NR 466.10(6)(c)(c) Conduct monitoring in accordance with the plan submitted to the department unless comments received from the department require an alternate monitoring scheme. NR 466.10 HistoryHistory: Cr. Register, March, 2000, No. 531, eff. 4-1-00. NR 466.11NR 466.11 Recordkeeping requirements. NR 466.11(2)(2) Each owner or operator of an affected source subject to this chapter shall maintain on a monthly basis, in accordance with the requirements of s. NR 460.09 (2) (a), all of the following records: NR 466.11(2)(a)(a) Records specified in s. NR 460.09 (2) (b), of all measurements needed to demonstrate compliance with this chapter, such as continuous emission monitor data, control device and capture system operating parameter data, material usage, HAP usage, volatile matter usage and solids usage that support data that the source is required to report. NR 466.11(3)(3) Each owner or operator of an affected source subject to this chapter shall maintain records of all liquid-liquid material balances performed in accordance with the requirements of ss. NR 466.06 and 466.07. The records shall be maintained in accordance with the requirements of s. NR 460.09 (2). NR 466.11(4)(4) The owner or operator of each facility which commits to the criteria of s. NR 466.01 (1) (a) 2. shall maintain records of all required measurements and calculations needed to demonstrate compliance with these criteria, including the mass of all HAP containing materials used and the mass fraction of HAP present in each HAP containing material used, on a monthly basis. NR 466.11(5)(a)(a) The owner or operator of each facility which meets the criteria of s. NR 466.015 (3) (a) shall maintain records of the total volume of each material applied on product and packaging rotogravure or wide-web flexographic printing presses during each month. NR 466.11(5)(b)(b) The owner or operator of each facility which meets the criteria of s. NR 466.015 (3) (b) shall maintain records of the total volume and organic HAP content of each material applied on product and packaging rotogravure or wide-web flexographic printing presses during each month. NR 466.11(5)(c)(c) The records required under pars. (a) and (b) shall be maintained for 5 years and, upon request, submitted to the department. NR 466.11(6)(6) The owner or operator choosing to exclude from an affected source a product and packaging rotogravure or wide-web flexographic press which meets the limits and criteria of s. NR 466.015 (1) (b) 2. shall maintain the following records for 5 years and submit them to the department upon request: NR 466.11(6)(a)(a) The total mass of each material applied each month on the press, including all inboard and outboard stations. NR 466.11(6)(b)(b) The total mass of each material applied each month on the press by product and packaging rotogravure or wide-web flexographic printing operations. NR 466.11 HistoryHistory: Cr. Register, March, 2000, No. 531, eff. 4-1-00. NR 466.12(1)(1) Except as provided in this section, reporting requirements of ch. NR 460 apply to owners and operators of affected sources subject to this chapter as indicated in ch. NR 460 Appendix KK. NR 466.12(2)(2) Each owner or operator of an affected source subject to this chapter shall submit the following reports to the department: NR 466.12(2)(a)1.1. Initial notifications for existing sources shall have been submitted no later than June 1, 1998. NR 466.12(2)(a)3.3. For the purpose of this chapter, a permit application for approval of construction or reconstruction under ch. NR 406 may be used in lieu of the initial notification required under s. NR 460.08 (2), provided the same information is contained in the permit application as required by s. NR 460.08 (2). NR 466.12(2)(a)4.4. Permit applications shall be submitted by the same due dates as those specified for the initial notifications. NR 466.12(2)(b)(b) A notification of performance tests as specified in ss. NR 460.06 and 460.08 (5). This notification, and the site-specific test plan required under s. NR 460.06 (2), shall identify the operating parameter to be monitored to ensure that the capture efficiency measured during the performance test is maintained. The operating parameter identified in the site-specific test plan shall be considered to be approved unless explicitly disapproved, or unless comments received from the department require monitoring of an alternate parameter.