NR 667.0090NR 667.0090 Who shall comply with this section? This subchapter applies to you if you own or operate a facility that treats or stores hazardous waste under a subch. J of ch. NR 670 standardized license, except as provided in s. NR 667.0001 (2), or unless your facility already has a license that imposes requirements for corrective action under s. NR 664.0101. NR 667.0090 HistoryHistory: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction made under s. 35.17, Stats., Register July 2017 No. 739. NR 667.0101NR 667.0101 What shall I do to address corrective action for solid waste management units? NR 667.0101(1)(1) You shall institute corrective action as necessary to protect human health and the environment for all releases of hazardous waste or constituents from any solid waste management unit at the facility, regardless of the time at which waste was placed in such unit. NR 667.0101(2)(2) The department shall specify corrective action in the supplemental portion of your standardized license in accordance with this section and subch. S of ch. NR 664. The department shall include in the supplemental portion of your standardized license schedules of compliance for corrective action (where corrective action cannot be completed prior to issuance of the license) and assurances of financial responsibility for completing corrective action. NR 667.0101(3)(3) You shall implement corrective action beyond the facility property boundary, where necessary to protect human health and the environment, unless you demonstrate to the satisfaction of the department that, despite your best efforts, you were unable to obtain the necessary permission to undertake such actions. You are not relieved of all responsibility to clean up a release that has migrated beyond the facility boundary where off-site access is denied. On-site measures to address such releases will be determined on a case-by-case basis. You shall provide assurances of financial responsibility for corrective action. NR 667.0101(4)(4) You are not required to comply with this section if you are the owner or operator of a remediation waste site unless your site is part of a facility that is subject to a license for treating, storing, or disposing of hazardous wastes that are not remediation wastes. NR 667.0101 HistoryHistory: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction in (2) made under s. 35.17, Stats., Register July 2017 No. 739. NR 667.0110NR 667.0110 Does this subchapter apply to me? This subchapter applies to you if you own or operate a facility that treats or stores hazardous waste under a subch. J of ch. NR 670 standardized license, except as provided in s. NR 667.0001 (2). NR 667.0110 HistoryHistory: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17; correction made under s. 35.17, Stats., Register July 2017 No. 739. NR 667.0111NR 667.0111 What general standards shall I meet when I stop operating the unit? NR 667.0111(2)(2) Controls, minimizes, or eliminates, to the extent necessary to protect human health and the environment, postclosure escape of hazardous waste, hazardous constituents, leachate, contaminated run-off, or hazardous waste decomposition products to the ground or surface waters or to the atmosphere. NR 667.0111(3)(3) Meets the closure requirements of this subchapter and the requirements of ss. NR 667.0176, 667.0201, and 667.1108. If you determine that, when applicable, the closure requirements of ss. NR 667.0201 (tanks), or 667.1108 (containment buildings) cannot be met, then you shall close the unit according to the requirements that apply to landfills (s. NR 664.0310). In addition, for the purposes of postclosure care and financial responsibility, the tank system or containment building is then considered to be a landfill and you shall apply for a long-term care license according to ch. NR 670. NR 667.0111 HistoryHistory: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17. NR 667.0112(1)(1) To close a facility, follow your department-approved closure plan and follow notification requirements. NR 667.0112(1)(a)(a) Submit your closure plan at the time you submit your notice of intent to operate under a standardized license. Final issuance of the standardized license constitutes approval of the closure plan and the plan becomes a condition of the standardized license. NR 667.0112(2)(2) Satisfy the requirements for content of closure plan. The closure plan shall identify steps necessary to perform partial and final closure of the facility. The closure plan shall include, at least: NR 667.0112(2)(a)(a) A description of how each hazardous waste management unit at the facility subject to this subchapter will be closed according to s. NR 667.0111. NR 667.0112(2)(b)(b) A description of how final closure of the facility will be conducted according to s. NR 667.0111. The description shall identify the maximum extent of the operations which will be unclosed during the active life of the facility. NR 667.0112(2)(c)(c) An estimate of the maximum inventory of hazardous wastes ever on site during the active life of the facility and a detailed description of the methods you shall use during partial and final closure, such as methods for removing, transporting, treating, storing, or disposing of all hazardous wastes and identification of the types of off-site hazardous waste management units to be used, if applicable. NR 667.0112(2)(d)(d) A detailed description of the steps necessary to remove or decontaminate all hazardous waste residues and contaminated containment system components, equipment, structures, and soils during partial or final closure. These steps may include procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standards. NR 667.0112(2)(e)(e) A detailed description of other activities necessary during the closure period to ensure that partial or final closure satisfies the closure performance standards. NR 667.0112(2)(f)(f) A schedule for closure of each hazardous waste management unit and for final closure of the facility. The schedule shall include, at a minimum, the total time required to close each hazardous waste management unit and the time required for intervening closure activities that allow tracking of progress of partial or final closure. NR 667.0112(2)(g)(g) For facilities that use trust funds to establish financial assurance under s. NR 667.0143 and that are expected to close prior to the expiration of the license, an estimate of the expected year of final closure.