NR 440.445(7)(f)6.c.c. Control device operation log; and
NR 440.445(7)(f)6.d.d. Continuous opacity monitor or reference method data.
NR 440.445(7)(f)7.7. Test dates and test times;
NR 440.445(7)(f)8.8. Test company;
NR 440.445(7)(f)9.9. Test company representative;
NR 440.445(7)(f)10.10. Test observers from outside agency;
NR 440.445(7)(f)11.11. Description of test methodology used, including any deviation from standard reference methods;
NR 440.445(7)(f)12.12. Schematic of sampling location;
NR 440.445(7)(f)13.13. Number of sampling points;
NR 440.445(7)(f)14.14. Description of sampling equipment;
NR 440.445(7)(f)15.15. Listing of sampling equipment calibrations and procedures;
NR 440.445(7)(f)16.16. Field and laboratory data sheets;
NR 440.445(7)(f)17.17. Description of sample recovery procedures;
NR 440.445(7)(f)18.18. Sampling equipment leak check results;
NR 440.445(7)(f)19.19. Description of quality assurance procedures;
NR 440.445(7)(f)20.20. Description of analytical procedures;
NR 440.445(7)(f)21.21. Notation of sample blank corrections; and
NR 440.445(7)(f)22.22. Sample emission calculations.
NR 440.445(7)(g)(g) The owner or operator shall maintain records of all shop opacity observations in accordance with sub. (4) (d). All shop opacity observations in excess of the emission limit specified in sub. (3) (a) 3. shall indicate a period of excess emission, and shall be reported to the department semi-annually, according to s. NR 440.07 (3).
NR 440.445(7)(h)(h) The owner or operator shall maintain all the following records for each bag leak detection system required under sub. (4) (e):
NR 440.445(7)(h)1.1. Records of the bag leak detection system output.
NR 440.445(7)(h)2.2. Records of bag leak detection system adjustments, including the date and time of the adjustment, the initial bag leak detection system settings, and the final bag leak detection system settings.
NR 440.445(7)(h)3.3. An identification of the date and time of all bag leak detection system alarms, the time that procedures to determine the cause of the alarm were initiated, if procedures were initiated within one hour of the alarm, the cause of the alarm, an explanation of the actions taken, the date and time the cause of the alarm was alleviated, and if the alarm was alleviated within 3 hours of the alarm.
NR 440.445 HistoryHistory: Cr. Register, September, 1986, No. 369, eff. 10-1-86; am. (2) (intro.), (3) (b), (4) (b) and (c), r. (5) (e) and (7) (d) Register, September, 1990, No. 417, eff. 10-1-90; r. and recr. (4) (c) and (6) (a) to (c), renum. (6) (d) to be (f) (f), r. (6) (e) and (f), cr. (6) (d) to (f), am. (7) (e), Register, July, 1993, No. 451, eff. 8-1-93; CR 06-109: am. (2) (a), (e) and (g), (4) (c), (5) (b), (c), (d), (f), (g) and (h) (intro.) and 4., (6) (e) 4. and (7) (e) and (f) 6. d., cr. (2) (am), (hm) and (om), (4) (d) to (f) and (7) (g) and (h) Register May 2008 No. 629, eff. 6-1-08.
NR 440.45NR 440.45Kraft pulp mills.
NR 440.45(1)(1)Applicability and designation of affected facility.
NR 440.45(1)(a)(a) The provisions of this section are applicable to the following affected facilities in kraft pulp mills: digester system, brown stock washer system, multiple-effect evaporator system, recovery furnace, smelt dissolving tank, lime kiln and condensate stripper system. In pulp mills where kraft pulping is combined with neutral sulfite semichemical pulping, the provisions of this section are applicable when any portion of the material charged to an affected facility is produced by the kraft pulping operation.
NR 440.45(1)(b)(b) Except as noted in sub. (4) (a) 1. d., any facility under par. (a) that commences construction or modification after September 24, 1976, is subject to the requirements of this section.
NR 440.45(2)(2)Definitions. As used in this section, terms not defined in this subsection have the meanings given in s. NR 440.02.