ATCP 50.925(5)(b)(b) The following that apply are completed and submitted to the department: ATCP 50.925(5)(b)2.2. Geophysical data map, if applicable, with legend, unit and ground truthing locations. ATCP 50.925(5)(b)5.5. A computer file with tabulated data in spreadsheet format that identifies latitude/longitude coordinates as recorded during the field effort. ATCP 50.925(5)(b)6.6. Field maps depicting intrusive method data points and depth to bedrock, including information below: ATCP 50.925(5)(b)6.a.a. Borings or geophysical survey locations, or both, by recording latitude/longitude coordinates of verification borings and geophysical survey locations using the WGS84 coordinate system. ATCP 50.925(5)(b)6.b.b. Field location, field boundary, acres, field identification number, scale, all borings and geophysical survey locations, or both using the above requirements and a North directional arrow. ATCP 50.925 HistoryHistory: CR 23-024: cr. Register May 2024 No. 821, eff. 6-1-24; correction in (3) (f) made under s. 35.17, Stats., and cr. sub. (4) (title) under s. 13.92 (4) (b) 2., Stats., Register May 2024 No. 821. ATCP 50.93(1)(1) Definition. In this section, “waste transfer system” means components such as pumps, pipes, conduits, valves, and other structures installed to convey manure, feed storage, and milking center wastes from buildings and animal feeding operations to a storage structure, loading area, or treatment area. ATCP 50.93(2)(2) Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse the cost of designing and constructing a waste transfer system which is a necessary component of a manure storage system, barnyard runoff control system, or milking center waste system funded under this chapter, provided that the waste transfer system is designed and used for that sole purpose. ATCP 50.93(3)(3) Ineligible costs. A cost-share grant under s. ATCP 50.40 may not reimburse the costs for any of the following: ATCP 50.93(3)(a)(a) Portable equipment for spreading wastes on land or for incorporating wastes into land. ATCP 50.93(3)(b)(b) Buildings or modifications to buildings. This paragraph does not apply to building modifications that are essential for the installation of a milking center waste control system. ATCP 50.93(4)(4) Design, construction, and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse the cost of installing a waste transfer system unless all of the following conditions are met: ATCP 50.93(4)(a)(a) The waste transfer system complies with conservation practice standard 634 waste transfer (November, 2022). ATCP 50.93(4)(b)(b) The landowner agrees to maintain the waste transfer system for 10 years unless farming operations on the affected land are discontinued. ATCP 50.93 HistoryHistory: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (4) (a) 1. Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (4) (a) 1., 2. Register February 2014 No. 698, eff. 5-1-14; CR 14-047: am. (4) (a) 1., 2. Register May 2015 No. 713, eff. 6-1-15; CR 23-024: am. (1), consol. (4) (a) (intro.) and 1. and renum. (4) (a) and am., r. (4) (a) 2. Register May 2024 No. 821, eff. 6-1-24. ATCP 50.94(1)(1) Definition. In this section, “wastewater treatment strip” means an area of herbaceous vegetation that is used as part of an agricultural waste management system to remove pollutants from animal lot runoff or wastewater, such as runoff or wastewater from a milking center or feed storage area. ATCP 50.94(2)(2) Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse the following wastewater treatment strip costs: ATCP 50.94(2)(a)(a) Permanent fencing to protect the wastewater treatment strip. ATCP 50.94(2)(b)(b) Costs to establish permanent vegetative cover in the wastewater treatment strip, or to provide temporary cover until permanent cover is established. This may include costs for mulch, fertilizer, and other necessary materials. ATCP 50.94(2)(c)(c) Costs to shape, smooth, or prepare the wastewater treatment strip before establishing a permanent vegetative cover. ATCP 50.94(3)(3) Design, construction, and maintenance standards. A cost-share grant under s. ATCP 50.40 may not reimburse wastewater maintenance strip costs unless all the following conditions are met: ATCP 50.94(3)(a)(a) The wastewater treatment strip complies with all the following that apply: