NR 463.15(16)(e)(e) A system for assuring that only acceptable scrap is charged to an affected group 1 furnace.
NR 463.15(16)(f)(f) Recordkeeping requirements to document conformance with plan requirements.
NR 463.15(17)(17)Monitoring of scrap contamination level by calculation method for group 1 furnace without add-on air pollution control devices. The owner or operator of a group 1 furnace dedicated to processing a distinct type of furnace feed or charge composed of scrap with a uniform composition, such as rejected product from a manufacturing process for which the coating-to-scrap ratio can be documented, may include a program in the site-specific monitoring plan for determining, monitoring and certifying the scrap contaminant level using a calculation method rather than a scrap inspection program. A scrap contaminant monitoring program using a calculation method shall include all of the following:
NR 463.15(17)(a)(a) Procedures for the characterization and documentation of the contaminant level of the scrap prior to the performance test.
NR 463.15(17)(b)(b) Limitations on the scrap in the furnace feed or charge to scrap of the same composition as that used in the performance test. If the performance test was conducted with a mixture of scrap and clean charge, limitations on the proportion of scrap in the furnace feed or charge to no greater than the proportion used during the performance test.
NR 463.15(17)(c)(c) Operating, monitoring, recordkeeping and reporting requirements to ensure that no scrap with a contaminant level higher than that used in the performance test is charged to the furnace.
NR 463.15(18)(18)Group 2 furnace. The requirements of this subsection apply to the owner or operator of a new or existing group 2 furnace. The owner or operator shall do both of the following:
NR 463.15(18)(a)(a) Record a description of the materials charged to each furnace, including any nonreactive, non-HAP-containing, non-HAP-generating fluxing materials or agents.
NR 463.15(18)(b)(b) Submit a certification of compliance with the applicable operational standard for charge materials in s. NR 463.14 (15) for each 6-month reporting period. Each certification shall contain the information in s. NR 463.18 (2) (b) 5.
NR 463.15(19)(19)Site-specific requirements for secondary aluminum processing units.
NR 463.15(19)(a)(a) An owner or operator of a secondary aluminum processing unit at a facility shall include, within the OM&M plan prepared in accordance with sub. (2), all of the following information:
NR 463.15(19)(a)1.1. The identification of each emission unit in the secondary aluminum processing unit.
NR 463.15(19)(a)2.2. The specific control technology or pollution prevention measure to be used for each emission unit in the secondary aluminum processing unit and the date of its installation or application.
NR 463.15(19)(a)3.3. The emission limit calculated for each secondary aluminum processing unit and performance test results with supporting calculations demonstrating initial compliance with each applicable emission limit.
NR 463.15(19)(a)4.4. Information and data demonstrating compliance for each emission unit with all applicable design, equipment, work practice or operational standards of this subchapter.
NR 463.15(19)(a)5.5. The monitoring requirements applicable to each emission unit in a secondary aluminum processing unit and the monitoring procedures for daily calculation of the 3-day, 24-hour rolling average using the procedure in sub. (20).
NR 463.15(19)(b)(b) The SAPU compliance procedures within the OM&M plan may not contain any of the following provisions:
NR 463.15(19)(b)1.1. Any averaging among emissions of differing pollutants.
NR 463.15(19)(b)2.2. The inclusion of any affected sources other than emission units in a secondary aluminum processing unit.
NR 463.15(19)(b)3.3. The inclusion of any emission unit while it is shut down.
NR 463.15(19)(b)4.4. The inclusion of any periods of startup, shutdown or malfunction in emission calculations.
NR 463.15(19)(c)(c) To revise the SAPU compliance provisions within the OM&M plan prior to the end of the permit term, the owner or operator shall submit a request to the department containing the information required by par. (a) and obtain approval of the department prior to implementing any revisions.
NR 463.15(20)(20)Secondary aluminum processing unit. Except as provided in sub. (21), the owner or operator shall calculate and record the 3-day, 24-hour rolling average emissions of PM, HCl and D&F for each secondary aluminum processing unit on a daily basis. To calculate the 3-day, 24-hour rolling average, the owner or operator shall do all of the following:
NR 463.15(20)(a)(a) Calculate and record the total weight of material charged to each emission unit in the secondary aluminum processing unit for each 24-hour day of operation using the feed or charge weight information required in sub. (5). If the owner or operator chooses to comply on the basis of weight of aluminum produced by the emission unit, rather than weight of material charged to the emission unit, all performance test emissions results and all calculations shall be conducted on the aluminum production weight basis.
NR 463.15(20)(b)(b) Multiply the total feed or charge weight to the emission unit, or the weight of aluminum produced by the emission unit, for each emission unit for the 24-hour period by the emission rate, in lb/ton of feed or charge, for that emission unit, as determined during the performance test, to provide emissions for each emission unit for the 24-hour period, in pounds.
NR 463.15(20)(c)(c) Divide the total emissions for each SAPU for the 24-hour period by the total material charged to the SAPU, or the weight of aluminum produced by the SAPU over the 24-hour period, to provide the daily emission rate for the SAPU.
NR 463.15(20)(d)(d) Compute the 24-hour daily emission rate using Equation 4:
å
å
´
(Equation 4)
where: