NR 670.014(4)(a)(a) An owner or operator shall submit all of the following information for each solid waste management unit at a facility: NR 670.014(4)(a)3.3. General dimensions and structural description (supply any available drawings). NR 670.014(4)(a)5.5. Specification of all wastes that have been managed at the unit, to the extent available. NR 670.014(4)(a)6.6. For each unit, a description of corrective action as defined in s. 291.37 (1) (a), Stats., that was previously taken or is required to be taken, including a description of the corrective action, the anticipated time period for achieving compliance and the basis for its length, and a cost estimate for completion of corrective action that is consistent with the long-term care cost estimate requirements as specified in s. NR 664.0014 (1). NR 670.014(4)(b)(b) The owner or operator of any facility containing one or more solid waste management units shall submit all available information pertaining to any release of hazardous wastes or hazardous constituents from the unit or units. NR 670.014(4)(c)(c) The owner or operator shall conduct and provide the results of sampling and analysis of groundwater, landsurface and subsurface strata, surface water or air, which may include the installation of wells, where the department ascertains it is necessary to complete a RCRA Facility Assessment that will determine if a more complete investigation is necessary. NR 670.014 HistoryHistory: CR 05-032: cr. Register July 2006 No. 607, eff. 8-1-06; correction in (3) (d) 2. made under s. 13.92 (4) (b) 7., Stats., Register March 2013 No. 687; CR 16-007: am. (1) Register July 2017 No. 739, eff. 8-1-17; CR 19-082: cr. (4) (a) 6. Register August 2020 No. 776, eff. 9-1-20; correction in (4) (a) 6. made under s. 13.92 (4) (b) 7., Stats., Register April 2021 No. 784. NR 670.015NR 670.015 Specific feasibility and plan of operation report information requirements for containers. Except as otherwise provided in s. NR 664.0170, owners or operators of facilities that store containers of hazardous waste shall provide all of the following additional information: NR 670.015(1)(1) A description of the containment system to demonstrate compliance with s. NR 664.0175. Show at least the following: NR 670.015(1)(a)(a) Basic design parameters, dimensions and materials of construction. NR 670.015(1)(b)(b) How the design promotes drainage or how containers are kept from contact with standing liquids in the containment system. NR 670.015(1)(c)(c) Capacity of the containment system relative to the number and volume of containers to be stored. NR 670.015(1)(e)(e) How accumulated liquids can be analyzed and removed to prevent overflow. NR 670.015(2)(2) For storage areas that store containers holding wastes that do not contain free liquids, a demonstration of compliance with s. NR 664.0175 (3), including all of the following: NR 670.015(2)(a)(a) Test procedures and results or other documentation or information to show that the wastes do not contain free liquids. NR 670.015(2)(b)(b) A description of how the storage area is designed or operated to drain and remove liquids or how containers are kept from contact with standing liquids. NR 670.015(3)(3) Sketches, drawings or data demonstrating compliance with s. NR 664.0176 (location of buffer zone and containers holding ignitable or reactive wastes) and s. NR 664.0177 (3) (location of incompatible wastes), where applicable. NR 670.015 HistoryHistory: CR 05-032: cr. Register July 2006 No. 607, eff. 8-1-06. NR 670.016NR 670.016 Specific feasibility and plan of operation report information requirements for tank systems. Except as otherwise provided in s. NR 664.0190, owners and operators of facilities that use tanks to store or treat hazardous waste shall provide all of the following additional information: NR 670.016(1)(1) A written assessment that is reviewed and certified by a qualified professional engineer as to the structural integrity and suitability for handling hazardous waste of each tank system, as required under ss. NR 664.0191 and 664.0192. NR 670.016(3)(3) Description of feed systems, safety cutoff, bypass systems and pressure controls (e.g., vents). NR 670.016(4)(4) A diagram of piping, instrumentation and process flow for each tank system.