NR 153.15(2)(f)1.1. Activities requiring WPDES permit coverage at livestock operations with less than 1,000 animal units that have been issued a WPDES permit by the department under ch. 283, Stats. In this paragraph, “livestock operation” has the meaning given in s. 281.16 (1) (c), Stats. In this paragraph, “animal unit” has the meaning given in ch. NR 243. NR 153.15(2)(f)2.2. Activities requiring WPDES permit coverage at livestock operations that have, or will have within 12 months, at least 1,000 animal units and are required to apply for a WPDES permit under s. NR 243.12 (1) (a) or (b). NR 153.15(2)(f)3.3. All other activities requiring coverage under a WPDES permit issued under chs. NR 200 to 240 and 245 to 299 except for activities required of the city of Racine to comply with municipal storm water permit requirements under ch. NR 216. NR 153.15 NoteNote: A municipality required to comply with storm water permitting requirements under ch. NR 216 may apply for grant funding under ch. NR 155. NR 153.15(2)(g)(g) Activities required as part of or as a condition of a license for a solid waste management site. NR 153.15(2)(h)(h) Activities funded through state or federal grants for wastewater treatment plants. NR 153.15(2)(j)(j) Urban best management practices associated with new construction or new development, including the following: NR 153.15(2)(j)1.1. Construction site erosion control measures subject to the requirements of s. NR 151.11, except those required by this chapter to control erosion during construction of a best management practice. NR 153.15(2)(j)3.3. The department may consider redevelopment of an existing development and in-fill to be either existing development or new development for purposes of this paragraph. In making its determination, the department shall consider the type of land cover within and adjacent to the development and the areal extent of the development. NR 153.15(2)(j)4.4. In this paragraph, “existing development” has the meaning given it in s. NR 151.002 (14g), “in-fill” has the meaning given it in s. NR 151.002 (18), and “new development” means development resulting from the conversion of previously undeveloped land or agricultural land uses initiated after October 1, 2004, or development for which a notice of intent was received by the department or the department of safety and professional services after October 1, 2004. NR 153.15(2)(k)(k) Pollutant control measures needed during construction of highways and bridges. NR 153.15(2)(m)(m) Installing, operating or repairing a small-scale on-site human domestic waste facility. NR 153.15(2)(o)(o) Installing dams, pipes, conveyance systems and urban best management practices, including storm sewer rerouting and land acquisition, when intended solely for flood control. In this paragraph, “dam” means any artificial barrier in or across a waterway, which has the primary purpose of impounding or diverting water. A dam includes all appurtenant works, such as a dike, canal or powerhouse. NR 153.15(2)(p)(p) Practices other than those in ch. NR 154 that are normally and routinely used in growing crops and required for the growing of crops or the feeding of livestock. NR 153.15(2)(q)(q) Practices whose purpose is to accelerate or increase the drainage of land or wetlands, except where drainage is required as a component of a best management practice. NR 153.15(2)(r)(r) Practices to control spills from commercial bulk storage of pesticides, fertilizers, petroleum and similar materials required by ch. ATCP 33 or other administrative rules. NR 153.15(2)(t)(t) Practices previously installed and necessary to support cost-shared practices. NR 153.15(2)(w)(w) Changes in location of unconfined manure stacks involving no capital cost. NR 153.15(2)(y)(y) Best management practices to correct overtopping caused by mismanagement of a manure storage facility. NR 153.15(2)(za)(za) Installing or modifying an agricultural facility or practice which is required pursuant to a court order or court-ordered stipulation.