NR 410.02 HistoryHistory: Cr. Register, April, 1984, No. 340, eff. 5-1-84; renum. from NR 410,03, Register, September, 1986, No. 369, eff. 10-1-86; renum. (1), (4) and (5) to be NR 400.02 (5e), (53e) and (53s), am. (3), r. (7), Register, April, 1988, No. 388, eff. 5-1-88; cr. (4), Register, May, 1993, No. 449, eff. 6-1-93; am. (intro.), Register, February, 1995, No. 470, eff. 3-1-95; cr. (5), r. and recr. (6), Register, June, 1995, No. 474, eff. 7-1-95; am. (4), Register, December, 1995, No. 480, eff. 1-1-96; am. (6), Register, December, 1996, No. 492, eff. 1-1-97; correction in (4) made under s. 13.93 (2m) (b) 7., Stats., Register, January, 2001, No. 541; CR 10-047: cr. (7), (8) Register December 2010 No. 660, eff. 1-1-11; CR 13-022: am. (3) Register March 2014 No. 699, eff. 4-1-14. NR 410.03NR 410.03 Application and review fees. NR 410.03(1)(a)(a) Each person submitting an application for an individual construction permit for a direct source shall pay the applicable basic fee in this paragraph and shall submit a $7,500 initial fee with the application. The initial fee shall be subtracted from the final fee required under this section and may not be refunded, except as provided in sub. (4). If the department determines that a permit is not required, the individual permit application shall be treated as an application or request under par. (b), and the appropriate fee under par. (b) shall be charged. In the event that an applicant chooses to apply for coverage under either a general or registration construction permit, the individual permit application shall be treated as an application or request under par. (am) or (as) and the appropriate fee under par. (am) or (as) shall be charged. The basic fees are as follows: NR 410.03(1)(a)1.1. $3,000 if the application is not reviewed under ch. NR 405 or 408, and the application is for a new facility or for an emissions unit to be located at a minor source. NR 410.03 NoteNote: Subdivision 4. applies to both construction of a new facility and to construction of an emissions unit which itself constitutes a major source and is to be located at an existing facility.
NR 410.03(1)(a)8.8. $12,000, per air contaminant regulated under a plant-wide applicability limitation, when establishing a plant-wide applicability limitation under s. NR 406.035 (1). NR 410.03(1)(ae)(ae) Each person requesting a revision of a construction permit shall pay a fee of $1,500 which shall be submitted with the request, unless the only reason for the revision is to make the source eligible for a registration operation permit. NR 410.03(1)(am)(am) Each person applying for coverage under a general construction permit issued for a part 70 source under s. NR 406.16 shall pay a fee of $3,000 which shall be submitted with the application for coverage. NR 410.03(1)(as)(as) Each person applying for coverage under a registration construction permit issued for a part 70 source under s. NR 406.17 shall pay a fee of $1,500 which shall be submitted with the application for coverage. NR 410.03(1)(b)(b) Each person submitting a claim of, or an application for exemption, or otherwise requesting a determination of exemption under ch. NR 406 shall pay the following applicable fee which shall be submitted with the claim, application, or request: NR 410.03(1)(b)2.2. $1,500 for a determination of exemption under s. NR 406.04 (1f) for a modification to a stationary source which is regulated by a plant-wide applicability limitation, except that if a detailed air quality modeling analysis of the projected air quality impact is completed, the fee shall be $2,400. NR 410.03(1)(b)3.3. $5,500 for a determination of exemption under s. NR 406.04 (1k), except that if a detailed air quality modeling analysis of the projected air quality impact is completed, the fee shall be $6,500. NR 410.03(1)(b)3m.3m. Any person submitting a claim for a construction permit exemption under s. NR 406.04 (1q) shall pay a fee of $1,250 which shall be submitted with the claim. NR 410.03(1)(c)(c) The basic fees in par. (a) shall be reduced by $150 if the permit applicant publishes the class 1 newspaper notice required under s. 285.61 (5) (c), Stats. NR 410.03(1)(e)(e) When a construction permit application is received for a source where the basic emissions unit, which is not a portable source, is to be installed at one specified facility and, in the same application, a request is also made to issue construction permits to allow installation of the same basic emissions unit at other facilities at different locations and all the facilities for which construction permits are requested are under common ownership or control, the permit applicant shall pay the basic fee specified in par. (a) plus the additional fees in sub. (2). The fee for each additional construction permit at different locations shall be $1,000 each, plus the fees in sub. (2) except when the action specified in sub. (2) has been completed for one location and a separate action as set forth in sub. (2) is not required for each additional permit at each different location. When an action covered under sub. (2) must be completed for applications at more than one location, the fee in sub. (2) shall be charged for each time the action is completed. NR 410.03(2)(2) Additional direct source fees. Each person submitting an application for an individual construction permit for a direct source shall pay all the following additional fees which apply: NR 410.03(2)(a)(a) $800 per basic emissions unit if review and analysis of 2 or more basic emissions units is required. NR 410.03(2)(c)(c) $5,000, if an emission offset under ch. NR 408 or the determination of a net emissions increase under ch. NR 405 is required. NR 410.03(2)(d)(d) $4,500, for each case-by-case determination of maximum achievable control technology (MACT), best available control technology (BACT) or lowest achievable emission rate (LAER). This does not apply to BACT or LAER determinations made under ch. NR 445.