (a).
NR 113.12(3)(b)3.b.b. A management plan in conformance with sub. (7) (d).
NR 113.12(3)(b)3.c.c. A reevaluation inspection report in conformance with sub. (6).
NR 113.12(3)(b)3.d.d. If available, a copy of the construction inspection report under sub. (6) (a). If this report is unavailable, the facility new owner shall provide an inspection report completed by a qualified inspector for each storage unit completed within the last 2 years.
NR 113.12(3)(b)3.e.e. Department approval of a land application site submitted under s. NR 113.11 in conformity with this chapter if disposal of septage will include land application.
NR 113.12(3)(c)(c) Proposed new septage storage facilities. The owner or operator of a septage storage facility constructed after October 1, 2021, shall adhere to all of the following requirements:
NR 113.12(3)(c)1.1. A septage structure constructed after October 1, 2021, shall be designed and constructed to the requirements under ch. NR 110 unless exempted under par. (d).
NR 113.12(3)(c)2.2. The separation distances shall meet the requirements under sub. (4).
NR 113.12(3)(c)3.3. Plans and specifications shall be submitted to the department for review and approval.
NR 113.12(3)(c)4.4. Within 60 days of construction completion and prior to use, the owner or operator of the septage storage facility shall submit to the department all of the following:
NR 113.12(3)(c)4.a.a. A spill plan in conformance with sub. (7) (a).
NR 113.12(3)(c)4.b.b. A management plan in conformance with sub. (7) (d).
NR 113.12(3)(c)4.c.c. A copy of the construction inspection report in conformance with sub. (6).
NR 113.12(3)(d)(d) Exemptions from ch. NR 110 for septage storage facilities constructed after October 1, 2021. The department may issue exemptions from the design and submittal requirements of ch. NR 110 for a septage storage facility constructed after October 1, 2021, when the new septage storage facility meets all of the following:
NR 113.12(3)(d)1.1. The proposed septage storage facility added together with the septage storage facilities located on the same parcel possesses a maximum capacity of 50,000 gallons or less.
NR 113.12 NoteNote: The following provides an example. At parcel X, there are septage storage facilities A and B. The capacity of A is 20,000 gallons. The capacity of B is 20,000 gallons. After the effective date of this rule order, a new septage storage facility C is proposed. C must possess a maximum capacity of 10,000 gallons or less in order to be exempted from the design and submittal requirements of ch. NR 110.
NR 113.12(3)(d)2.2. The proposed septage storage facility includes only tanks approved under ch. SPS 384.
NR 113.12(3)(d)3.3. All storage tank installations comply with the applicable sections of the DSPS holding tank component manual that is in effect at the time of installation and ch. SPS 384.
NR 113.12(3)(d)4.4. The exemption application to the department shall include all of the following:
NR 113.12(3)(d)4.a.a. A completed application providing facts adequately describing the facility as may be required by the department.
NR 113.12(3)(d)4.b.b. A septage storage plan index and cover sheet that is properly signed, dated and properly labeled with page numbers. The index and cover sheet shall be included with the submittal by a designer of engineering systems-plumbing, designer of engineering systems-private sewage systems, master plumber, master plumber restricted service, or professional engineer.
NR 113.12(3)(d)4.c.c. A copy of the tank DSPS tank approval letter.
NR 113.12(3)(d)4.d.d. The DSPS approved tank plans and specifications.