NR 661.1034(3)(a)4.4. Total organic mass flow rates shall be determined by one of the following equations: Where:
Eh= Total organic mass flow rate, kg/h
Q2sd= Volumetric flow rate of gases entering or exiting control device, as determined by Method 2, dscm/h
n = Number of organic compounds in the vent gas
Ci= Organic concentration in ppm, dry basis, of compound i in the vent gas, as determined by Method 18
MWi= Molecular weight of organic compound i in the vent gas, kg/kg-mol
0.0416 = Conversion factor for molar volume, kg-mol/m3 (@293 K and 760 mm Hg)
10-6 = Conversion from ppm
Where:
Eh= Total organic mass flow rate, kg/h
Q = Volumetric flow rate of gases entering or exiting control device, as determined by Method 2, dscm/h
C = Organic concentration in ppm, dry basis, as determined by Method 25A
MW = Molecular weight of propane, 44
0.0416 = Conversion factor for molar volume, kg-mol/m3 (@293 K and 760 mm Hg)
10-6 = Conversion from ppm.
NR 661.1034(3)(a)5.5. The annual total organic emission rate shall be determined by the following equation: Where:
EA = Total organic mass emission rate, kg/y
Eh = Total organic mass flow rate for the process vent, kg/h
H = Total annual hours of operations for the affected unit, h
NR 661.1034(3)(a)6.6. Total organic emissions from all affected process vents at the facility shall be determined by summing the hourly total organic mass emission rates, Eh, as determined in subd. 4., and by summing the annual total organic mass emission rates, EA, as determined in subd. 5., for all affected process vents at the facility. NR 661.1034(3)(b)(b) The remanufacturer or other person that stores or treats the hazardous secondary material shall record process information that may be necessary to determine the conditions of the performance tests. Operations during periods of startup, shutdown, and malfunction may not constitute representative conditions for the purpose of a performance test. NR 661.1034(3)(c)(c) The remanufacturer or other person that stores or treats the hazardous secondary material at an affected facility shall provide, or cause to be provided, all of the following performance testing facilities: