NR 212.40(2)(2)The department shall determine baseline loads for each point source subject to the wasteload allocation in accordance with all of the following:
NR 212.40(2)(a)(a) Publicly-owned point sources between milepoints 40.0 and 19.2. The baseline load expressed in pounds per day for each publicly-owned point source shall be calculated as follows:
- See PDF for table PDF
NR 212.40(2)(am)(am) Publicly-owned point sources between milepoints 7.2 and 0.0. The baseline load expressed in pounds per day for each publicly-owned point source shall be calculated as follows:
- See PDF for table PDF
NR 212.40(2)(b)(b) Nonpublicly-owned point sources between milepoints 40.0 and 19.2. The baseline load expressed in pounds per day for each nonpublicly-owned point source shall be calculated as follows:
- See PDF for table PDF
NR 212.40(2)(c)(c) Nonpublicly-owned point sources between milepoints 7.2 and 0.0. The baseline load expressed in pounds per day for each nonpublicly-owned point source shall be calculated as follows:
- See PDF for table PDF
NR 212.40(2)(d)(d) Mini-cluster adjustment. The baseline load for nonpublicly-owned point sources between milepoints 0.8 and 0.5, and 0.4 and 0.0 shall be adjusted by subtracting 10% of the contractual maximum daily BOD5 discharged to the publicly-owned point source located between milepoint 1.0 and 0.0. The 10% contractual maximum figure for both non-publicly-owned point sources shall be added to the baseline load for the publicly-owned point source located between milepoints 1.0 and 0.0.
NR 212.40(3)(3)
NR 212.40(3)(a)(a) Determine the reserve capacity adjustment. The reserve capacity for each publicly-owned point source located between milepoints 40.0 and 19.2 shall be calculated as follows:
- See PDF for table PDF
NR 212.40(3)(b)(b) The reserve capacity for each publicly-owned point source located between milepoints 7.0 and 6.0 shall be calculated as follows:
- See PDF for table PDF
NR 212.40(3)(c)(c) The reserve capacity for each publicly-owned point source located between milepoints 1.0 and 0.0 shall be calculated as follows:
- See PDF for table PDF
NR 212.40(4)(4)Determine the adjustments to the baseline loads.
NR 212.40(4)(a)(a) The adjusted baseline load for each publicly-owned point source shall be equal to the baseline load for the source calculated in sub. (2) (a) or (am) plus the reserve capacity for the same source calculated in sub. (3), plus the mini-cluster adjustment, if any, calculated in sub. (2) (d).
NR 212.40(4)(b)(b) The adjusted baseline load for each nonpublicly-owned point source shall be calculated as follows:
- See PDF for table PDF
NR 212.40(4)(c)(c) The adjusted baseline load for publicly-owned and nonpublicly-owned point sources from milepoints 32.4 through 19.2 shall include an incremental addition as follows:
- See PDF for table PDF
NR 212.40(4)(d)(d) The adjusted baseline load for nonpublicly-owned point source located between milepoint 0.8 and 0.5 shall be reduced by 2500 pounds of BOD5 from the amount calculated in par. (b).
NR 212.40(5)(5)Determine the allocation for each point source. The allocation for each point source shall be calculated as follows:
- See PDF for table PDF
NR 212.40(6)(6)For purposes of determining compliance with water quality related effluent limits, the following conditions shall be met:
NR 212.40(6)(a)(a) For a point source discharging into the lower Fox river from milepoints 40.0 through 19.2, the sum of the actual daily discharges for any 7-consecutive-day-period may not exceed the sum of the daily point source allocation values calculated under sub. (5) for the same 7-consecutive-day-period; and
NR 212.40(6)(am)(am) For a point source discharging into the lower Fox river from milepoints 7.2 through 0.0, the sum of the actual daily discharges for any 7-consecutive-day-period may not exceed the sum of the daily point source allocation values calculated under sub. (5) for the same 7-consecutive-day-period; and