NR 502.05(7)(c)(c) Access to the storage areas shall be restricted to authorized personnel only. Fencing or other means of access control acceptable to the department shall be maintained around the storage facility. NR 502.05(8)(8) Plan of operation. No person may establish or construct a solid waste storage facility or expand an existing facility unless the person has obtained a plan of operation approval from the department. The plan of operation shall specify the intent and objectives of the proposal, indicate methods and procedures to minimize adverse environmental impacts, and provide a design which complies with the applicable operational requirements specified under subs. (5) to (7). Unless otherwise approved by the department in writing, the plan shall be submitted in accordance with s. NR 500.05 and shall contain, at a minimum, the following information: NR 502.05(8)(c)(c) The proposed facility size, a description of the present land use of the facility and the area within 1/4 mile of the facility. NR 502.05(8)(d)(d) The area served, including population and major industries. NR 502.05(8)(e)(e) The consistency of facility development with areawide solid waste plans and land use plans. NR 502.05(8)(f)(f) The predominant types of vegetation and wildlife within the proposed facility boundaries. NR 502.05(8)(g)(g) A complete materials balance for the storage facility, specifying amounts and characteristics of solid waste. NR 502.05(8)(h)(h) The types of vehicles and access routes used to transport solid waste to and from the facility including the traffic flow patterns within the facility, and an estimate of the increased quantities of traffic on access routes to and from the facility. NR 502.05(8)(i)(i) The estimated quantities and characteristics of wastes containing free liquids resulting from facility operations and methods of their storage and disposal. NR 502.05(8)(j)(j) The persons responsible for facility construction and operation. NR 502.05(8)(k)(k) Provisions for protection of groundwater and surface water during facility construction and operation. NR 502.05(8)(L)(L) A discussion of possible operational hazards and necessary safety precautions. NR 502.05(8)(m)(m) A discussion of design features and logic including the equipment capacity or size. Information shall be included to justify the size and configuration of the receiving area; methods of handling wastes containing free liquids resulting from operations such as floor drains, sewers and water treatment facilities; sizing of storm water drainage control structures; design life of any building and facility equipment; and methods of screening the facility from the surrounding area. NR 502.05(8)(n)(n) An operations and maintenance manual which specifies the operating and maintenance procedures; operating personnel responsibilities; hours of operation; daily operating schedule; equipment maintenance schedules; methods of controlling explosions, dust, fire, odors and windblown materials; special waste handling procedures; methods of controlling access; daily cleanup procedures; person responsible for operation; facility licensee and owner; record keeping procedures; emergency procedures for handling of frozen conditions during cold weather; methods to prevent solid waste from burning; any additional procedures for the handling of the waste in the case of major facility breakdown; and any other pertinent information. NR 502.05(9)(9) Engineering plans. The plan of operation shall include a set of engineering plans and maps which contain the following information unless an exemption is granted in writing by the department: NR 502.05(9)(a)(a) An existing conditions map, which shows the entire facility and the area within 1/4 mile. The minimum scale shall be 1″ = 400′. This map shall include the proposed facility boundary, property lines, easements and right-of-way; building foundations, roads, utilities and other structures; topography, drainage swales, surface waters, wetlands, floodplains and similar drainage features; wooded areas; location of soil borings and test pits; features of historical and archaeological significance; and other features as appropriate. NR 502.05(9)(b)(b) Proposed facility access roads and traffic patterns, buildings, scales, utility lines, drainage diversion, screening, means of access control, final topography, areas to be cleared of vegetation, and other design features. The extent of coverage and scale shall be the same as that for the existing conditions map. NR 502.05(9)(c)(c) A proposed layout plan which shows the receiving, storage and loadout areas. The minimum scale shall be 1″ = 20′. Plan details shall include conceptual designs for the receiving area configuration and traffic flow patterns, storage area and equipment configuration, loadout area and equipment configuration, and other design features. NR 502.05(9)(d)(d) At least one cross section shall be drawn through the receiving, storage and loadout areas indicating existing topography, limits of excavation, proposed final grades and other pertinent design features. More cross sections may be necessary depending on the complexity of the facility design. NR 502.05(10)(10) Construction documentation report. The department may require the applicant to submit a construction documentation report for any storage facility which is required to submit a plan of operation. When a documentation report is required, it shall be prepared in accordance with the approved plan of operation and s. NR 500.05. Operation of the facility may not commence until the construction documentation report is approved in writing by the department and a license is issued. The department may issue a license prior to facility construction or construction documentation approval. NR 502.05 HistoryHistory: Cr. Register, January, 1988, No. 385, eff. 2-6-88; am. (4) (a), renum. (1) (b) to be (1) (c), cr. (1) (b), (2) (e) and (13), Register, May, 1992, No. 437, eff. 6-1-92, cr. (1) (d), (2) (f), am. (5) (intro.), Register, October, 1994, No. 466, eff. 11-1-94; cr. (2) (g), Register, May, 1995, No. 473, eff. 6-1-95; r. and recr., Register, June, 1996, No. 486, eff. 7-1-96; renum. (3) (i) to be (3) (j) and cr. (3) (i), Register, December, 1997, No. 504, eff. 1-1-98; CR 04-113: am. (3) (g) Register June 2005 No. 594, eff. 7-1-05; CR 05-020: am. (1) (a) (intro.), (b), (3) (intro.), (a) and (4) (a) 6., r. (1) (a) 1. to 3., renum. (1) (c) and (d) to be (1) (g) and (h), cr. (1) (c) to (f) and (3) (k) Register January 2006 No. 601, eff. 2-1-06; correction in (3) (e) made under s. 13.92 (4) (b) 7., Stats., Register January 2011 No. 661; CR 21-041: am. (3) (a) Register June 2023 No. 810, eff. 7-1-23. NR 502.06NR 502.06 Collection and transportation services. NR 502.06(1)(a)(a) Owners and operators of solid waste collection and transportation services shall comply with s. NR 502.04. NR 502.06(1)(b)(b) Unless exempt under sub. (2), no person may operate or maintain a collection or transportation service unless the person has obtained an operating license from the department. NR 502.06(1)(c)(c) No person may transport or ship infectious waste or items mixed with infectious waste, unless the person complies with s. NR 526.10. NR 502.06 NoteNote: Services for collection and transportation of asbestos waste are required to meet the minimum requirements of the applicable air management rules in chs. NR 400 to 499.