NR 666.102(5)(d)2.a.a. Maximum emission rate for each metal specified as the average emission rate during the trial burn.
NR 666.102(5)(d)2.b.b. Feed rate of total hazardous waste and pumpable hazardous waste, each measured and specified as prescribed in par. (f) 1.
NR 666.102(5)(d)2.c.c. Feed rate of each metal in the following feedstreams, measured and specified as prescribed in par. (f):
1) Total feedstreams.
2) Total hazardous waste feed.
3) Total pumpable hazardous waste feed.
NR 666.102(5)(d)2.d.d. Total feed rate of chlorine and chloride in total feedstreams measured and specified as prescribed in par. (f).
NR 666.102(5)(d)2.e.e. Maximum combustion gas temperature measured at a location indicative of combustion chamber temperature, and measured and specified as prescribed in par. (f).
NR 666.102(5)(d)2.f.f. Maximum flue gas temperature at the inlet to the particulate matter air pollution control system measured and specified as prescribed in par. (f).
NR 666.102(5)(d)2.g.g. Maximum device production rate when producing normal product expressed in appropriate units and measured and specified as prescribed in par. (f).
NR 666.102(5)(d)2.h.h. Appropriate controls on operation and maintenance of the hazardous waste firing system and any air pollution control system.
NR 666.102(5)(d)2.i.i. Allowable variation in boiler and industrial furnace system design including any air pollution control system or operating procedures.
NR 666.102(5)(d)2.j.j. Such other operating requirements as are necessary to ensure that the metals standards under s. NR 666.106 (3) or (4) are met.
NR 666.102(5)(d)3.3. For conformance with an alternative implementation approach approved by the department under s. NR 666.106 (6), the license shall specify all of the following operating requirements:
NR 666.102(5)(d)3.a.a. Maximum emission rate for each metal specified as the average emission rate during the trial burn.
NR 666.102(5)(d)3.b.b. Feed rate of total hazardous waste and pumpable hazardous waste, each measured and specified as prescribed in par. (f) 1.
NR 666.102(5)(d)3.c.c. Feed rate of each metal in the following feedstreams, measured and specified as prescribed in par. (f):
1) Total hazardous waste feed.
2) Total pumpable hazardous waste feed.
NR 666.102(5)(d)3.d.d. Total feed rate of chlorine and chloride in total feedstreams measured and specified prescribed in par. (f).
NR 666.102(5)(d)3.e.e. Maximum combustion gas temperature measured at a location indicative of combustion chamber temperature, and measured and specified as prescribed in par. (f).
NR 666.102(5)(d)3.f.f. Maximum flue gas temperature at the inlet to the particulate matter air pollution control system measured and specified as prescribed in par. (f).
NR 666.102(5)(d)3.g.g. Maximum device production rate when producing normal product expressed in appropriate units and measured and specified as prescribed in par. (f).
NR 666.102(5)(d)3.h.h. Appropriate controls on operation and maintenance of the hazardous waste firing system and any air pollution control system.
NR 666.102(5)(d)3.i.i. Allowable variation in boiler and industrial furnace system design including any air pollution control system or operating procedures.
NR 666.102(5)(d)3.j.j. Such other operating requirements as are necessary to ensure that the metals standards under s. NR 666.106 (3) or (4) are met.
NR 666.102(5)(e)(e) Requirements to ensure conformance with the hydrogen chloride and chlorine gas standards.
NR 666.102(5)(e)1.1. For conformance with the Tier I total chloride and chlorine feed rate screening limits of s. NR 666.107 (2) (a), the license shall specify all of the following operating requirements:
NR 666.102(5)(e)1.a.a. Feed rate of total chloride and chlorine in hazardous waste, other fuels, and industrial furnace feedstocks measured and specified as prescribed in par. (f).