ATCP 40.20(3)(f)(f) A current list of soil or plant additives for which the applicant requires permits under s. ATCP 40.28 (1), and the current label for each of those products.
ATCP 40.20 NoteNote: A license under sub. (1) does not authorize the license holder to manufacture or distribute a soil or plant additive for which a permit is required under s. ATCP 40.28 unless the license holder holds that permit.
ATCP 40.20(3)(g)(g) Other relevant information required by the department.
ATCP 40.20(4)(4)License fees. A person applying for an annual soil or plant additive license shall pay the following fees and surcharges:
ATCP 40.20(4)(a)(a) A license fee of $25.
ATCP 40.20(4)(b)(b) A late renewal fee of $5 if the applicant fails to apply for a renewal license before the prior year’s license expires.
ATCP 40.20 NoteNote: See s. 93.21, Stats.
ATCP 40.20(5)(5)Action on license application.
ATCP 40.20(5)(a)(a) Except as provided in par. (d), the department shall grant or deny a license application under sub. (3) within 45 working days after the department receives a complete application.
ATCP 40.20(5)(b)(b) The department may place conditions on a license. If the department denies a license application or issues a license with conditions, the department shall give the applicant written notice of the reasons.
ATCP 40.20(5)(c)(c) A license holder may not distribute a soil or plant additive for which a permit is required under s. ATCP 40.28 (1) unless the license holder also holds that permit.
ATCP 40.20(5)(d)(d) If a license applicant does not manufacture soil or plant additives in Wisconsin, but seeks a license only to distribute a soil or plant additive for which a permit is required under s. ATCP 40.28 (1), the department may grant or deny the license application when it grants or denies the permit application.
ATCP 40.20 HistoryHistory: CR 04-140: cr. Register September 2005 No. 597, eff. 10-1-05; CR 18-019: am. (1) Register January 2020 No. 769, eff. 2-1-20.
ATCP 40.22ATCP 40.22Soil or plant additives; tonnage reports and fees.
ATCP 40.22(1)(1)Annual tonnage report and fee payment. By September 30 of each year, a person required to hold a license under s. ATCP 40.20 shall do all of the following:
ATCP 40.22(1)(a)(a) Report to the department the number of tons of each soil or plant additive the person distributed in this state from July 1 to June 30 of the preceding year. The person shall file the report in writing, on a form provided by the department.
ATCP 40.22(1)(b)(b) Pay fees and surcharges under sub. (2). The person shall include the payment with the tonnage report under par. (a).
ATCP 40.22(2)(2)Fee amounts. A person shall pay the following fees and surcharges on tonnage reported under sub. (1) (a):
ATCP 40.22(2)(a)(a) A basic fee of 25 cents per ton, or $25, whichever is greater.
ATCP 40.22(2)(b)(b) A research fee of 10 cents per ton, or $1, whichever is greater.
ATCP 40.22(2)(c)(c) A groundwater fee of 10 cents per ton, or $1, whichever is greater.
ATCP 40.22(3)(3)Combinations and fillers. A person shall include all of the following in the tonnage reported under sub. (1) (a):
ATCP 40.22(3)(a)(a) Combination products that contain a soil or plant additive, if any.
ATCP 40.22(3)(b)(b) All fillers, carriers, and fluids included with a soil or plant additive at the time of distribution.
ATCP 40.22(4)(4)Penalties for late filing. A person who fails to comply with sub. (1) by September 30 shall pay an additional fee of 10 percent of the tonnage fees due, but not less than $10.
ATCP 40.22 NoteNote: The department may also suspend a license or permit for nonpayment of fees.
ATCP 40.22 HistoryHistory: CR 04-140: cr. Register September 2005 No. 597, eff. 10-1-05; CR 18-019: am. (1) (intro.), (a), (4) Register January 2020 No. 769, eff. 2-1-20.
ATCP 40.24ATCP 40.24Soil or plant additives; labeling.
ATCP 40.24(1)(1)General. A soil or plant additive shall be clearly and conspicuously labeled with all of the following: