NR 407.05(4)(c)9.d.d. Boiler, turbine, generator, heating and air conditioning maintenance.
NR 407.05(4)(c)9.e.e. Pollution control equipment maintenance.
NR 407.05(4)(c)9.f.f. Internal combustion engines used for warehousing and material transport, forklifts and courier vehicles, front end loaders, graders and trucks, carts and maintenance trucks.
NR 407.05(4)(c)9.g.g. Fire control equipment.
NR 407.05(4)(c)9.h.h. Janitorial activities.
NR 407.05(4)(c)9.i.i. Office activities.
NR 407.05(4)(c)9.j.j. Convenience water heating.
NR 407.05(4)(c)9.k.k. Convenience space heating units with heat input capacity of less than 5 million Btu per hour that burn gaseous fuels, liquid fuels or wood.
NR 407.05(4)(c)9.L.L. Fuel oil storage tanks with a capacity of 10,000 gallons or less.
NR 407.05(4)(c)9.m.m. Stockpiled contaminated soils.
NR 407.05(4)(c)9.n.n. Demineralization and oxygen scavenging of water for boilers.
NR 407.05(4)(c)9.o.o. Purging of natural gas lines.
NR 407.05(4)(c)10.10. For any emissions unit, operation, or activity that is included in the application, the applicant does not need to include information on any air contaminant if the maximum theoretical emissions of the air contaminant are less than the level for that air contaminant listed in Table 3 or if the maximum theoretical emissions of any air contaminant listed in Table 3 from all emission units, operations, or activities at a facility are less than 5 times the level specified in Table 3 for that air contaminant. Multiple emissions units, operations, and activities that perform identical or similar functions shall be combined in determining the applicability of this exemption.
NR 407.05(4)(d)(d) The following air pollution control requirements:
NR 407.05(4)(d)1.1. Citation and description of all applicable requirements.
NR 407.05(4)(d)2.2. Description of or reference to any applicable test method for determining compliance with each applicable requirement.
NR 407.05(4)(e)(e) Other specific information that may be necessary to implement and enforce other requirements of the Act or to determine the applicability of the requirements.
NR 407.05(4)(f)(f) An explanation of any proposed exemptions from otherwise applicable requirements.
NR 407.05(4)(g)(g) Additional information necessary to define alternate operating scenarios pursuant to s. NR 407.09 (2) (b), or to define permit terms and conditions implementing the permit flexibility provisions of s. NR 407.025 or internal offset provisions of s. NR 425.05.
NR 407.05(4)(h)(h) A compliance plan that contains all of the following:
NR 407.05(4)(h)1.1. A description of the compliance status of the source with respect to all applicable requirements.
NR 407.05(4)(h)2.2. A description as follows:
NR 407.05(4)(h)2.a.a. For applicable requirements with which the source is in compliance, a statement that the source will continue to comply with the requirements.
NR 407.05(4)(h)2.b.b. For applicable requirements that will become effective during the permit term, a statement that the source will meet the requirements on a timely basis.
NR 407.05(4)(h)2.c.c. For requirements for which a stationary source is not proposed to be in compliance at the time of permit issuance, a narrative description of how the source will achieve compliance with the requirements.
NR 407.05(4)(h)3.3. A compliance schedule as follows:
NR 407.05(4)(h)3.a.a. For applicable requirements with which the source is in compliance, a statement that the source will continue to comply with the requirements.
NR 407.05(4)(h)3.b.b. For applicable requirements that will become effective during the permit term, a statement that the source will meet the requirements on a timely basis, unless a more detailed schedule is expressly required by the applicable requirement.
NR 407.05(4)(h)3.c.c. A compliance schedule for sources which are not proposed to be in compliance with all applicable requirements at the time of permit issuance. The schedule shall include a series of remedial measures, including an enforceable sequence of actions with milestones, leading to compliance with any applicable requirements for which the source will be in noncompliance at the time of permit issuance. This compliance schedule shall resemble and be at least as stringent as that contained in any judgment, judicial consent decree or stipulation or administrative order to which the source is subject.