ATCP 93.100(1)(b)10.10. Fuel supply tanks which are used for a mobile power plant or mobile heating plant and which meet all of the following requirements: ATCP 93.100(1)(b)11.11. Where the department determines that the review of a specific application, modification or contractor activity would not meet the regulatory oversight objective for technical plan review and approval. ATCP 93.100(1)(c)(c) Notwithstanding pars. (a) and (b), if the department determines that the review of a specific application, modification or special equipment meets the regulatory oversight objective of this chapter, a plan review and written approval from the authorized agent or the department shall be obtained. ATCP 93.100(2)(2) Plans, specifications and information. Plans, specifications and information submitted to the authorized agent or the department for review and approval shall contain all of the following: ATCP 93.100(2)(a)(a) Plans that are clear and legible and submitted per department requirements along with fees and a completed installation application. ATCP 93.100(2)(b)2.2. The name of the person, firm or corporation proposing the installation, if other than the owner. ATCP 93.100(2)(b)3.3. The address of the facility, including the names of adjacent streets and highways. ATCP 93.100(2)(c)1.1. A plot plan, drawn to a minimum scale of one inch equals 20 feet, indicating the location of the installation with respect to property lines; adjoining streets or alleys; fences, including those installed over or through any part of the system; and other buildings on the same property. The plot plan shall indicate the location of buildings; other tanks; loading and unloading points; utilities; sanitary or storm sewers; water mains; water service piping; community and private potable water wells or other potable water source on the subject property; any private potable water wells on adjacent property that are within 100 feet of the tank, piping or dispenser; and any offsite community wells that are within 1,200 feet of the tank, piping or dispenser. ATCP 93.100(2)(c)1m.1m. For installations where cathodic protection will be installed, buried metal underground structures and components within 200 feet, such as culverts and guy wire anchor points, should be included in the plot plan. ATCP 93.100 NoteNote: See s. ATCP 93.260 for minimum separating distances between tank systems and potable water supply sources. ATCP 93.100 NoteNote: Chapter NR 116 requires municipalities to prohibit any storage of materials that are buoyant, flammable, explosive or injurious to animal, plant or aquatic life, in floodway areas of floodplains. ATCP 93.100(2)(c)2.2. The class of construction of each building or room in a building that contains a storage tank shall also be indicated. ATCP 93.100(2)(d)(d) The location, size and capacity of each tank and the following information on the contents of the tank: ATCP 93.100 NoteNote: Flammability and combustibility classifications are established in NFPA 30 sections 4.3.1 and 4.3.2, and are expressed as a Roman numeral and a letter, such as IB or IIIA.
ATCP 93.100(2)(d)3.3. Whether the stored liquid is classified in any of the following hazard categories as defined in the applicable model fire code adopted by reference under ch. SPS 314: