NR 216.03(2)(d)(d) One application may be submitted by multiple owners or operators of municipal separate storm sewer systems when requesting to be covered as co-applicants under an individual permit.
NR 216.03 HistoryHistory: CR 03-028: cr. Register July 2004 No. 583, eff. 8-1-04; CR 21-027: am. (1), (2) (a), (b) Register March 2022 No. 795, eff. 4-1-22.
NR 216.031NR 216.031General permit application requirements. Municipalities subject to the requirements of this subchapter seeking coverage under a general permit shall submit an application for permit coverage to the department. The contents of the application shall be specified in the general permit, shall require the submission of information necessary to demonstrate adequate program implementation, and at a minimum shall include all of the following:
NR 216.031(1)(1)General information.
NR 216.031(1)(a)(a) The legal name, address, and telephone number of the municipal owner or operator, and additional contact persons.
NR 216.031(1)(b)(b) Status as a government entity.
NR 216.031(1)(c)(c) Type of facility or discharges.
NR 216.031(1)(d)(d) The receiving waterbodies.
NR 216.031(1)(e)(e) Any additional relevant information that the department requests.
NR 216.031(2)(2)Minimum control measure information. Descriptions of how the applicant intends to comply with all of the following permit requirements:
NR 216.031(2)(a)(a) Public education and outreach. A public education and outreach program pursuant s. NR 216.07 (1).
NR 216.031(2)(b)(b) Public involvement and participation. A public involvement and participation program pursuant to s. NR 216.07 (2).
NR 216.031(2)(c)(c) Illicit discharge detection and elimination. An illicit discharge detection and elimination program pursuant to s. NR 216.07 (3), including a list of existing legal authorities to enforce this program.
NR 216.031(2)(d)(d) Construction site pollution control. A program to reduce pollutants in runoff from construction sites pursuant to s. NR 216.07 (4).
NR 216.031(2)(e)(e) Post-construction site storm water management. A program to reduce pollutants in runoff from new development and redevelopment sites after construction pursuant to s. NR 216.07 (5).
NR 216.031(2)(f)(f) Pollution prevention. A pollution prevention program for municipal operation and maintenance areas pursuant to s. NR 216.07 (6) (a).
NR 216.031(3)(3)Storm sewer system map. A street map showing corporate boundaries, U.S. census urbanized area boundaries, and limits of any sanitary sewer service area.
NR 216.031(4)(4)Other requirements. A list of MS4 discharges to an outstanding resource water, exceptional resource water, impaired waters, and discharges of a pollutant of concern covered by a US EPA-approved TMDL. A description of the current control measures being implemented to meet applicable requirements for those discharges pursuant s. NR 216.07 (10).
NR 216.031 NoteNote: A list of outstanding resource waters and exceptional resource waters may be found on the department website at: https://dnr.wisconsin.gov/topic/SurfaceWater/orwerw.html. A list of Wisconsin impaired waterbodies is updated every two years and may be found on the department website at: https://dnr.wisconsin.gov/topic/SurfaceWater/ConditionLists.html. A list of Wisconsin US EPA approved TMDLs may be found on the department website at: https://dnr.wisconsin.gov/topic/TMDLs.
NR 216.031 HistoryHistory: CR 21-027: NR 216.031 (intro.) renum. from NR 216.06 (intro.) and am., r. (1) (intro.), cr. (1) (a) to (e), NR 216.031 (2), (3) renum. from NR 216.06 (2), (3) and, as renumbered, am. (2) (intro.), (3), cr. (4) Register March 2022 No. 795, eff. 4-1-22.
NR 216.032NR 216.032Individual permit application requirements. Municipalities subject to the requirements of this subchapter seeking coverage under a storm water discharge individual permit shall apply by submitting the necessary application information to the department. The individual permit application shall include all of the following:
NR 216.032(1)(1)The information listed in s. NR 216.031 (1).
NR 216.032(2)(2)The best management practices that the municipality proposes to implement for each of the programs described in s. NR 216.07 (1) to (6).
NR 216.032(3)(3)Information on any discharges to designated waters as described in s. NR 216.031 (4).
NR 216.032(4)(4)The proposed measurable goals for each of the BMPs including, as appropriate, the months and years in which the municipality proposes to undertake required actions, including interim milestones and the frequency of the action.
NR 216.032(5)(5)The person or persons responsible for implementing or coordinating the storm water management program.
NR 216.032(6)(6)An estimate of square mileage served by the municipality.
NR 216.032(7)(7)A storm sewer map that satisfies the requirements of s. NR 216.07 (7).
NR 216.032(8)(8)Any additional relevant information that the department requests.