NR 463.25(5)(b)3.3. For each combustion device subject to the operating limit in s. NR 463.23 (1) (b) 3. for combustion zone temperature, you have a record of the combustion zone temperature measured during the performance test in accordance with sub. (3) (d) 4.
NR 463.25(5)(b)4.4. For each combustion device subject to the operating limit in s. NR 463.23 (1) (b) 4. for combustion zone temperature, you have established appropriate site-specific operating limits and have a record of the combustion zone temperature measured during the performance test in accordance with sub. (4) (c).
NR 463.25(5)(b)5.5. For each acid wet scrubber subject to the operating limits in s. NR 463.23 (1) (b) 5. for scrubbing liquid flow rate and scrubber blowdown pH, you satisfy both of the following:
NR 463.25(5)(b)5.a.a. You have established appropriate site-specific operating limits for the scrubbing liquid flow rate and have a record of the scrubbing liquid flow rate measured during the performance test in accordance with sub. (4) (d).
NR 463.25(5)(b)5.b.b. You have a record of the pH of the scrubbing liquid blowdown measured during the performance test in accordance with sub. (3) (g) 3.
NR 463.25(6)(6)How do I demonstrate initial compliance with the work practice standards that apply to me?
NR 463.25(6)(a)(a) For each iron and steel foundry subject to the certification requirement in s. NR 463.23 (2) (b), you have demonstrated initial compliance if you have certified in your notification of compliance status that: “At all times, your foundry will purchase and use only metal ingots, pig iron, slitter or other materials that do not include post-consumer automotive body scrap, post-consumer engine blocks, post-consumer oil filters, oily turnings, lead components, mercury switches, plastics or free organic liquids.”
NR 463.25(6)(b)(b) For each iron and steel foundry subject to the requirements in s. NR 463.23 (2) (c) for a scrap inspection and selection plan, you have demonstrated initial compliance if you have certified both of the following in your notification of compliance status:
NR 463.25(6)(b)1.1. That you have submitted a written plan to the department for approval according to the requirements in s. NR 463.23 (2) (c).
NR 463.25(6)(b)2.2. That you will operate at all times according to the plan requirements.
NR 463.25(6)(c)(c) For each furan warm box mold or core making line in a new or existing foundry subject to the work practice standard in s. NR 463.23 (2) (d), you have demonstrated initial compliance if you have certified both of the following in your notification of compliance status:
NR 463.25(6)(c)1.1. That you will meet the no methanol requirement for the catalyst portion of each binder chemical formulation.
NR 463.25(6)(c)2.2. That you have records documenting your certification of compliance, such as a material safety data sheet, provided that it contains appropriate information, a certified product data sheet or a manufacturer’s hazardous air pollutant data sheet, onsite and available for inspection.
NR 463.25(6)(d)(d) For each scrap preheater at an existing iron and steel foundry subject to the work practice standard in s. NR 463.23 (2) (e) 1. or 2., you have demonstrated initial compliance if you have certified one of the following in your notification of compliance status:
NR 463.25(6)(d)1.1. That you have installed a gas-fired preheater where the flame directly contacts the scrap charged, you will operate and maintain each gas-fired scrap preheater so that the flame directly contacts the scrap charged and you have records documenting your certification of compliance that are onsite and available for inspection.
NR 463.25(6)(d)2.2. That you will charge only material that is subject to and in compliance with the scrap certification requirements in s. NR 463.23 (2) (b) and you have records documenting your certification of compliance that are onsite and available for inspection.
NR 463.25(6)(e)(e) For each scrap preheater at a new iron and steel foundry subject to the work practice standard in s. NR 463.23 (2) (f), you have demonstrated initial compliance if you have certified in your notification of compliance status that you will charge only material that is subject to and in compliance with the scrap certification requirements in s. NR 463.23 (2) (b) and you have records documenting your certification of compliance that are onsite and available for inspection.
NR 463.25(7)(7)How do I demonstrate initial compliance with the operation and maintenance requirements that apply to me?
NR 463.25(7)(a)(a) For each capture system subject to an operating limit in s. NR 463.23 (1) (b), you have demonstrated initial compliance if you have done both of the following:
NR 463.25(7)(a)1.1. Certified both of the following in your notification of compliance status:
NR 463.25(7)(a)1.a.a. That you have submitted the capture system operation and maintenance plan to the department for approval according to the requirements of s. NR 463.23 (3) (b).
NR 463.25(7)(a)1.b.b. That you will inspect, operate and maintain each capture system according to the procedures in the plan.
NR 463.25(7)(a)2.2. Certified in your performance test report that the system operated during the test at the operating limits established in your operation and maintenance plan.
NR 463.25(7)(b)(b) For each control device subject to an operating limit in s. NR 463.23 (1) (b), you have demonstrated initial compliance if you have certified both of the following in your notification of compliance status:
NR 463.25(7)(b)1.1. That you have submitted the control device operation and maintenance plan to the department for approval according to the requirements of s. NR 463.23 (3) (b).
NR 463.25(7)(b)2.2. That you will inspect, operate and maintain each control device according to the procedures in the plan.
NR 463.25(7)(c)(c) For each bag leak detection system, you have demonstrated initial compliance if you have certified all of the following in your notification of compliance status:
NR 463.25(7)(c)1.1. That you have submitted the bag leak detection system monitoring plan to the department for approval according to the requirements of s. NR 463.23 (3) (b).
NR 463.25(7)(c)2.2. That you will inspect, operate and maintain each bag leak detection system according to the procedures in the plan.