ATCP 50.785(4)(a)6.6. NRCS conservation practice standard 554 drainage water management (August, 2021). ATCP 50.785(4)(a)7.7. NRCS conservation practice standard 587 structure for water control (January, 2018). ATCP 50.785(4)(b)(b) The landowner agrees to maintain the nutrient treatment system for 10 years unless farming operations on the affected land are discontinued. ATCP 50.785 HistoryHistory: CR 23-024: cr. Register May 2024 No. 821, eff. 6-1-24. ATCP 50.79(1)(1) Definition. In this section, “pesticide management” means controlling the storage, handling, use, and disposal of pesticides used in crop production in order to minimize contamination of water, air, and nontarget organisms. ATCP 50.79(2)(2) Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse costs for pesticide management described in a pesticide management plan, if required, or described in the plan for the design of a pesticide structure. A cost-share grant may reimburse any of the following costs related to pesticide management: ATCP 50.79(2)(c)(c) Costs for spill control facilities, including any of the following facilities that are needed: ATCP 50.79(2)(c)2.2. Water-tight walls or perimeter flow diversion structures to convey spills or contaminated water from a pesticide mixing area to a sump. ATCP 50.79(2)(c)3.3. Perimeter flow diversion structures needed to convey surface water away from a pesticide mixing area. ATCP 50.79(2)(c)4.4. A shallow sump collection area capable of storing spills, rinsate, washwater, and precipitation that may leak or fall on a pesticide mixing pad. ATCP 50.79(3)(3) Design, construction, and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse pesticide management costs under this section unless all of the following conditions are met: ATCP 50.79(3)(a)(a) The cost-shared practice complies with all of the following that apply: ATCP 50.79(3)(a)1.1. NRCS conservation practice standard 595 pest management conservation system (January, 2022). ATCP 50.79(3)(a)1m.1m. NRCS conservation practice standard 309 agrichemical handling facility (September, 2021). ATCP 50.79(3)(a)3.3. Standards specified by the University of Wisconsin-Madison, biological systems engineering department, in “Wisconsin Minimum Design and Construction Standards for Concrete Mixing and Loading Pads and Secondary Containment Structures” (February, 2005). ATCP 50.79 NoteNote: The “Wisconsin Minimum Design and Construction Standards for Concrete Mixing and Loading Pads and Secondary Containment Structures” (February, 2005) is on file with the department and the legislative reference bureau. Copies may be purchased from the University of Wisconsin-Madison, Biological Systems Engineering Department, 460 Henry Mall, Madison, WI 53706, telephone: (608) 262-3311.
ATCP 50.79(3)(b)(b) The landowner agrees to maintain the pesticide management plan, if required, for the duration specified in the cost-share contract, and to maintain any structures for 10 years unless farming operations on the affected land are discontinued. ATCP 50.79 HistoryHistory: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: r. and recr. (3) (a) Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (2) (intro.), (3) (a) 1., (b) Register February 2014 No. 698, eff. 5-1-14; CR 23-024: am. (3) (a) 1., cr. (3) (a) 1m. Register May 2024 No. 821, eff. 6-1-24.