NR 465.43(4)(b)3.3. Organic-HAP-containing coatings, thinners, other additives, cleaning materials and waste materials shall be conveyed from one location to another in closed containers or pipes. NR 465.43(4)(b)4.4. Mixing vessels which contain organic-HAP-containing coatings and other materials shall be closed except when adding to, removing or mixing the contents. NR 465.43(4)(b)5.5. Emissions of organic HAP shall be minimized during cleaning of storage, mixing and conveying equipment. NR 465.43(4)(c)(c) As provided in 40 CFR 63.6(g), the U. S. EPA may choose to grant you permission to use an alternative to the work practice standards in this subsection. NR 465.43 HistoryHistory: CR 05-040: cr. Register February 2006 No. 602, eff. 3-1-06. NR 465.44NR 465.44 General compliance requirements. NR 465.44(1)(1) What are my general requirements for complying with this subchapter? NR 465.44(1)(a)(a) You shall be in compliance with the emission limits in this subchapter as specified in subds. 1. and 2. NR 465.44(1)(a)1.1. Any coating operation or operations for which you use the compliant material option or the emission rate without add-on controls option shall be, as specified in s. NR 465.43 (2) (a) and (b), in compliance with the applicable emission limit in s. NR 465.43 (1) at all times. NR 465.44(1)(a)2.2. Any coating operation or operations for which you use the emission rate with add-on controls option shall be, as specified in s. NR 465.43 (2) (c), in compliance with the emission limits as specified in subd. 2. a. to c. NR 465.44(1)(a)2.a.a. The coating operation or operations shall be in compliance with the applicable emission limit in s. NR 465.43 (1) at all times except during periods of startup, shutdown and malfunction. NR 465.44(1)(a)2.b.b. The coating operation or operations shall be in compliance with the operating limits for emission capture systems and add-on control devices required by s. NR 465.43 (3) at all times except during periods of startup, shutdown and malfunction, and except for solvent recovery systems for which you conduct liquid-liquid material balances according to s. NR 465.48 (2) (j). NR 465.44(1)(b)(b) You shall always operate and maintain your affected source, including all air pollution control and monitoring equipment you use for purposes of complying with this subchapter, according to the provisions in s. NR 460.05 (4) (a) 1. NR 465.44(1)(c)(c) If your affected source uses an emission capture system and add-on control device, you shall develop and implement a written startup, shutdown and malfunction plan according to the provisions in s. NR 460.05 (4) (c). The plan shall address the startup, shutdown and corrective actions in the event of a malfunction of the emission capture system or the add-on control device. The plan shall also address any coating operation equipment that may cause increased emissions or that would affect capture efficiency if the process equipment malfunctions, such as conveyors that move parts among enclosures. NR 465.44(2)(2) What parts of the general provisions apply to me? You shall comply with the applicable general provisions requirements in ch. NR 460. Appendix MMMM in ch. NR 460 shows which parts of the general provisions in ch. NR 460 apply to you. NR 465.44 HistoryHistory: CR 05-040: cr. Register February 2006 No. 602, eff. 3-1-06. NR 465.45NR 465.45 Notifications, reports and records. NR 465.45(1)(b)(b) Initial notification. You shall submit the initial notification required by s. NR 460.08 (2) for a new or reconstructed affected source no later than 120 days after initial startup. For an existing affected source, you shall submit the initial notification no later than one year after January 2, 2004. If you are using compliance with the surface coating of automobiles and light-duty trucks NESHAP in 40 CFR part 63, Subpart IIII, as provided for under s. NR 465.41 (2) (d) to constitute compliance with this subchapter for any or all of your metal parts coating operations, then you shall include a statement to this effect in your initial notification, and no other notifications are required under this subchapter in regard to those metal parts coating operations. If you are complying with another NESHAP that constitutes the predominant activity at your facility under s. NR 465.41 (2) (e) 2. to constitute compliance with this subchapter for your metal parts coating operations, then you shall include a statement to this effect in your initial notification, and no other notifications are required under this subchapter in regard to those metal parts coating operations. NR 465.45(1)(c)(c) Notification of compliance status. You shall submit the notification of compliance status required by s. NR 460.08 (8) no later than 30 calendar days following the end of the initial compliance period described in s. NR 465.46 (1), 465.47 (1) or 465.48 (1) that applies to your affected source. The notification of compliance status shall contain the information specified in subds. 1. to 11. and in s. NR 460.08 (8). NR 465.45(1)(c)2.2. Statement by a responsible official with that official’s name, title and signature, certifying the truth, accuracy and completeness of the content of the report. NR 465.45(1)(c)4.4. Identification of the compliance option or options specified in s. NR 465.43 (2) that you used on each coating operation in the affected source during the initial compliance period. NR 465.45(1)(c)5.5. Statement of whether or not the affected source achieved the emission limits in s. NR 465.43 (1) for the initial compliance period.