NR 212.40(8)(c)(c) The following procedures shall be used to reallocate available wasteloads:
NR 212.40(8)(c)1.1. Upon notification by the department of an available wasteload allocation pursuant to par. (a), the designated management agency shall publish a notice of wasteload availability.
NR 212.40(8)(c)2.2. A 6 month period shall be provided for persons to declare interest in available wasteload allocations.
NR 212.40(8)(c)3.3. Within 60 days of the end of the 6 month period the designated management agency shall conduct a public meeting regarding the proposed reallocation.
NR 212.40(8)(c)4.4. The designated management agency shall recommend a reallocation proposal to the department including an explicit reserve capacity.
NR 212.40(8)(c)5.5. The department shall notify the designated management agency of acceptance or rejection of the recommendation within 6 months.
NR 212.40 HistoryHistory: Cr. Register, September, 1981, No. 309, eff. 10-1-81; cr. (8), Register, August, 1985, No. 356, eff. 9-1-85; am. (2) (a) and (b), (3), (5) and (6) (b) 1. and 2., cr. (4) (c), r. and recr. (8), Register, May, 1986, No. 365, eff. 6-1-86; cr. (1) (c), (2) (am), (c) and (d), (3) (b) and (c), (6) (am) and (b) 3., am. (4) (a) and (b), renum. (3) to be (3) (a), Register, March, 1987, No. 375, eff. 4-1-87; am. (1) (c) and (4) (a), Register, April, 1988, No. 388, eff. 5-1-88; cr. (4) (d), r. and recr. Table 1-C, Register, March, 1996, No. 483, eff. 4-1-96; CR 15-085: am. (2) (intro.), (b), (c) Register August 2016 No. 728, eff. 9-1-16.
NR 212.60NR 212.60Determination of upper Wisconsin river water quality related effluent limitations. Effluent limitations for point sources discharging BOD5 to the upper Wisconsin river shall be calculated according to the procedures contained in this section. These limitations shall apply from May 1 to October 31 annually.
NR 212.60(1)(1)The department shall determine baseline loads for each point source subject to the wasteload allocation in accordance with all of the following:
NR 212.60(1)(a)(a) The baseline load for each publicly-owned point source located between milepoints 205.3 and 171.9 shall be calculated as follows:
- See PDF for table PDF
NR 212.60(1)(b)(b) The baseline load for each nonpublicly-owned point source located between milepoints 205.3 and 171.9 shall be calculated as follows:
- See PDF for table PDF
NR 212.60(1)(c)(c) The baseline load for each publicly-owned point source located between milepoints 235.4 and 271.1 shall be calculated as follows:
- See PDF for table PDF
- See PDF for table PDF
NR 212.60(1)(d)(d) The baseline load for each nonpublicly-owned point source with best practicable waste treatment effluent limitations of less than 500 pounds per day located between milepoints 271.1 and 240.0 shall be calculated as follows:
- See PDF for table PDF
NR 212.60(1)(e)(e) The baseline load for each nonpublicly-owned point source with best practicable waste treatment effluent limitations of BOD5 equal to or exceeding 500 pounds per day located between milepoints 271.1 and 240.0 shall be calculated as follows:
- See PDF for table PDF
NR 212.60(1)(f)(f) The baseline load for each publicly-owned point source located between milepoints 341.4 and 305.9 shall be calculated as follows:
- See PDF for table PDF
NR 212.60(1)(g)(g) The baseline load for each nonpublicly-owned point source located between milepoints 341.4 and 305.9 shall be calculated as follows:
- See PDF for table PDF
NR 212.60(2)(2)Determine the allocation for each point source.
NR 212.60(2)(a)(a) The allocation for each publicly-owned point source located between milepoints 205.3 and 171.9 shall be its baseline load as determined in sub. (1) (a).
NR 212.60(2)(b)(b) The allocation for each nonpublicly-owned point source located between milepoints 205.3 and 171.9 shall be calculated as follows:
- See PDF for table PDF
For purposes of determining compliance with water quality related effluent limits, the following conditions shall be met: