AB68-ASA2,288
9Section
288. 84.062 (1) (d) of the statutes is amended to read:
AB68-ASA2,312,1210
84.062
(1) (d) “Design-builder" means a private legal entity, consortium, or
11joint venture that proposes to or executes a contract
with the office to design,
12engineer, and construct a project under this section.
AB68-ASA2,289
13Section
289. 84.062 (1) (dm) of the statutes is created to read:
AB68-ASA2,312,1514
84.062
(1) (dm) “Design professional” means a person registered under s.
15443.03 or 443.04 or a firm, partnership, or corporation registered under s. 443.08.
AB68-ASA2,290
16Section
290. 84.062 (1) (g) of the statutes is created to read:
AB68-ASA2,312,1817
84.062
(1) (g) “Director” means the director of the office of innovative program
18delivery attached to the department under s. 15.463 (1).
AB68-ASA2,291
19Section
291. 84.062 (1) (h) of the statutes is amended to read:
AB68-ASA2,312,2320
84.062
(1) (h) “Fixed price variable scope design-build contract” means a
21design-build contract award made to the
lowest qualified responsible bidder able to
22provide the best
qualitative scope of work at a price not to exceed a fixed price
set by
23the office.
AB68-ASA2,292
24Section
292. 84.062 (1) (j) of the statutes is created to read:
AB68-ASA2,313,2
184.062
(1) (j) “Member” means a private legal entity that is a member of a
2consortium or joint venture that is a design-builder.
AB68-ASA2,293
3Section
293. 84.062 (1) (k) of the statutes is amended to read:
AB68-ASA2,313,54
84.062
(1) (k) “Office” means
the office of innovative program delivery attached
5to the department
under s. 15.463 (1).
AB68-ASA2,294
6Section
294. 84.062 (1) (L) of the statutes is created to read:
AB68-ASA2,313,87
84.062
(1) (L) “Project” means a project involving a highway improvement, as
8defined in s. 84.063 (1) (a).
AB68-ASA2,295
9Section
295. 84.062 (1) (m) of the statutes is amended to read:
AB68-ASA2,313,1210
84.062
(1) (m) “Qualified responsible bidder” means a design-builder
11responding to a request for qualifications
and that is certified by the technical review
12committee.
AB68-ASA2,296
13Section
296. 84.062 (1) (p) of the statutes is created to read:
AB68-ASA2,313,1514
84.062
(1) (p) “Technical review committee” means the committee appointed
15under sub. (3).
AB68-ASA2,297
16Section
297. 84.062 (2) of the statutes is repealed and recreated to read:
AB68-ASA2,313,2117
84.062
(2) Design-build projects. (a) The department shall administer a pilot
18program under which not more than 6 contracts are awarded for design-build
19projects to be completed no later than December 31, 2025. The director may not
20designate a project as a design-build project unless the department is able to clearly
21define the scope of work.
AB68-ASA2,313,2322
(b) The department may not expend more than $250,000,000 for 6 design-build
23contracts designated as follows:
AB68-ASA2,313,2524
1. One low bid design-build contract for a project with an estimated value of
25not less than $5,000,000 and not more than $25,000,000.
AB68-ASA2,314,2
12. One best value design-build contract for a project with an estimated value
2of not less than $25,000,000 and not more than $75,000,000.
AB68-ASA2,314,43
3. One fixed price variable scope design-build contract with an estimated value
4of not less than $25,000,000 and not more than $75,000,000.
AB68-ASA2,314,85
4. Three contracts designated by the director with a total estimated value of not
6more than $125,000,000. The department may enter into a low bid design-build
7contract, best value design-build contract, or fixed price variable scope design-build
8contract under this subdivision.
AB68-ASA2,314,139
(c) For each project designated as a design-build project under par. (b), the
10office shall prepare a written analysis supporting the office's determination that it
11is in the best interests of the state to make the designation. The written analysis and
12supporting materials are subject to inspection under s. 19.35. The written analysis
13shall include all of the following:
AB68-ASA2,314,1514
1. The extent to which the department can adequately define the project
15requirements in a proposed scope of design and construction.
AB68-ASA2,314,1616
2. The impact on the projected project schedule and completion date.
AB68-ASA2,314,1717
3. The impact on the projected cost of the project.