DOA:......Bork, BB0219 - Nuclear energy feasibility study
For 2025-2027 Budget -- Not Ready For Introduction
An Act ...; relating to: the budget.
Analysis by the Legislative Reference Bureau
PUBLIC UTILITIES
Nuclear energy feasibility study
The bill requires PSC to conduct a nuclear power plant feasibility study and creates an appropriation to fund the study.
For further information see the state fiscal estimate, which will be printed as an appendix to this bill.
The people of the state of Wisconsin, represented in senate and assembly, do enact as follows:
Section 1. 20.155 (3) (c) of the statutes is created to read:
20.155 (3) (c) Nuclear energy feasibility study. Biennially, the amounts in the schedule to conduct a nuclear power plant feasibility study.
****Note: This Section involves a change in an appropriation that must be reflected in the revised schedule in s. 20.005, stats.
Section 2. 196.025 (8) of the statutes is created to read:
196.025 (8) Nuclear energy feasibility study. The commission shall conduct a nuclear power plant feasibility study, and may contract with a 3rd party to conduct all or part of the study.