NR 440.215(9)(j)4.4. MWC unit capacity shall be calculated using a design heating value of 10,500 kilojoules per kilogram (4,500 Btu per pound) for all MSW.
NR 440.215(10)(10)Reporting and recordkeeping requirements. The owner or operator of an affected facility located at an MWC plant with a capacity greater than 225 megagrams per day (250 tons per day) shall provide notification of intent to construct and of planned initial startup date and the type or types of fuels planned for combustion in the affected facility. The MWC unit capacity and MWC plant capacity and supporting capacity calculations shall be provided at the time of the notification of construction.
NR 440.215(10c)(10c)Daily records. The owner or operator of an affected facility located within a small or large MWC plant and subject to the standards under sub. (3), (4), (5), (6) or (7) shall maintain records of the following information for each affected facility for a period of at least 2 years:
NR 440.215(10c)(a)(a) Calendar date.
NR 440.215(10c)(b)(b) The emission rates and parameters measured using CEMS as follows:
NR 440.215(10c)(b)1.1. The following measurements shall be recorded in computer readable format and on paper:
NR 440.215(10c)(b)1.a.a. All 6-minute average opacity levels required under sub. (9) (b).
NR 440.215(10c)(b)1.b.b. All 1-hour average sulfur dioxide emission rates at the inlet and outlet of the acid gas control device if compliance is based on a percent reduction or at the outlet only if compliance is based on the outlet emission limit as specified under sub. (9) (e).
NR 440.215(10c)(b)1.c.c. All 1-hour average nitrogen oxides emission rates as specified under sub. (9) (g).
NR 440.215(10c)(b)1.d.d. All 1-hour average carbon monoxide emission rates, MWC unit load measurements and particulate matter control device inlet temperatures as specified under sub. (9) (h).
NR 440.215(10c)(b)2.2. The following average rates shall be computed and recorded:
NR 440.215(10c)(b)2.a.a. All 24-hour daily geometric average percent reductions in sulfur dioxide emissions and all 24-hour daily geometric average sulfur dioxide emission rates as specified under sub. (9) (e).
NR 440.215(10c)(b)2.b.b. All 24-hour daily arithmetic average nitrogen oxides emission rates as specified under sub. (9) (g).
NR 440.215(10c)(b)2.c.c. All 4-hour block or 24-hour daily arithmetic average carbon monoxide emission rates, as applicable, as specified under sub. (9) (h).
NR 440.215(10c)(b)2.d.d. All 4-hour block arithmetic average MWC unit load levels and particulate matter control device inlet temperatures as specified under sub. (9) (h).
NR 440.215(10c)(c)(c) Identification of the operating days when any of the average emission rates, percent reductions or operating parameters specified under par. (b) 2. or the opacity level exceeded the applicable limits with reasons for such exceedances as well as a description of corrective actions taken.
NR 440.215(10c)(d)(d) Identification of operating days for which the minimum number of hours of sulfur dioxide or nitrogen oxides emissions or operational data, including carbon monoxide emissions, unit load or particulate matter control device temperature, have not been obtained, including reasons for not obtaining sufficient data and a description of corrective actions taken.
NR 440.215(10c)(e)(e) Identification of the times when sulfur dioxide or nitrogen oxides emission or operational data, including carbon monoxide emissions, unit load or particulate matter control device temperature, have been excluded from the calculation of average emission rates or parameters and the reasons for excluding data.
NR 440.215(10c)(f)(f) The results of daily sulfur dioxide, nitrogen oxides and carbon monoxide CEMS drift tests and accuracy assessments as required under procedure 1 of Appendix F of 40 CFR part 60, incorporated by reference in s. NR 440.17.
NR 440.215(10c)(g)(g) The results of all annual performance tests conducted to determine compliance with the particulate matter, dioxin/furan and hydrogen chloride limits. For all annual dioxin/furan tests, the maximum demonstrated MWC unit load and maximum demonstrated particulate matter control device temperature shall be recorded along with supporting calculations.
NR 440.215(10f)(10f)Initial compliance test report. Following the initial compliance test as required under s. NR 440.08 and sub. (9), the owner or operator of an affected facility located within a large MWC plant shall submit the initial compliance test data, the performance evaluation of the CEMS using the applicable performance specifications in Appendix B of 40 CFR part 60, incorporated by reference in s. NR 440.17, and the maximum demonstrated MWC unit load and maximum demonstrated particulate matter control device temperature established during the dioxin/furan compliance test.
NR 440.215(10i)(10i)compliance reports.
NR 440.215(10i)(a)(a) The owner or operator of an affected facility located within a large MWC plant shall submit annual compliance reports for sulfur dioxide, nitrogen oxide if applicable, carbon monoxide, load level and particulate matter control device temperature to the department containing the information recorded under sub. (10c) (a), (b) 2. and (d) to (f) for each pollutant or parameter. The hourly average values recorded under sub. (10c) (b) 1. are not required to be included in the annual reports. The owner or operator of an affected facility shall submit reports semiannually once the affected facility is subject to permitting requirements under Title V of the Act (42 USC 7661 to 7661f).
NR 440.215(10i)(b)(b) The owner or operator shall submit a semiannual report for any pollutant or parameter that does not comply with the pollutant or parameter limits specified in this section. The report shall include the information recorded under sub. (10c) (c). For each of the dates reported, the sulfur dioxide, nitrogen oxide, carbon monoxide, load level and particulate matter control device temperature data, as applicable, recorded under sub. (10c) (b) 2., shall be included.
NR 440.215(10i)(c)(c) Reports shall be postmarked no later than the 30th day following the end of the annual or semiannual period, as applicable.
NR 440.215(10k)(10k)opacity exceedance reports.
NR 440.215(10k)(a)(a) The owner or operator of an affected facility located within a large MWC plant shall submit annual compliance reports, as applicable, for opacity. The annual report shall list the percent of the affected facility operating time for the reporting period that the opacity CEMS was operating and collecting valid data. Once the unit is subject to permitting requirements under Title V of the Act (42 USC 7661 to 7661f), the owner or operator of an affected facility shall submit these reports semiannually.
NR 440.215(10k)(b)(b) The owner or operator shall submit a semiannual report for all periods when the 6-minute average levels exceeded the opacity limit under sub. (3). The semiannual report shall include all information recorded under sub. (10c) (c) which pertains to opacity, and a listing of the 6-minute average opacity levels recorded under sub. (10c) (b) 1. a. which exceeded the opacity limit.
NR 440.215(10k)(c)(c) Reports shall be postmarked no later than the 30th day following the end of the annual of semiannual period, as applicable.