ATCP 50.84(5)(f)(f) The landowner agrees to maintain the roof for 10 years unless farming operations on the affected land are discontinued.
ATCP 50.84 HistoryHistory: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: r. and recr. (5) (a) Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (5) (a) Register February 2014 No. 698, eff. 5-1-14; CR 16-083: am. (5) (a) Register January 2018 No. 745, eff. 2-1-18; CR 23-024: renum. (1) (a) to (am) and am., cr. (1) (a), r. (1) (b), consol. (4) (intro.) and (c) and am., r. (4) (a), (b), am. (5) (a), (e) Register May 2024 No. 821, eff. 6-1-24.
ATCP 50.85ATCP 50.85Roof runoff systems.
ATCP 50.85(1)(1)Definition. In this section, “roof runoff system” means facilities for collecting, controlling, diverting, and disposing of precipitation from roofs. A “roof runoff system” may include gutters, downspouts, erosion-resistant channels, subsurface drains, and trenches.
ATCP 50.85(2)(2)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse the cost of designing and constructing a roof runoff system as part of a barnyard runoff control system or manure storage system if the roof runoff system is necessary to prevent roof runoff from flowing across areas of concentrated manure.
ATCP 50.85(3)(3)Ineligible costs. A cost-share grant under s. ATCP 50.40 may not reimburse costs for structures that divert water to areas not adequately protected from erosion.
ATCP 50.85(4)(4)Design, construction, and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse the cost of installing a roof runoff system unless all of the following conditions are met:
ATCP 50.85(4)(a)(a) The roof runoff system complies with all of the following that apply:
ATCP 50.85(4)(a)1.1. NRCS conservation practice standard 558 roof runoff structure (September, 2021).
ATCP 50.85(4)(a)2.2. NRCS conservation practice standard 620 underground outlet (June, 2021).
ATCP 50.85(4)(b)(b) The landowner agrees to maintain the roof runoff system for 10 years unless farming operations on the affected land are discontinued.
ATCP 50.85 HistoryHistory: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (4) (a) 1. Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (4) (a) 1., 2. Register February 2014 No. 698, eff. 5-1-14; CR 14-047: am. (4) (a) 2. Register May 2015 No. 713, eff. 6-1-15; CR 23-024: am. (4) (a) 1., 2., Register May 2024 No. 821, eff. 6-1-24.
ATCP 50.86ATCP 50.86Sediment basins.
ATCP 50.86(1)(1)Definition. In this section:
ATCP 50.86(1)(a)(a) “Sediment basins” means permanent basins that reduce the transport of waterborne pollutants such as eroded soil sediment, debris, and manure sediment. Sediment basins may include containment walls or berms, pickets or screens to filter debris, orifices or weirs to control discharge, and conduits to direct runoff to treatment or discharge areas.
ATCP 50.86(1)(b)(b) “Maximum storage capacity” means the volume of water, in acre-feet, capable of being stored behind a dam at maximum water elevation without overtopping any part that is not part of the spillway system.
ATCP 50.86(2)(2)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse the cost of designing and constructing a sediment basin, including costs for heavy use area protection, livestock fencing, filter strips, waste transfer, underground outlets, and critical area plantings.
ATCP 50.86(3)(3)Ineligible costs. A cost-share grant under s. ATCP 50.40 may not reimburse the costs for any of the following:
ATCP 50.86(3)(a)(a) Basins with a structural height of more than 25 feet or with a maximum storage capacity of more than 50 acre-feet.
ATCP 50.86(3)(b)(b) Basins whose failure may endanger human life, or real or personal property.
ATCP 50.86(4)(4)Design, construction, and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse the cost of installing a sediment basin unless all of the following conditions are met:
ATCP 50.86(4)(a)(a) Filter strips or buffers are used to filter any discharge from the sediment basin.
ATCP 50.86(4)(b)(b) The sediment basin complies with all of the following that apply:
ATCP 50.86(4)(b)1.1. NRCS conservation practice standard 342 critical area planting (January, 2018).
ATCP 50.86(4)(b)2.2. NRCS conservation practice standard 350 sediment basin (August, 2016).
ATCP 50.86(4)(b)3.3. NRCS conservation practice standard 634 waste transfer (November, 2022).
ATCP 50.86(4)(b)4.4. NRCS conservation practice standard 382 fence (January, 2014).
ATCP 50.86(4)(b)5.5. NRCS conservation practice standard 635 vegetated treatment area (September, 2016).
ATCP 50.86(4)(b)6.6. NRCS conservation practice standard 561 heavy use area protection (November, 2022).