NR 422.128(4)(4) Application methods. An owner or operator of an affected facility under this section shall use one or a combination of the following application methods: NR 422.128(4)(d)(d) Roll coating or hand application, including non-spray application methods similar to hand or mechanically powered caulking gun, brush, or direct hand application. NR 422.128(4)(h)(h) Other adhesive application methods that are capable of achieving a transfer efficiency equivalent to or better than that achieved by high-volume, low-pressure spraying and are approved by the department in writing. NR 422.128(5)(5) Add-on control equipment requirements. An owner or operator that uses add-on control equipment as described under sub. (3) (b) shall comply with the applicable monitoring, testing, and recordkeeping requirements specified under ss. NR 439.04 (5) (e), 439.055, and 439.075. NR 422.128(6)(6) Work practices for adhesive application processes. The owner or operator of an affected facility under this section shall do all of the following for adhesive or adhesive primer application processes: NR 422.128(6)(a)(a) Store all VOC-containing adhesives, adhesive primers, and process-related waste materials in closed containers. NR 422.128(6)(b)(b) Ensure that mixing and storage containers used for VOC-containing adhesives, adhesive primers, and process-related waste materials are kept closed at all times, except when depositing or removing those materials. NR 422.128(6)(c)(c) Minimize spills of VOC-containing adhesives, adhesive primers, and process-related waste materials. NR 422.128(6)(d)(d) Convey VOC-containing adhesives, adhesive primers, and process-related waste materials from one location to another in closed containers or pipes. NR 422.128(7)(7) Cleaning material work practices. The owner or operator of an affected facility under this section shall do all of the following for cleaning materials: NR 422.128(7)(a)(a) Store all VOC-containing cleaning materials and used shop towels in closed containers. NR 422.128(7)(b)(b) Ensure that storage containers used for VOC-containing materials are kept closed at all times, except when depositing or removing those materials. NR 422.128(7)(c)(c) Convey VOC-containing cleaning materials from one location to another in closed containers or pipes. NR 422.128(7)(e)(e) Minimize emissions of VOCs during cleaning of coating application, storage, mixing, and conveying equipment by ensuring that cleaning is performed without atomizing any VOC-containing cleaning material and that the used material is captured and contained. NR 422.128(9)(a)(a) Compliance schedule. The owner or operator of a facility shall comply with the applicable requirements of this section upon the facility becoming subject to this section as provided under sub. (1), except for any of the following: NR 422.128(9)(a)1.1. The owner or operator of a facility subject to this section that commenced construction before June 1, 2022, shall comply with applicable requirements of this section by November 28, 2022. Any facility that was subject to s. NR 422.127 before June 1, 2022, shall continue to comply with the requirements in s. NR 422.127 until the date when the facility is in compliance with the applicable requirements of this section or until November 28, 2022, whichever is sooner. NR 422.128(9)(a)2.2. The owner or operator of a facility that becomes subject to this section due to either the designation or the reclassification of a nonattainment area that occurs after June 1, 2022, shall comply with applicable requirements of this section within 180 days after the effective date of the nonattainment designation or reclassification, as indicated by the relevant Federal Register publication. NR 422.128(9)(b)(b) Certification. No later than 60 days after the compliance deadline specified under par. (a), the owner or operator of a facility subject to this section shall submit to the department written certification that all affected adhesive or adhesive primer application processes are in compliance with the applicable requirements of this section. The owner or operator of a facility subject to s. NR 422.127 before June 1, 2022, that is required to have an operation permit under ch. NR 407 shall submit to the department a permit application or a permit revision or renewal application that meets the requirements of s. NR 407.05 to meet this certification requirement, except that no application shall be required for a source operating under a general operation permit or a registration operation permit issued under s. NR 407.10 or 407.105.