PSC 134.19(3)(a)(a) Over 115; 110.1-115; 105.1-110; 103.1-105; 102.1-103; 101.1-102; 100.1-101; 100; 99-99.9; 98-98.9; 97-97.9; 95-96.9; 90-94.9; 85-89.9; under 85; passing gas does not register; does not pass gas; not tested; grand total average % error of fast meters; average % error of slow meters; total average error; number tested, number in service. PSC 134.19 HistoryHistory: Cr. Register, February, 1959, No. 38, eff. 3-1-59; CR 13-033: r. and recr. (1), (2), cr. (3) (title) Register July 2015 No. 715, eff. 8-1-15. PSC 134.20PSC 134.20 Preservation of records. A utility shall preserve the following records in a readable format and keep them available for inspection by the commission for the periods indicated. The list is not a complete list of all types of utility records. PSC 134.20 NoteNote: See Federal Power Commission Orders 54 and 156 for preservation of records. Public Service Commission’s Classification of Accounts, and s. 18.01, Stats. PSC 134.20 NoteNote: * Note that if meter test records are being used as meter history records under PSC 134.19 (1) (c), the meter test records must be preserved for the time period required for meter history records.
PSC 134.20 NoteNote: See also “Investigation to Consider Proposed Changes to Records Retention Requirements for Electric, Gas and Water Utilities” adopted by the commission in docket 5-US-114, December 12, 2006, as amended March 19, 2009, for a more comprehensive listing of retention periods of specific records.
PSC 134.21PSC 134.21 Heating values and specific gravity. PSC 134.21(1)(1) Each utility which is furnishing gas service shall have on file with this commission for each municipality served the heating value, specific gravity, and composition of each type of gas regularly supplied and also for the gas which may be used for standby purposes and the range of values for peak shaving. The heating value filed shall be the total heating value with the indication whether it is on a wet or dry basis. (See definitions in s. PSC 134.02.) PSC 134.21(2)(2) All gases whether the regular gas supply, a mixture of gases or a substitute gas used for peak shaving purposes shall operate properly in normal gas utilization equipment. Where used for emergency or standby, the gas shall operate reasonably well in such equipment. (The customer requiring gas of a particular chemical composition shall make such arrangements as may be required to protect against damage by reason of change in composition.) PSC 134.21(3)(3) The monthly average heating value of the gases as delivered to the customers in any service area shall not be less than the heating value standard on file with this commission and the heating value at any time at constant specific gravity shall not be more than 5% above or 4% below this standard. At constant heating value, the specific gravity of the gas shall not vary more than 10% from the standards filed with the commission. If the heating value is varied by a greater amount than specified, the specific gravity shall be varied in such a way that the gas will operate satisfactorily in the customer’s utilization equipment. Customers using processes that may be affected by a change in the chemical composition of the gas shall be notified of changes. Agreements with such customers shall specify the allowable variation in composition. PSC 134.21(4)(4) For required periodic heating value tests see s. PSC 134.25. The specific gravity of the gas shall be determined at least once each month when there is no change in the type or sources of gas and when there is a change in the type of gas. Whenever emergency or peak shaving plants are ran or when mixed gases are used, daily determinations of specific gravity shall be made. PSC 134.21 HistoryHistory: Cr. Register, February, 1959. No. 38, eff. 3-1-59. PSC 134.22(1)(1) In no case shall gas contain more than 30 grains of sulphur per 100 standard cubic feet, 5 grains of ammonia per 100 standard cubic feet, nor more than 0.1 grain of hydrogen sulphide per 100 standard cubic feet. (Exception. If the gas is not to be placed in pipe or bottle type holders the hydrogen sulphide content may be 0.3 grains per 100 standard cubic feet.) PSC 134.22(2)(2) Utilities supplying gas containing coal or water gas shall make quantitative determinations of total sulphur at least once every 6 months and qualitative hydrogen sulphide tests at intervals of 1 hour to 2 weeks depending upon the probability of this impurity being found. PSC 134.22(3)(3) Utilities supplying liquefied petroleum gas, or liquefied petroleum air mixtures, or natural gas shall test the gas periodically for impurities or periodically obtain data concerning impurities from sources they believe the commission can accept as reliable. PSC 134.22 HistoryHistory: Cr. Register, February, 1959, No. 38, eff. 3-1-59. PSC 134.23(1)(1) Every utility supplying gas shall file with the commission a standard service pressure by service areas. The service pressure shall be of such a value that the maximum pressure at any outlet as specified below shall not be greater than 12 inches of water column except for customers utilizing high-pressure service. PSC 134.23(2)(2) For customers receiving standard service pressure, the gas pressure at the outlet of the utility’s service meters shall meet the following requirements: PSC 134.23(2)(a)(a) At no outlet in the service area shall it ever be greater than one and one-fourth of the standard service pressure nor greater than 12 inches of water nor ever be less than one-half of the standard service pressure nor less than 4 inches of water. PSC 134.23(2)(b)(b) At any single outlet it shall never be greater than twice the actual minimum at the same outlet. PSC 134.23(2)(c)(c) At any one outlet the normal variation of pressure shall not be greater than the following: PSC 134.23(3)(3) For customers utilizing gas at high pressure, a service pressure shall be agreed upon by the utility and the customer, and the maximum pressure variation shall not exceed 15% of the agreed pressure unless the commission shall authorize a greater variation. PSC 134.23(4)(4) No utility shall furnish gas to any customer at pressures higher than its filed standard service pressure until it has filed with the commission acceptable service rules governing high-pressure service to customers desiring to utilize gas at pressures higher than standard service pressure. Such service rules shall provide that the utility will make high-pressure service available to its customers upon request whenever high pressure gas is available at the customer’s premises or may be made available in accordance with the utility’s filed extension rules, and when such high pressure is required for proper operation of the customer’s present or proposed utilization equipment. PSC 134.23 HistoryHistory: Cr. Register, February, 1959, No. 38, eff. 3-1-59. PSC 134.25PSC 134.25 General use of calorimeter equipment. PSC 134.25(1)(1) Unless specifically directed otherwise a calorimeter shall be maintained at each gas producing or mixing plant whether the plant is in continuous operation or used only for standby or peak shaving purposes. The calorimeter shall be used to check the operation of the plant and shall measure the heating value of the gas going to the gas lines.