NR 670.315(3)(3) Documentation for each enclosure used to control air pollutant emissions from tanks or containers under requirements of s. NR 664.1084 (4) (e) or 664.1086 (5) (a) 2. Include records for the most recent set of calculations and measurements you performed to verify that the enclosure meets the criteria of a permanent total enclosure as specified in “Procedure T — Criteria for and Verification of a Permanent or Temporary Total Enclosure” under 40 CFR 52.741, Appendix B. NR 670.315(5)(5) Documentation for each closed vent system and control device installed under requirements of s. NR 664.1087 that includes design and performance information as specified in s. NR 670.024 (3) and (4). NR 670.315(6)(6) An emission monitoring plan for both Method 21 in 40 CFR part 60, Appendix A and control device monitoring methods. This plan shall include the following information: monitoring points, monitoring methods for control devices, monitoring frequency, procedures for documenting exceedances, and procedures for mitigating non-compliance. NR 670.315 HistoryHistory: CR 16-007: cr. Register July 2017 No. 739, eff. 8-1-17. NR 670.320NR 670.320 How do I modify my standardized license? You may modify your standardized license by following the procedures found in subs. (1) to (4). NR 670.320(1)(1) Types of changes to standardized licenses. You may make routine changes, routine changes with prior department approval and significant changes. For the purposes of this section: NR 670.320(1)(a)(a) “Routine changes” are any changes to the standardized license that qualify as a class 1 license modification (without prior department approval) under ch. NR 670 Appendix I. NR 670.320(1)(b)(b) “Routine changes with prior department approval” are those changes to the standardized license that would qualify as a class 1 modification with prior department approval or a class 2, under ch. NR 670 Appendix I. NR 670.320(1)(c)(c) “Significant changes” are any changes to the standardized license that are any of the following: NR 670.320(1)(c)3.3. Amend any terms or conditions in the supplemental portion of your standardized license. NR 670.320(2)(a)(a) You may make routine changes to the standardized permit without obtaining approval from the department. However, you shall first determine whether the routine change you intend to make amends the information you submitted under s. NR 670.275 with your notice of intent to operate under the standardized license. NR 670.320(2)(b)(b) If the routine changes you make amend the information you submitted under s. NR 670.275 with your notice of intent to operate under the standardized license, then before you make the routine changes you shall: NR 670.320(3)(3) Procedures for routine changes with prior department approval. NR 670.320(3)(a)(a) Routine changes to the standardized license with prior department approval may only be made with the prior written approval of the department. NR 670.320(4)(a)(a) You shall first provide notice of and conduct a public meeting. NR 670.320(4)(a)1.1. ‘Public Meeting.’ Hold a meeting with the public to solicit questions from the community and inform the community of your proposed modifications to your hazardous waste management activities. Post a sign-in sheet or otherwise provide a voluntary opportunity for people attending the meeting to provide their names and addresses. NR 670.320(4)(a)2.2. ‘Public Notice.’ At least 30 days before you plan to hold the meeting, issue a public notice according to the requirements of s. NR 670.431 (4). NR 670.320(4)(b)(b) After holding the public meeting, submit a modification request to the department that: NR 670.320(4)(b)1.1. Describes the exact change or changes you are requesting and whether they are changes to information you provided under s. NR 670.275 or to terms and conditions in the supplemental portion of your standardized license. NR 670.320(4)(b)3.3. Includes a summary of the public meeting under par. (a), along with the list of attendees and their addresses and copies of any written comments or materials they submitted at the meeting. NR 670.320 NoteNote: A significant change that is also a facility expansion is subject to s. NR 670.007 (1).