NR 465.23(3)(b)(b) For any controlled coating operation or operations on which you use the emission rate with add-on controls option, except those for which you use a solvent recovery system and conduct a liquid-liquid material balance according to s. NR 465.28 (2) (g), you shall meet the operating limits specified in Table 1 of this subchapter. These operating limits apply to the emission capture and control systems on the coating operation or operations for which you use this option, and you shall establish the operating limits during the performance test according to the requirements in s. NR 465.28 (8). You shall meet the operating limits at all times after you establish them. NR 465.23(3)(c)(c) If you use an add-on control device other than those listed in Table 1 of this subchapter, or wish to monitor an alternative parameter and comply with a different operating limit, you shall apply to the U.S. environmental protection agency (EPA) administrator for approval of alternative monitoring under s. NR 460.07 (6). NR 465.23(4)(a)(a) For any coating operation on which you use the compliant material option or the emission rate without add-on controls option, you are not required to meet any work practice standards. NR 465.23(4)(b)(b) If you use the emission rate with add-on controls option, you shall develop and implement a work practice plan to minimize organic HAP emissions from the storage, mixing, and conveying of coatings, thinners, and cleaning materials used in, and waste materials generated by, the coating operation or operations for which you use this option; or you shall meet an alternative standard as provided in par. (c). The plan shall specify practices and procedures to ensure that, at a minimum, all of the following elements are implemented: NR 465.23(4)(b)1.1. All organic-HAP-containing coatings, thinners, cleaning materials and waste materials shall be stored in closed containers. NR 465.23(4)(b)2.2. Spills of organic-HAP-containing coatings, thinners, cleaning materials and waste materials shall be minimized. NR 465.23(4)(b)3.3. Organic-HAP-containing coatings, thinners, cleaning materials and waste materials shall be conveyed from one location to another in closed containers or pipes. NR 465.23(4)(b)4.4. Mixing vessels which contain organic-HAP-containing coatings and other materials shall be closed except when you are adding to, removing or mixing the contents. NR 465.23(4)(b)5.5. Emissions of organic HAP shall be minimized during cleaning of storage, mixing and conveying equipment. NR 465.23(4)(c)(c) As provided in 40 CFR 63.6 (g), the administrator may choose to grant you permission to use an alternative to the work practice standards in this subsection. NR 465.23 HistoryHistory: CR 03-037: cr. Register March 2004 No. 579, eff. 4-1-04. NR 465.24NR 465.24 General compliance requirements. NR 465.24(1)(1) What are my general requirements for complying with this subchapter?. NR 465.24(1)(a)(a) You shall be in compliance with the emission limitations in this subchapter according to both of the following requirements: NR 465.24(1)(a)1.1. Any coating operation or operations for which you use the compliant material option or the emission rate without add-on controls option, as specified in s. NR 465.23 (2) (a) and (b), shall be in compliance with the applicable emission limit in s. NR 465.23 (1) at all times. NR 465.24(1)(a)2.2. Any coating operation or operations for which you use the emission rate with add-on controls option, as specified in s. NR 465.23 (2) (c), shall be in compliance with the applicable emission limit in s. NR 465.23 (1) and the work practice standards in s. NR 465.23 (4) at all times. Each controlled coating operation shall be in compliance with the operating limits for emission capture systems and add-on control devices required by s. NR 465.23 (3) at all times, except for solvent recovery systems for which you conduct liquid-liquid material balances according to s. NR 465.28 (2) (g). NR 465.24(1)(b)(b) You shall always operate and maintain your affected source, including all air pollution control and monitoring equipment you use for purposes of complying with this subchapter, according to the provisions in s. NR 460.05 (4) (a) 1. NR 465.24(1)(c)(c) If your affected source uses an emission capture system and add-on control device, you shall maintain a log detailing the operation and maintenance of the emission capture system, add-on control device, and continuous parameter monitors during the period between the compliance date specified for your affected source in s. NR 465.21 (4) and the date when the initial emission capture system and add-on control device performance tests have been completed as specified in s. NR 465.28 (1). This requirement does not apply to a solvent recovery system for which you conduct a liquid-liquid material balance according to s. NR 465.28 (2) (g) in lieu of conducting performance tests. NR 465.24(1)(d)(d) If your affected source uses an emission capture system and add-on control device, you shall develop and implement a written startup, shutdown and malfunction plan according to the provisions in s. NR 460.05 (4) (c). The plan shall address the startup, shutdown and corrective actions in the event of a malfunction of the emission capture system or the add-on control device. The plan shall also address any coating operation equipment that may cause increased emissions or that would affect capture efficiency if the process equipment malfunctions, such as conveyors that move parts among enclosures. NR 465.24(2)(2) What parts of the general provisions apply to me?. General provisions of ch. NR 460 apply to an owner or operator of a facility subject to this subchapter as indicated in ch. NR 460 Appendix NNNN. NR 465.24 HistoryHistory: CR 03-037: cr. Register March 2004 No. 579, eff. 4-1-04. NR 465.25NR 465.25 Notifications, reports and records. NR 465.25(1)(a)1.1. You shall submit the initial notification required by s. NR 460.08 (2) for an existing affected source no later than July 23, 2003. For a new or reconstructed affected source, you shall submit the initial notification no later than 120 days after initial startup or November 20, 2002, whichever is later. NR 465.25(1)(b)(b) The notification of compliance status shall contain all of the following information, and the applicable information specified in s. NR 460.08 (8):