NR 463.26(6)(a)2.2. Performing preventive maintenance for each control device according to the preventive maintenance plan required by s. NR 463.23 (3) (b) 3., and recording all information needed to document conformance with the requirements.
NR 463.26(6)(a)3.3. Operating and maintaining each bag leak detection system according to the site-specific monitoring plan required by s. NR 463.23 (3) (b) 4., and recording all information needed to demonstrate conformance with the requirements.
NR 463.26(6)(a)4.4. Initiating and completing corrective action for a bag leak detection system alarm according to the corrective action plan required by s. NR 463.23 (3) (b) 5., and recording all information needed to document conformance with the requirements.
NR 463.26(6)(a)5.5. Igniting gases from mold vents according to the procedures in the plan required by s. NR 463.23 (3) (b) 6.
NR 463.26(6)(b)(b) Any instance where you fail to follow the procedures in par. (a) is a deviation that shall be included in your semiannual compliance report.
NR 463.26(6)(c)(c) You shall maintain a current copy of the operation and maintenance plans required by s. NR 463.23 (3) (b) onsite and available for inspection upon request. You shall keep the plans for the life of the iron and steel foundry or until the iron and steel foundry is no longer subject to the requirements of this subchapter.
NR 463.26(7)(7)What other requirements must I meet to demonstrate continuous compliance?
NR 463.26(7)(a)(a) Deviations. You shall report each instance in which you did not meet each emission limitation in s. NR 463.23 (1), including each operating limit, that applies to you. This requirement includes periods of startup, shutdown and malfunction. You also shall report each instance in which you did not meet each work practice standard in s. NR 463.23 (2) and each operation and maintenance requirement of s. NR 463.23 (3) that applies to you. Failure to meet the requirements described in this paragraph are deviations from the emission limitations, work practice standards and operation and maintenance requirements in this subchapter and shall be reported according to the requirements of s. NR 463.27 (2).
NR 463.26(7)(b)(b) Startups, shutdowns and malfunctions.
NR 463.26(7)(b)1.1. Consistent with the requirements of ss. NR 460.05 (4) and 460.06 (4) (a), deviations that occur during a period of startup, shutdown or malfunction are not violations if you demonstrate to the department’s satisfaction that you were operating in accordance with s. NR 460.05 (4) (a).
NR 463.26(7)(b)2.2. The department shall determine whether deviations that occur during a period of startup, shutdown or malfunction are violations according to the provisions in s. NR 460.05 (4).
NR 463.26(8)(8)How do I apply for alternative monitoring requirements for a continuous emissions monitoring system?
NR 463.26(8)(a)(a) You may submit a request to the administrator for an alternative monitoring method to demonstrate compliance with the VOHAP emission limits in s. NR 463.23 (1) (a) 10. for automated pallet cooling lines or automated shakeout lines at a new iron and steel foundry according to the procedures in this section.
NR 463.26(8)(b)(b) You may request approval to use an alternative monitoring method in the notification of construction or for new sources, or at any time.
NR 463.26(8)(c)(c) You shall submit a monitoring plan to the administrator that includes a description of the control technique or pollution prevention technique, a description of the continuous monitoring system or method, including appropriate operating parameters that will be monitored, test results demonstrating compliance with the emission limit, operating limits, if applicable, determined according to the test results, and the frequency of measuring and recording to establish continuous compliance. If applicable, you shall also include operation and maintenance requirements for the monitors.
NR 463.26(8)(d)(d) The monitoring plan is subject to approval by the administrator. Use of the alternative monitoring method may not begin until approval is granted by the administrator.
NR 463.26 NoteNote: The Administrator of the US Environmental Protection Agency retains the authority to approve major alternatives to monitoring according to 40 CFR 63.7761 (c) (3).
NR 463.26 HistoryHistory: CR 06-110: cr. Register July 2007 No. 619, eff. 8-1-07.
NR 463.27NR 463.27Notifications, reports and records.
NR 463.27(1)(1)What notifications must I submit and when?
NR 463.27(1)(a)(a) You shall submit all of the notifications to the department required by ss. NR 460.05 (6) (c) and (d), 460.06 (2), 460.07 (5) (b) and (6) (c) and (e), and 460.08 (2) to (8) that apply to you by the following specified dates:
NR 463.27(1)(b)(b) As specified in s. NR 460.08 (2) (b), if you start up your iron and steel foundry before April 22, 2004, you shall submit your initial notification no later than August 20, 2004.
NR 463.27(1)(c)(c) If you start up your new iron and steel foundry on or after April 22, 2004, you shall submit your initial notification no later than 120 calendar days after you become subject to this subchapter.
NR 463.27(1)(d)(d) If you are required to conduct a performance test, you shall submit a notification of intent to conduct a performance test at least 20 business days before the performance test is scheduled to begin, as required by s. NR 460.06 (2).
NR 463.27(1)(e)(e) If you are required to conduct a performance test or other initial compliance demonstration, you shall submit a notification of compliance status according to the requirements of s. NR 460.08 (8) and either of the following, as applicable:
NR 463.27(1)(e)1.1. For each initial compliance demonstration that does not include a performance test, you shall submit the notification of compliance status before the close of business on the 30th calendar day following completion of the initial compliance demonstration.
NR 463.27(1)(e)2.2. For each initial compliance demonstration that does include a performance test, you shall submit the notification of compliance status, including the performance test results, before the close of business on the 60th calendar day following the completion of the performance test according to the requirement specified in s. NR 460.09 (4) (b).
NR 463.27(2)(2)What reports must I submit and when?
NR 463.27(2)(a)(a) Compliance report due dates. Unless the department has approved a different schedule, you shall submit a semiannual compliance report to the department according to the following requirements: