NR 722.13(2)(2) Contents of report. The remedial action options report shall include the following: NR 722.13(2)(a)2.2. The purpose of the submittal and the desired department action or response. NR 722.13(2)(b)(b) Executive summary. A brief narrative summarizing the contents of the report. NR 722.13(2)(c)1.1. Project title, name of the site or facility, its location, the mailing address and telephone number of the responsible parties, and the name, address and telephone number of the person who prepared the report. NR 722.13(2)(c)3.3. A summary of the nature and extent of contamination at the site or facility, based on the data gathered during the site investigation. NR 722.13(2)(c)4.4. A summary of the geologic and hydrogeologic characteristics at the site or facility, based on data gathered during the site investigation. NR 722.13 NoteNote: If a site investigation report required under ch. NR 716 and a remedial action options report required under this chapter are prepared as a single submittal, the site investigation information does not need to be restated in the remedial action options portion of the combined submittal. NR 722.13(2)(d)(d) Remedial action options. A brief description of each remedial action option that has been evaluated under s. NR 722.07, including all of the following information: NR 722.13(2)(d)1.1. A physical and operational description of each remedial action option. NR 722.13(2)(d)2.2. The degree to which each evaluated remedial action option is expected to comply with the environmental laws and standards under s. NR 722.09 (2). NR 722.13(2)(d)3.3. The physical location at the site or facility where the environmental standards applicable to the site or facility and the remedial action option are to be complied with. NR 722.13(2)(d)4.4. Any local, state or federal licenses, permits or approvals that are required for each remedial action option. NR 722.13(2)(d)5.5. A comparison of the expected performance of each remedial action option in relation to the technical and economic feasibility criteria in s. NR 722.07 (4). NR 722.13(2)(d)6.6. A statement on whether or not treatment was considered and why a treatment option or combination of treatment options were rejected, if rejected. NR 722.13(2)(e)(e) Selected remedial action. Responsible parties shall document the selected remedial action in compliance with this section, except where the department is selecting the remedial action option under s. NR 722.05 (2). The remedial action options report shall identify the selected remedial action and shall include: NR 722.13(2)(e)1.1. A brief summary of the rationale for choosing the remedial action, based on the evaluation required under s. NR 722.07. NR 722.13(2)(e)2.2. A proposed schedule for implementing the selected remedial action option. NR 722.13(2)(e)4.4. An estimate of the time frame needed for the selected remedial action option to comply with the applicable federal or state environmental laws and standards, whichever are more stringent. NR 722.13(2)(e)5.5. A description of how the performance of the selected remedial action option will be measured. NR 722.13(2)(e)6.6. A description of how treatment residuals generated in connection with the selected remedial action option will be managed on-site and, if applicable, off-site. NR 722.13 HistoryHistory: Cr. Register, April, 1995, No. 472, eff. 5-1-95; am. (1), Register, January, 2001, No. 541, eff. 2-1-01; CR 12-023: am. (1), (2) (e) 1., 3., cr. (2) (e) 7. Register October 2013 No. 694, eff. 11-1-13.