NR 854.05(8)(c)4.e.e. Aquifer drawdown and groundwater quantity and quality conditions as a result of projected groundwater withdrawals. NR 854.05(8)(c)4.f.f. Analysis and summary of any regional hydrogeological studies or assessments and other regional water supply information. NR 854.05(8)(c)5.5. An assessment of anticipated economic impacts and costs associated with carrying out the recommendations in the plan. NR 854.05(9)(9) Analysis of consistency with other plans and agreements. The plan shall include a description and analysis of the plan’s consistency with all of the following, as applicable: NR 854.05(9)(c)(c) Existing land use agreements between the person who owns or operates the public water supply system and any city, village, or town included within the projected growth area. NR 854.05(9)(d)(d) Existing wholesale or retail customer sales agreements between the person who owns or operates the public water supply system and any city, village, or town included within the projected growth area. NR 854.05(9)(e)(e) Any other existing agreements or approvals obtained from a governing body related to the implementation of the projected growth area. NR 854.05(10)(10) Public participation. The plan shall include a description of the public participation process implemented under s. NR 854.08, including a summary of the comments received. NR 854.05(11)(11) Submission of plan to local governments. The plan shall include documentation that the plan has been submitted to the governing body of each city, village, and town whose public water supply is addressed by the plan. NR 854.05(12)(12) Procedures for implementing and updating the plan. The plan shall identify procedures to be used to implement and update the plan and a commitment to using those procedures. NR 854.05 NoteNote: The department advises that the plan uses public service commission data when applicable throughout this section.
NR 854.05 HistoryHistory: CR 23-049: cr. Register June 2024 No. 822, eff. 7-1-24; correction in (5) (e), (8) (a) made under s. 35.17, Stats., and correction in (8) (c) 4. g. made under s. 13.92 (4) (b) 7., Stats., Register June 2024 No. 822. NR 854.06NR 854.06 Cost-effectiveness analyses of water supply alternatives for plans requiring department approval. If department approval is required under s. NR 854.04 (2) or (3), a plan shall include a cost-effectiveness analysis of identified water supply alternatives for meeting the water demand for the planning period. A cost-effectiveness analysis shall include all of the following: NR 854.06(1)(1) Identification and analysis of potential water supply alternatives, which shall include the sources identified under s. NR 854.05 (7). NR 854.06(2)(2) A summary of the expected water demand reduction associated with implementing water conservation and efficiency measures as identified in the public water supply system’s water conservation plan developed under s. NR 852.07, including a summary of the cost savings as determined under s. NR 852.09 or 852.10. NR 854.06(3)(3) A description of the sustainability of each water supply alternative in consideration of existing regional water need assessments and the extent to which each alternative identified under s. NR 854.05 (7) is consistent with existing plans under s. NR 854.05 (8). NR 854.06(4)(4) An evaluation of existing and anticipated costs associated with each water supply alternative identified under s. NR 854.05 (7). Factors to consider in evaluating costs include: construction; operation and maintenance of wells; surface water intakes; treatment plants; chemical feed equipment; pumping facilities; water mains; storage facilities; and purchase of water from a contract supplier. NR 854.06(5)(5) Conclusions on the identified water supply alternatives and a comparative analysis of the alternatives based on the cost-effectiveness analysis. NR 854.06 HistoryHistory: CR 23-049: cr. Register June 2024 No. 822, eff. 7-1-24; correction in (intro.) made under s. 35.17, Stats., Register June 2024 No. 822.