NR 405.15(2)(a)(a) Make a preliminary determination whether construction should be approved, approved with conditions, or disapproved. NR 405.15(2)(b)(b) Make available in at least one location in each region in which the proposed source would be constructed a copy of all materials the applicant submitted, a copy of the preliminary determination, and a copy or summary of other materials, if any, considered in making the preliminary determination. NR 405.15(2)(c)(c) Notify the public, by advertisement in a newspaper of general circulation in each region in which the proposed source would be constructed, of the application, the preliminary determination, the degree of increment consumption that is expected from the source or modification, and of the opportunity for comment at a public hearing, as well as written public comment. NR 405.15(2)(d)(d) Send a copy of the notice of public comment to the applicant, the administrator and to officials and agencies having cognizance over the location where the proposed construction would occur as follows: any other state or local air pollution control agencies; the chief executives of the city and county where the source would be located; any comprehensive regional land use planning agency; and any state, federal land manager, or Indian governing body whose lands may be affected by emissions from the major source or major modification. NR 405.15(2)(e)(e) Provide opportunity for a public hearing for interested persons to appear and submit written or oral comments on the air quality impact of the source, alternatives to it, the control technology required, and other appropriate considerations. NR 405.15(2)(f)(f) Consider all written comments submitted within a time specified in the notice of public comment and all comments received at any public hearing in making a final decision on the approvability of the application. The department shall make all comments available for public inspection in the same locations where the department made available pre-construction information relating to the proposed major source or major modification. NR 405.15(2)(g)(g) Make a final determination whether construction should be approved, approved with conditions, or disapproved. NR 405.15(2)(h)(h) Notify the applicant in writing of the final determination and make such notification available for public inspection at the same location where the department made available pre-construction information and public comments relating to the source. NR 405.15 NoteNote: The requirement that a final permit determination be accomplished within one year of receipt of a permit application in the federal regulations has been changed to within 205 business days of receipt of application in this subsection.
NR 405.15 HistoryHistory: Cr. Register, January, 1987, No. 373, eff. 2-1-87; am. (2) (d), Register, December, 1995, No. 480, eff. 1-1-96; am. (2) (intro), Register, August, 2000, No. 536, eff. 9-1-00. NR 405.16(1)(1) Approval to construct does not relieve any owner or operator of the responsibility to comply fully with applicable provisions of the chs. NR 400 to 499 and any other requirements under local, state or federal law. NR 405.16(2)(2) At such time that a particular source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation which was established after August 7, 1980, on the capacity of the source or modification otherwise to emit an air contaminant such as a restriction on hours of operation, then the requirements of ss. NR 405.08 to 405.17 shall apply to the source or modification as though construction had not yet commenced on the major source or major modification. NR 405.16(3)(3) For a project involving existing emissions units at a major stationary source which does not have a PAL, in circumstances where the calculated difference between projected actual emissions using the method specified in s. NR 405.02 (25f) (b) 1. to 2., and baseline actual emissions does not exceed the level that is considered significant for the air contaminant, the owner or operator shall do the following as applicable: NR 405.16(3)(a)(a) Before beginning actual construction of the project, document and maintain a record of all of the following: NR 405.16(3)(a)2.2. Identification of the emissions unit or units whose emissions of a regulated NSR air contaminant could be affected by the project. NR 405.16(3)(a)3.3. The calculation of the net emissions increase under s. NR 405.02 (24) (a) that was used to determine that the project is not a major modification for any regulated NSR air contaminant, including the baseline actual emissions, the projected actual emissions, the amount of emissions excluded under s. NR 405.02 (25f) (b) 2. and an explanation why the amount was excluded, and any netting calculations, if applicable. NR 405.16(3)(b)(b) If the emissions unit is an existing electric utility steam generating unit, before beginning actual construction, provide a copy of the information in par. (a) to the department. Nothing in this paragraph shall be construed to require the owner or operator of the unit to obtain any determination from the department before beginning actual construction. NR 405.16(3)(c)(c) If the owner or operator excludes emissions from the calculation of projected actual emissions under s. NR 405.02 (25f) (b) 2. and the difference between projected actual emissions and baseline actual emissions exceeds the level that is considered to be significant for the air contaminant prior to the exclusion of emissions from the calculation of projected actual emissions under s. NR 405.02 (25f) (b) 2., before beginning actual construction, provide a copy of the information in par. (a) to the department. Nothing in this paragraph shall be construed to require the owner or operator of the unit to obtain any determination from the department before beginning actual construction. NR 405.16(3)(d)(d) Monitor the emissions of any regulated NSR air contaminant that could increase as a result of the project and that is emitted by any emissions unit identified in par. (a) 2. and calculate and maintain a record of the annual emissions, in tons per year on a calendar year basis, for a period of 5 years following resumption of regular operations after the change, or for a period of 10 years following resumption of regular operations after the change if the project increases the design capacity or potential to emit of that regulated NSR air contaminant at the emissions unit. NR 405.16(3)(e)(e) If the unit is an existing electric utility steam generating unit, submit a report to the department within 60 days after the end of each year during which records must be generated under par. (d) setting out the unit’s annual emissions during the calendar year that preceded submission of the report. NR 405.16(3)(f)(f) If the unit is an existing unit other than an electric utility steam generating unit, submit a report to the department if the annual emissions, in tons per year, from the project identified in par. (a), exceed the baseline actual emissions, as documented and maintained pursuant to par. (d) by a significant amount, as defined in s. NR 405.02 (27), for that regulated NSR air contaminant, and if the emissions differ from the preconstruction projection that was provided to the department pursuant to par. (c). The report shall be submitted to the department within 60 days after the end of the year. The report shall contain all of the following: NR 405.16(3)(f)1.1. The name, address and telephone number of the major stationary source. NR 405.16(3)(f)3.3. Any other information that the owner or operator wishes to include in the report, e.g., an explanation as to why the emissions differ from the preconstruction projection. NR 405.16(4)(4) The owner or operator of the source shall make the information required to be documented and maintained pursuant to sub. (3) available for inspection, upon request by the department or the general public. NR 405.16 HistoryHistory: Cr. Register, January, 1987, No. 373, eff. 2-1-87; CR 03-118: cr. (3) and (4), Register June 2007 No. 618, eff. 7-1-07. NR 405.17NR 405.17 Innovative control technology.