NR 460.05(7)(h)1.1. Identify each affected source covered by the extension.
NR 460.05(7)(h)2.2. Specify the termination date of the extension.
NR 460.05(7)(h)3.3. Specify the dates by which steps toward compliance are to be taken, if appropriate.
NR 460.05(7)(h)4.4. Specify other applicable requirements to which the compliance extension applies, such as performance tests.
NR 460.05(7)(h)5.5. Specify any additional conditions that the department deems necessary to assure any of the following:
NR 460.05(7)(h)5.a.a. Under par. (c), the installation of the necessary controls and protection of human health during the extension period.
NR 460.05(7)(h)5.b.b. Under par. (d), the proper operation and maintenance of the installed controls during the extension period.
NR 460.05(7)(i)(i) The owner or operator of an existing source that has been granted a compliance date extension under par. (g) may be required to submit to the department progress reports indicating whether the steps toward compliance outlined in the compliance schedule have been reached. The contents of the progress reports and the dates by which they shall be submitted shall be specified in the written compliance date extension granted under par. (h).
NR 460.05(7)(j)(j)
NR 460.05(7)(j)1.1. The department shall notify the owner or operator in writing of approval or intention to deny approval of a request for an extension of compliance within 30 calendar days after receipt of sufficient information to evaluate a request submitted under par. (c) 1. or (d). The department shall notify the owner or operator in writing of the status of the application, that is, whether the application contains sufficient information to make a determination within 30 calendar days after receipt of the original application and within 30 calendar days after receipt of any supplementary information that is submitted. The 30-day approval or denial period shall begin after the owner or operator has been notified in writing that the application is complete.
NR 460.05(7)(j)2.2. When notifying the owner or operator that an application is not complete, the department shall specify the information needed to complete the application and provide notice of opportunity for the applicant to present, in writing, within 30 calendar days after notification of the incomplete application, additional information or arguments to the department to enable further action on the application.
NR 460.05(7)(j)3.3. Before denying any request for a compliance date extension, the department shall notify the owner or operator in writing of the department’s intention to issue the denial, together with all of the following:
NR 460.05(7)(j)3.a.a. Notice of the information and findings on which the intended denial is based.
NR 460.05(7)(j)3.b.b. Notice of opportunity for the owner or operator to present in writing, within 15 calendar days after notification of the intended denial, additional information or arguments to the department before further action on the request.
NR 460.05(7)(j)4.4. The department’s final determination to deny any request for an extension shall be in writing and shall set forth the specific grounds on which the denial is based. The final determination shall be made within 30 calendar days after presentation of additional information or argument, if the application is complete, or within 30 calendar days after the final date specified for the presentation if no presentation is made.
NR 460.05(7)(k)(k)
NR 460.05(7)(k)1.1. The department shall notify the owner or operator in writing of approval or intention to deny approval of a request for a compliance date extension within 30 calendar days after receipt of sufficient information to evaluate a request submitted under par. (c) 2. The 30-day approval or denial period will begin after the owner or operator has been notified in writing that the application is complete. The department shall notify the owner or operator in writing of the status of the application, that is, whether the application contains sufficient information to make a determination, within 15 calendar days after receipt of the original application and within 15 calendar days after receipt of any supplementary information that is submitted.
NR 460.05(7)(k)2.2. When notifying the owner or operator that an application is not complete, the department shall specify the information needed to complete the application and provide notice of opportunity for the applicant to present, in writing, within 15 calendar days after notification of the incomplete application, additional information or arguments to the department to enable further action on the application.
NR 460.05(7)(k)3.3. Before denying any request for a compliance date extension, the department shall notify the owner or operator in writing of the department’s intention to issue the denial, together with all of the following:
NR 460.05(7)(k)3.a.a. Notice of the information and findings on which the intended denial is based.
NR 460.05(7)(k)3.b.b. Notice of opportunity for the owner or operator to present in writing, within 15 calendar days after notification of the intended denial, additional information or arguments to the department before further action on the request.
NR 460.05(7)(k)4.4. A final determination to deny any request for an extension shall be in writing and shall set forth the specific grounds on which the denial is based. The final determination shall be made within 30 calendar days after presentation of additional information or argument, if the application is complete, or within 30 calendar days after the final date specified for the presentation if no presentation is made.
NR 460.05(7)(L)(L) The department may terminate an extension of compliance at an earlier date than specified if any specification under par. (h) 3. or 4. is not met.
NR 460.05(7)(L)1.1. Upon making a determination to terminate, the department shall notify, in writing, the owner or operator of the department’s determination to terminate, together with both of the following:
NR 460.05(7)(L)1.a.a. Notice of the reason for termination.
NR 460.05(7)(L)1.b.b. Notice of opportunity for the owner or operator to present in writing, within 15 calendar days after notification of the determination to terminate, additional information or arguments to the department before further action on the termination.
NR 460.05(7)(L)2.2. A termination of an extension of compliance shall be in writing and shall set forth the specific grounds on which the termination is based. The termination shall be made within 30 calendar days after presentation of additional information or arguments, or within 30 calendar days after the final date specified for the presentation if no presentation is made.
NR 460.05 HistoryHistory: Cr. Register, March, 1997, No. 495, eff. 4-1-97; corrections in (4) (c) 4., (6) (b) 1. b. and c., (d) 1. b., (f) 2., 5., and (g) made under s. 13.93 (2m) (b) 7., Stats., Register March 2002 No. 555; CR 05-039: am. (1) (a) (intro.), (2) (a), (c) 1., (d), (f), (3) (b), (4) (a) 1., 2., (c) 1., 3. to 6., 7. (intro.), b., c., and 8., (5), (6) (a), (7) (c) 1. b., 2., (j) 1. and (L), r. and recr. (1) (a) 1. and 2., renum. (3) (c) 1., (7) (e) 2. b. and d. to be (3) (c), (7) (e) 2. a. and b. and am. (3) (c) and (7) (e) 2. a., r. (3) (c) 2., (4) (b), (7) (e) 2. a. and c., 3. and 4., cr. (3m), (4) (c) 7. d. and 9., (7) (c) 1. c., (L) 1. and 2., Register February 2006 No. 602, eff. 3-1-06; CR 07-105: am. (4) (a) 2., (c) 1. (intro.), 3. to 5., 9., r. (4) (c) 2. Register December 2008 No. 636, eff. 1-1-09.
NR 460.06NR 460.06Performance testing requirements.