NR 440.285(6)(a)(a) After installing control equipment in accordance with sub. (3) (a) 1. (fixed roof and internal floating roof), the owner or operator shall meet the following requirements:
NR 440.285(6)(a)1.1. Furnish the department with a report that describes the control equipment and certifies that the control equipment meets the specifications of subs. (3) (a) 1. and (4) (a) 1. This report shall be an attachment to the notification required by s. NR 440.07 (1) (c).
NR 440.285(6)(a)2.2. Keep a record of each inspection performed as required by sub. (4) (a) 1. to 4. Each record shall identify the storage vessel on which the inspection was performed and shall contain the date the vessel was inspected and the observed condition of each component of the control equipment (seals, internal floating roof, and fittings).
NR 440.285(6)(a)3.3. If any of the conditions described in sub. (4) (a) 2. are detected during the annual visual inspection required by sub. (4) (a) 2., a report shall be furnished to the department within 30 days of the inspection. Each report shall identify the storage vessel, the nature of the defects, and the date the storage vessel was emptied or the nature of and date the repair was made.
NR 440.285(6)(a)4.4. After each inspection required by sub. (4) (a) 3. that finds holes or tears in the seal or seal fabric, defects in the internal floating roof, or other control equipment defects listed in sub. (4) (a) 3. b., a report shall be furnished to the department within 30 days of the inspection. The report shall identify the storage vessel and the reason it did not meet the specifications of sub. (3) (a) 1. or (4) (a) 3. and list each repair made.
NR 440.285(6)(b)(b) After installing control equipment in accordance with sub. (3) (a) 2. (external floating roof), the owner or operator shall meet the following requirements:
NR 440.285(6)(b)1.1. Furnish the department with a report that describes the control equipment and certifies that the control equipment meets the specifications of subs. (3) (a) 2. and (4) (b) 2. to 4. This report shall be an attachment to the notification required by s. NR 440.07 (1) (c).
NR 440.285(6)(b)2.2. Within 60 days of performing the seal gap measurements required by sub. (4) (b) 1., furnish the department with a report that contains:
NR 440.285(6)(b)2.a.a. The date of measurement.
NR 440.285(6)(b)2.b.b. The raw data obtained in the measurement.
NR 440.285(6)(b)2.c.c. The calculations described in sub. (4) (b) 2. and 3.
NR 440.285(6)(b)3.3. Keep a record of each gap measurement performed as required by sub. (4) (b). Each record shall identify the storage vessel in which the measurement was performed and shall contain:
NR 440.285(6)(b)3.a.a. The date of measurement.
NR 440.285(6)(b)3.b.b. The raw data obtained in the measurement.
NR 440.285(6)(b)3.c.c. The calculations described in sub. (4) (b) 2. and 3.
NR 440.285(6)(b)4.4. After each seal gap measurement that detects gaps exceeding the limitations specified by sub. (4) (b) 4., submit a report to the department within 30 days of the inspection. The report will identify the vessel and contain the information specified in par. (b) 2. and the date the vessel was emptied or the repairs made and date of repair.
NR 440.285(6)(c)(c) After installing control equipment in accordance with sub. (3) (a) 3. or (b) 1. (closed vent system and control device other than a flare), the owner or operator shall keep the following records:
NR 440.285(6)(c)1.1. A copy of the operating plan.
NR 440.285(6)(c)2.2. A record of the measured values of the parameters monitored in accordance with sub. (4) (c) 2.
NR 440.285(6)(d)(d) After installing a closed vent system and flare to comply with sub. (3), the owner or operator shall meet the following requirements:
NR 440.285(6)(d)1.1. A report containing the measurements required by s. NR 440.18 (6) shall be furnished to the department as required by s. NR 440.08. This report shall be submitted within 6 months of the initial startup date.
NR 440.285(6)(d)2.2. Records shall be kept of all periods of operation during which the flare pilot flame is absent.
NR 440.285(6)(d)3.3. Semiannual reports of all periods recorded under subd. 2. in which the pilot flame was absent shall be furnished to the department.
NR 440.285(7)(7)Monitoring of operations.
NR 440.285(7)(a)(a) The owner or operator shall keep copies of all records required by this section, except for the record required by par. (b) for at least 2 years. The record required by par. (b) shall be kept for the life of the source.
NR 440.285(7)(b)(b) The owner or operator of each storage vessel as specified in sub. (1) (a) shall keep readily accessible records showing the dimensions of the storage vessel and an analysis showing the capacity of the storage vessel.
NR 440.285(7)(c)(c) Except as provided in pars. (f) and (g), the owner or operator of each storage vessel either with a design capacity greater than or equal to 151 m3 storing a liquid with a maximum true vapor pressure greater than or equal to 3.6 kPa, or with a design capacity greater than or equal to 75 m3 but less than 151 m3 storing a liquid with a maximum true vapor pressure greater than or equal to 15.0 kPa, shall maintain a record of the VOL stored, the period of storage, and the maximum true vapor pressure of that VOL during the respective storage period.
NR 440.285(7)(d)(d) Except as provided in par. (g), the owner or operator of each storage vessel either with a design capacity greater than or equal to 151 m3 storing a liquid with a maximum true vapor pressure that is normally less than 5.2 kPa, or with a design capacity greater than or equal to 75 m3 but less than 151 m3 storing a liquid with a maximum true vapor pressure that is normally less than 27.6 kPa, shall notify the department within 30 days when the maximum true vapor pressure of the liquid exceeds the respective maximum true vapor pressure values for each volume range.
NR 440.285(7)(e)(e) Available data on the storage temperature may be used to determine the maximum true vapor pressure as follows: