Safe Drinking Water Loan Program: term and repayment of loan revisions [Sec. 1960b, c] -
Act 9Soil and water resource management program: funding provision and bonding authority increased [Sec. 130m, 307] -
Act 9Dam safety aid program: sunset extended [Sec. 348p] -
Act 9Dam safety project aid program: DNR bonding authority increased [Sec. 301] -
Act 9Floating treatment wetland placed in a lake or river made eligible for lake management grant and river protection grant -
Act 177Stewardship Program: amount obligated for water infrastructure projects in state parks increased -
Act 93Urban storm water and runoff, flood control, and riparian restoration projects: DNR bonding authority increased [Sec. 298] -
Act 9Wetland mitigation bank changes; DNR duties, U.S. Army Corps of Engineers, and emergency rule provisions -
Act 59Floating treatment wetland placed in a lake or river made eligible for lake management grant and river protection grant -
Act 177Wetland mitigation bank changes; DNR duties, U.S. Army Corps of Engineers, and emergency rule provisions -
Act 59``Michael G. Ellis Memorial Interchange”: DOT to designate and mark interchange of I 41, USH 10, and STH 441 in Winnebago County as -
Act 3