NR 440.62(8)(b)(b) The initial semiannual report to the department shall include the following information:
NR 440.62(8)(b)1.1. Process unit identification.
NR 440.62(8)(b)2.2. Number of valves subject to the requirements of sub. (3) (g), excluding those valves designated for no detectable emissions under the provisions of sub. (3) (g) 6.
NR 440.62(8)(b)3.3. Number of pumps subject to the requirements of sub. (3) (b), excluding those pumps designated for no detectable emissions under the provisions of sub. (3) (b) 5. and those pumps complying with sub. (3) (b) 6.
NR 440.62(8)(b)4.4. Number of compressors subject to the requirements of sub. (3) (c), excluding those compressors designated for no detectable emissions under the provisions of sub. (3) (c) 9. and those compressors complying with sub. (3) (c) 8.
NR 440.62(8)(c)(c) All semiannual reports to the department shall include the following information summarized from the information in sub. (7):
NR 440.62(8)(c)1.1. Process unit identification.
NR 440.62(8)(c)2.2. For each month during the semiannual reporting period.
NR 440.62(8)(c)2.a.a. Number of valves for which leaks were detected as described in sub. (3) (g) 2. or (4) (b),
NR 440.62(8)(c)2.b.b. Number of valves for which leaks were not repaired as required in sub. (3) (g) 4. a.,
NR 440.62(8)(c)2.c.c. Number of pumps for which leaks were detected as described in sub. (3) (b) 2. and 4. f. 1),
NR 440.62(8)(c)2.d.d. Number of pumps for which leaks were not repaired as required in sub. (3) (b) 3. a. and 4. f. 2),
NR 440.62(8)(c)2.e.e. Number of compressors for which leaks were detected as described in sub. (3) (c) 6.,
NR 440.62(8)(c)2.f.f. Number of compressors for which leaks were not repaired as required in sub. (3) (c) 7. a., and
NR 440.62(8)(c)2.g.g. The facts that explain each delay of repair and, where appropriate, why a process unit shutdown was technically infeasible.
NR 440.62(8)(c)3.3. Dates of process unit shutdowns which occurred within the semiannual reporting period.
NR 440.62(8)(c)4.4. Revisions to items reported according to par. (b) if changes have occurred since the initial report or subsequent revisions to the initial report.
NR 440.62(8)(d)(d) An owner or operator electing to comply with the provisions of sub. (4) (a) or (b) shall notify the department of the alternative standard selected 90 days before implementing either of the provisions.
NR 440.62(8)(e)(e) An owner or operator shall report the results of all performance tests in accordance with s. NR 440.08. The provisions of s. NR 440.08 (4) do not apply to affected facilities subject to the provisions of this section except that an owner or operator must notify the department of the schedule for the initial performance tests at least 30 days before the initial performance tests.
NR 440.62(9)(9)Reconstruction. For the purpose of this section:
NR 440.62(9)(a)(a) The cost of the following frequently replaced components of the facility may not be considered in calculating either the“fixed capital cost of the new components” or the “fixed capital costs that would be required to construct a comparable new facility” under s. NR 440.15: pump seals, nuts and bolts, rupture disks and packings.
NR 440.62(9)(b)(b) Under s. NR 440.15 the “fixed capital cost of new components” includes the fixed capital cost of all depreciable components (except components specified in par. (a) which are or will be replaced pursuant to all continuous programs of component replacement which are commenced within any 2-year period following the applicability date for the appropriate section. (See the “applicability and designation of affected facility” subsection of the appropriate section.) For purposes of this paragraph “commenced” means that an owner or operator has undertaken a continuous program of component replacement or that an owner or operator has entered into a contractual obligation to undertake a continuous program of component replacement or that an owner or operator has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of component replacement.
NR 440.62(10)(10)List of chemicals produced by affected facilities.
NR 440.62(10)(a)(a) The chemicals listed in Table A are produced, as intermediates or final products, by process units covered under this section. The applicability date for process units producing one or more of these chemicals is January 5, 1981.
- See PDF for table PDF
a CAS numbers refer to the Chemical Abstracts Registry numbers assigned to specific chemicals, isomers, or mixtures of chemicals. Some isomers or mixtures that are covered by the standards do not have CAS numbers assigned to them. The standards apply to all of the chemicals listed, whether CAS numbers have been assigned or not.
b No CAS number(s) have been assigned to this chemical, its isomers, or mixtures containing these chemicals.
c CAS numbers for some of the isomers are listed; the standards apply to all of the isomers and mixtures, even if CAS numbers have not been assigned.