283.15(10)(c)(c) This section does not apply to the issuance, reissuance or modification of a permit to incorporate a toxic effluent standard or prohibition promulgated by rule under s. 283.11 (4) or 283.21.
283.15(11)(11)Water quality standards review. As part of the review of water quality standards under s. 281.15 (6), as required by 33 USC 1313 (c) (1), the department shall review the variances to water quality standards approved under s. 283.15 or 283.16. The department shall receive information regarding these variances at the public hearing held under s. 281.15 (6). If the department determines that a water quality standard to which a variance applies is attainable, the department shall modify the standard or variance accordingly at the time the permit containing the variance is reissued, modified, or revoked and reissued.
283.15(12)(12)Federal requirements. Notwithstanding any of the provisions of this section, the department shall comply with the provisions of 40 CFR 131.14 when approving and implementing a variance under this section.
283.15 HistoryHistory: 1973 c. 74; 1979 c. 221 s. 2202 (39); 1985 a. 29; 1987 a. 27, 60; 1995 a. 227 s. 861; Stats. 1995 s. 283.15; 2011 a. 32; 2015 a. 205; 2017 a. 21.
283.15 Cross-referenceCross-reference: See also ch. NR 212 and s. NR 200.01, Wis. adm. code.
283.16283.16Statewide variance for phosphorus.
283.16(1)(1)Definitions. In this section:
283.16(1)(a)(a) “Basin” means the drainage area identified by an 8-digit hydrologic unit code, as determined by the U.S. Geological Survey.
283.16(1)(b)(b) “Category” means a class or category of point sources specified by the department under s. 283.13 (1) or publicly owned treatment works.
283.16(1)(d)(d) “Existing source” means a point source that was covered by a permit on December 1, 2010.
283.16(1)(e)(e) “Major facility upgrade” means the addition of new treatment equipment and a new treatment process.
283.16(1)(g)(g) “Nonpoint source” has the meaning given in s. 281.16 (1) (e).
283.16(1)(h)(h) “Target value” means the following:
283.16(1)(h)1.1. For a point source in a watershed for which a federally approved total maximum daily load under 33 USC 1313 (d) (1) (C) is in effect on April 25, 2014, the number of pounds of phosphorus that would be discharged from the point source during a year if the point source complied with its effluent limitation based on the total maximum daily load in effect on April 25, 2014.
283.16(1)(h)2.2. For a point source in a watershed for which no federally approved total maximum daily load under 33 USC 1313 (d) (1) (C) is in effect on April 25, 2014, the number of pounds of phosphorus that would be discharged from the point source during a year if the average concentration of phosphorus in the effluent discharged by the point source during the year was 0.2 milligrams per liter.
283.16(1)(i)(i) “Water quality based effluent limitation” means an effluent limitation under s. 283.13 (5), including an effluent limitation based on a total maximum daily load under 33 USC 1313 (d) (1) (C) approved by the federal environmental protection agency.
283.16(2)(2)Initial determination concerning the water quality standard for phosphorus.
283.16(2)(a)(a) The department of administration, in consultation with the department of natural resources, shall determine whether attaining the water quality standard for phosphorus, adopted under s. 281.15, through compliance with water quality based effluent limitations by point sources that cannot achieve compliance without major facility upgrades is not feasible because it would cause substantial and widespread adverse social and economic impacts on a statewide basis. The department of administration may make separate determinations under this paragraph for statewide categories of point sources.
283.16(2)(b)(b) The department of administration shall include all of the following in its determination under par. (a), based on water quality based effluent limitations for phosphorus determined by the department of natural resources:
283.16(2)(b)1.1. A calculation of the statewide cost of compliance with water quality based effluent limitations for phosphorus by point sources that cannot achieve compliance without major facility upgrades.
283.16(2)(b)2.2. A calculation of the statewide per household cost for water pollution control by publicly owned treatment works that cannot achieve compliance with water quality based effluent limitations for phosphorus without major facility upgrades, including the projected costs of compliance with those water quality based effluent limitations, and a calculation of the percentage of median household income the per household cost represents.
283.16(2)(b)4.4. A determination of whether the cost of compliance with water quality based effluent limitations for phosphorus by point sources that cannot achieve compliance without major facility upgrades would cause substantial adverse social and economic impacts on a statewide basis.
283.16(2)(b)5.5. A determination of whether the cost of compliance with water quality based effluent limitations for phosphorus by point sources that cannot achieve compliance without major facility upgrades would cause widespread adverse social and economic impacts on a statewide basis.
283.16(2)(c)(c) The department of administration shall make a preliminary determination under par. (a) no later than the 240th day after April 25, 2014. The department of administration shall provide public notice, through an electronic notification system that it establishes or selects, of its preliminary determination and shall provide the opportunity for public comment on the preliminary determination for at least 30 days following the public notice.
283.16(2)(d)(d) The department of administration shall consider any public comments in making its final determination under par. (a) and shall make the final determination no later than the 30th day after the end of the public comment period.
283.16(2)(e)(e) The department of administration shall send a notice that describes its final determination under par. (a) to the legislative reference bureau for publication in the administrative register.
283.16(2)(em)(em) If the department of administration determines under par. (a) that attaining the water quality standard for phosphorus through compliance with water quality based effluent limitations by point sources that cannot achieve compliance without major facility upgrades is not feasible, the department of natural resources shall seek approval under 40 CFR Part 131 from the federal environmental protection agency for the variance under this section.
283.16(2)(f)(f) If the department of administration determines under par. (a) that attaining the water quality standard for phosphorus through compliance with water quality based effluent limitations by point sources that cannot achieve compliance without major facility upgrades is not feasible, the determination remains in effect until the department of administration finds under sub. (3) (c) that the determination is no longer accurate.
283.16(2m)(2m)Water quality standards review. As part of the review of water quality standards under s. 281.15 (6), as required by 33 USC 1313 (c) (1), if the variance under this section is in effect, the department shall determine whether formal review under sub. (3) should be undertaken, considering any comments it receives on the variance.