NR 439.075(2)(c)3.i.i. Control devices at facilities subject to the flexible vinyl and urethane coating and printing requirements of s. NR 440.65.
NR 439.075(2)(c)3.j.j. Control devices at synthetic organic chemical manufacturing facilities subject to the requirements of s. NR 440.675, 440.686 or 440.705.
NR 439.075(2)(c)3.k.k. Control devices at facilities subject to the magnetic tape coating requirements of s. NR 440.71.
NR 439.075(2)(c)3.L.L. Control devices at facilities subject to the polymeric coating of supporting substrate requirements of s. NR 440.74.
NR 439.075(2)(c)4.4. Compliance emission testing for lead is required for grid casting, paste mixing, 3-process operation, lead oxide, lead reclamation and other lead emitting sources at lead acid battery manufacturing plants subject to s. NR 440.52.
NR 439.075(2)(c)5.5. Compliance emission testing for nitrogen oxides is required for fossil fuel fired steam generators subject to s. NR 440.19 or 440.20.
NR 439.075(2)(c)6.6. Compliance emission testing for fluorides is required for the following:
NR 439.075(2)(c)6.a.a. Reactors, filters, evaporators and hot wells at wet process phosphoric acid plants subject to s. NR 440.37.
NR 439.075(2)(c)6.b.b. Evaporators, hot wells, acid sumps and cooling tanks at super phosphoric acid plants subject to s. NR 440.38.
NR 439.075(2)(c)6.c.c. Reactors, granulators, dryers, coolers, screens and mills at diammonium phosphate plants subject to s. NR 440.39.
NR 439.075(2)(c)6.d.d. Mixers, curing belts or dens, reactors, granulators, dryers, cookers, screens, mills and facilities which store run-of-pile material at triple superphosphate plants subject to s. NR 440.40.
NR 439.075(2)(c)6.e.e. Storage or curing piles, conveyors, elevators, screens and mills at granular triple superphosphate storage facilities subject to s. NR 440.41.
NR 439.075(3)(3)Testing schedules.
NR 439.075(3)(a)(a) The owner or operator of a direct stationary source which has received a construction permit shall perform the compliance emission tests required under sub. (2) during the initial operating period authorized by the permit.
NR 439.075(3)(b)(b) Unless otherwise required by statute, rule or permit condition, the owner or operator of a direct stationary source which has received an operation permit shall perform the compliance emission tests required under sub. (2) every 24 months as long as the permit remains valid. Each biennial test shall be performed within 90 days of the anniversary date of the issuance of the permit or within 90 days of an alternate date specified by the department.
NR 439.075(3)(c)(c) The owner or operator of a direct stationary source which has received an elective operation permit under s. 285.60 (2) (b), Stats., shall perform the compliance emission tests required under sub. (2) every 24 months as long as the permit remains valid. Each biennial test shall be performed within 90 days of the anniversary date of the issuance of the permit or within 90 days of an alternate date specified by the department.
NR 439.075(4)(4)Exceptions to compliance emission testing requirements.
NR 439.075(4)(a)(a) The following exceptions apply to the testing required under sub. (2) (a) or (c):
NR 439.075(4)(a)1.1. The department may grant a written waiver of a scheduled test if any of the following applies:
NR 439.075(4)(a)1.a.a. The direct stationary source associated with the emission point subject to the testing requirement will be ceasing operation within one year of a scheduled test.
NR 439.075(4)(a)1.b.b. The most recently completed test results from a test conducted according to the methods and procedures specified in s. NR 439.07 for the direct stationary source demonstrate that the emissions of the air contaminant for which compliance emission testing is required under this section are 50% or less of the applicable emission limitation.
NR 439.075(4)(a)1.c.c. The direct stationary source associated with the emission point subject to the testing requirement has not operated more than 360 hours in the previous 12 month period prior to the scheduled test date.
NR 439.075(4)(a)1.d.d. The most recently completed test, conducted according to the methods and procedures specified in s. NR 439.07, was conducted less than 12 months prior to the date that testing would be required under par. (b).
NR 439.075(4)(a)2.2. No periodic compliance emission test is required under this section for any affected emission point equipped with a continuous emission monitor for the air contaminants requiring testing if the monitor meets the performance specification requirements of s. NR 439.09.
NR 439.075(4)(a)3.3. No periodic compliance emission test is required under this section for any affected emission point of a fuel burning installation that only fires natural gas, propane or distillate fuel oil or any combination of these fuels.
NR 439.075(4)(a)4.4. The department may grant an extension of up to 180 days for compliance emission testing if the owner or operator of a direct stationary source requests an extension, in writing, and can demonstrate that a representative emissions test cannot be performed within the time frames specified in sub. (3) (b).
NR 439.075(4)(a)5.5. No periodic compliance emission testing for sulfur dioxide emissions is required under this section for any affected emission point which performs periodic fuel sampling and analysis under s. NR 439.085, according to s. NR 439.08.
NR 439.075(4)(b)(b) All requests for waivers under par. (a) shall be submitted in writing for department review and approval at least 60 days prior to the required test date.
NR 439.075 HistoryHistory: Cr. Register, September, 1987, No. 381, eff. 10-1-87; am. (1) (b) 1. d., Register, April, 1988, No. 388, eff. 5-1-88; am. (1) (d) 1. d., Register, August, 1989, No. 404, eff. 9-1-89; renum. from NR 439.12 and am. (1) (b) 3. f. and (d) 1. b., Register, February, 1990, No. 410 eff. 3-1-90; renum. (1) (b) 3. a. 16) and 17) to be 17) and 16), am. (1) (b) 3. a. 23) and c. 6), Register, July, 1990, No. 415, eff. 8-1-90; renum. (1) (a) to (d), (2) and (3) to be (1) to (4), NR 439.085 and NR 439.095 and am., Register, May, 1992, No. 437, eff. 6-1-92; renum. (2) (c) 1. t. to w. and 3. d. to f. to be (2) (c) 1. u., v., w. and t., and 3. e., f. and d., cr. (2) (c) 3. j., k. and L., Register, May, 1993, No. 449, eff. 6-1-93; am. (3) (a) to (c), (4) (a) 1. c., cr. (4) (a) 1. d., Register, December, 1993, No. 456, eff. 1-1-94; am. (2) (a) 4., Register, June, 1994, No. 462, eff. 7-1-94; am. (2) (a) (intro.), 4., Register, December, 1995, No. 480, eff. 1-1-96; am. (4) (a) 1. (intro.), Register, December, 1996, No. 492, eff. 1-1-97; CR 02-146: cr. (4) (a) 4. and 5. Register October 2003 No. 574, eff. 11-1-03; CR 01-081: am. (2) (b) 1. Register September 2004 No. 585, eff. 10-1-04; CR 07-036: am. (2) (b) 1. Register November 2008 No. 635, eff. 12-1-08; CR 08-114: am. (2) (c) 3. j. Register July 2009 No. 643, eff. 8-1-09; CR 09-020: am. (3) (a) Register January 2010 No. 649, eff. 2-1-10.