NR 447.05(1)(c)(c) The manufacture of fireproofing and insulating materials. NR 447.05(1)(g)(g) The manufacture of paints, coatings, caulks, adhesives and sealants. NR 447.05(1)(i)(i) The manufacture of chlorine utilizing asbestos diaphragm technology. NR 447.05(2)(2) Standard. Each owner or operator of any of the manufacturing operations to which this section applies shall: NR 447.05(2)(a)1.1. Discharge no visible emissions to the outside air from these operations or from any building or structure in which they are conducted or from any other fugitive sources; or NR 447.05(2)(a)2.2. Use the methods specified by s. NR 447.15 to clean emissions from these operations containing particulate asbestos material before they escape to, or are vented to, the outside air. NR 447.05(2)(b)(b) Monitor each potential source of asbestos emissions from any part of the manufacturing facility, including air cleaning devices, process equipment and buildings housing material processing and handling equipment, at least once each day during daylight hours for visible emissions to the outside air during periods of operation. The monitoring shall be by visual observation of at least 15 seconds duration per source of emissions. NR 447.05(2)(c)(c) Inspect each air cleaning device at least once each week for proper operation and for changes that signal the potential for malfunctions, including, to the maximum extent possible without dismantling other than opening the device, the presence of tears, holes and abrasions in filter bags and for dust deposits on the clean side of bags. For air cleaning devices that cannot be inspected on a weekly basis according to this paragraph, submit to the department, and revise as necessary, a written maintenance plan to include, at a minimum, the following: NR 447.05(2)(d)(d) Maintain records of the results of visible emission monitoring and air cleaning device inspections in a format acceptable to the department and include the following: NR 447.05(2)(d)3.3. Condition of fabric filters, including presence of any tears, holes and abrasions. NR 447.05(2)(d)5.5. Brief description of corrective actions taken, including date and time. NR 447.05(2)(e)(e) Furnish upon request, and make available at the affected facility during normal business hours for inspection by the department, all records required under this section. NR 447.05(2)(f)(f) Retain a copy of all monitoring and inspection records for at least 2 years. NR 447.05(2)(g)(g) Submit quarterly a copy of the visible emission monitoring records to the department if visible emissions occurred during the report period. Quarterly reports shall be postmarked by the 30th day following the end of the calendar quarter. NR 447.05 HistoryHistory: Cr. Register, October, 1992, No. 442, eff. 11-1-92. NR 447.06NR 447.06 Demolition and renovation; applicability.