NR 132.116(1)(a)(a) Upon notification that a mining permit has been issued by the department but prior to commencing mining, the operator shall file with the department a bond conditioned on faithful performance of all of the requirements of this chapter and ch. 293, Stats. In lieu of a bond, the operator may deposit cash, certificates of deposit, or government securities with the department. Interest received on certificates of deposit and government securities shall be paid to the operator. The amount of the bond or other security required shall be equal to the estimated cost to the state of fulfilling the reclamation plan, in relation to that portion of the site that will be disturbed by the end of the following year. The department shall determine the estimated cost of reclamation of each mining site on the basis of relevant factors including expected changes in the price index, topography of the site, methods being employed, depth and composition of overburden, and depth of nonferrous metallic mineral deposit being mined. NR 132.116(1)(b)(b) The department, as provided under s. 293.53 (1) (a), Stats., may increase the amount of the bond, cash, certificates of deposit, or government security filed under par. (a), to assure adequate financing for the reclamation plan. NR 132.116(1)(c)(c) A bond filed under par. (a) shall be issued by a surety company licensed to do business in Wisconsin. If the surety company’s license to do business is revoked or suspended, the operator, within 30 days after receiving written notice thereof from the department, shall substitute surety underwritten by a surety company licensed to do business in Wisconsin. Upon failure of the operator to make a substitution, the department shall suspend the operator’s mining permit until an acceptable substitute surety has been submitted. NR 132.116(1)(d)(d) A bond filed under par. (a) shall provide that the bond shall not be canceled by the surety, except after not less than 90 days’ notice to the department in writing by registered or certified mail. Not less than 30 days prior to the expiration of the 90-day notice of cancellation, the operator shall deliver to the department a replacement bond in the absence of which all mining shall cease. NR 132.116(2)(2) Upon notification that a mining permit has been issued by the department but prior to commencing mining, the operator shall file with the department a bond issued by a surety company licensed to do business in this state, cash, certificates of deposit, or government security, to cover unforeseen remedial contingencies not otherwise covered by the bonds or other security required under sub. (1) or (5), including for the provision of a replacement water supply if required under s. 293.65 (4) (d), Stats. The amount of the bond or other security required shall be 10 percent of the total amount of the bonds or other security required under subs. (1) and (5). The operator shall increase, and may decrease, the amount of the bond or other security under this subsection according to any increase or decrease in the amount of the bonds or other security required under sub. (1) or (5) until the operator ceases to extract material from the mining site, at which point the amount of the bond or other security under this subsection shall remain the same until released by the department. The bond or other security under this subsection shall be released no later than 40 years after the operator ceases to extract material from the mining site. NR 132.116(3)(3) The applicant shall submit a certificate of insurance certifying that the applicant has in force a liability insurance policy issued by an insurer authorized to do business in this state, or in lieu of a certificate of insurance evidence that the applicant has satisfied state or federal self-insurance requirements, covering all mining operations of the applicant in this state and affording personal injury and property damage protection in a total amount deemed adequate by the department but not less than $50,000. NR 132.116(4)(4) Upon approval of the financial instruments related to cost of reclamation under sub. (1) and unforeseen remedial contingency costs under sub. (2), and the certificate of insurance under sub. (3), the department shall issue written authorization to commence mining at the permitted mining site in accordance with the mining permit and approved mining and reclamation plans. NR 132.116(5)(5) If the department approves a mining waste site as part of a permitted mining project, the owner shall maintain proof of financial responsibility ensuring the availability of funds for compliance with the long-term care requirements specified in the waste site feasibility study and plan of operation in accordance with ss. 293.51 (1g) and 289.41, Stats., and ch. NR 182. Proof of financial responsibility for long term care shall be submitted prior to operation of the mining waste facility. NR 132.116(6)(6) The operator shall provide and maintain proof of financial responsibility as required under s. 293.51 (1r), Stats., related to replacement of engineered cover systems or water management control systems used at the mining site or mining waste site to avoid adverse environmental consequences following closure of the mining waste site. The department shall determine the amount of the security required under this subsection as provided in s. 293.51 (1r), Stats., and shall specify the amount as part of the mining permit and reclamation plan approval. An operator shall submit proof of financial responsibility under this subsection at the time of closure of the mining waste site and in accordance with provisions of ch. NR 182. NR 132.116 HistoryHistory: CR 20-043: cr. Register December 2021 No. 792, eff. 1-1-22; correction in (5) made under s. 35.17, Stats., Register December 2021 No. 792. NR 132.117(1)(1) An operator shall monitor the mining site and adjacent areas in accordance with the monitoring plan approved as part of the mining permit. The department may require the operator to perform additional monitoring of environmental changes during the course of the permitted activity and for such additional periods of time as is necessary to satisfactorily complete reclamation of the mining site and long-term care of the mining waste facility. NR 132.117(2)(2) The department may monitor environmental changes concurrently with the operator as stated in sub. (1) and for an additional period after the full reclamation bond is released under s. 293.63, Stats. NR 132.117(3)(a)(a) The department shall review baseline data, monitoring data, and the monitoring plan at the time of annual permit review or at such time as the operator requests any modification of the mining permit, mining plan, reclamation plan, or monitoring plan. NR 132.117(3)(b)(b) The department shall consider baseline data and monitoring data in all enforcement actions including issuance of a stop order to an operator, requiring an immediate cessation of mining, in whole or in part, at any time that the department determines that there exists an immediate and substantial threat to public health and safety or the environment. NR 132.117(3)(c)(c) If the analyses of samples indicate the quality of the groundwater is statistically significantly different from either baseline or background, the operator shall notify the department immediately and implement applicable provisions of the contingency plan submitted under s. NR 182.109 (2) (d). NR 132.117(4)(4) Any request for modification of the scope of the monitoring plan approved as part of the mining permit, including sampling parameters, monitoring locations and frequency and duration of sampling, shall comply with the procedures in s. NR 132.120. Changes in monitoring equipment and sampling and analytical protocols may be reviewed and approved by the department and are not subject to the modification procedural requirements of s. NR 132.120. NR 132.117(5)(5) An operator shall ensure that all laboratory chemical analyses required under the monitoring plan are conducted by a laboratory certified under s. 299.11, Stats., and ch. NR 149 or other certification program applicable to specific test categories. NR 132.117 HistoryHistory: CR 20-043: cr. Register December 2021 No. 792, eff. 1-1-22. NR 132.118(1)(1) Subject to applicable state and federal safety rules or regulations, any authorized officer, employee, or representative of the department may enter and inspect any property, premises or place on or at which any mining operation or facility is located or is being constructed or installed at any reasonable time for the purpose of ascertaining the state of compliance with this chapter and chs. 30, 281, 283, 285, 289 to 292, and 299, Stats., and rules adopted under those chapters. NR 132.118(2)(2) No operator may refuse entry or access to any authorized representative of the department who requests entry for purposes of inspection, and who presents appropriate credentials, nor may any person obstruct, hamper, or interfere with any such inspection. NR 132.118(3)(3) The department shall furnish to the operator a written report on any inspection setting forth all observations, relevant information, and data that relate to compliance status. NR 132.118 HistoryHistory: CR 20-043: cr. Register December 2021 No. 792, eff. 1-1-22. NR 132.119NR 132.119 Reporting and mining permit review. NR 132.119(1)(1) Reclamation reporting. An operator shall submit all the following reports to the department documenting plans, progress, and evaluation of reclamation activities at the mining site. For each report, the operator shall provide the department with a quantity of paper copies specified by the department and shall provide a complete electronic version in a format specified by the department: NR 132.119(1)(a)(a) In January of each year, a report detailing planned reclamation activities the operator intends to complete in that calendar year. The plan shall document the extent of new surface disturbance, areas of the mining site that will be temporarily and permanently reclaimed during the year, site preparation activities, reclamation materials, including seed mixes, bare root stock and other materials, mining site maintenance activities, ongoing reclamation monitoring and test plot evaluation, and any other information specified by the department in the mining permit and reclamation plan approval.