AB273-AA1,1,8
3“3. Notwithstanding subd. 2., if the engineer of record for a highway
4improvement determines that the use of a subbase material included in the list
5under subd. 1. would be detrimental to the improvement for site-specific reasons, he
6or she may prohibit the use of that material as a subbase in the improvement. If the
7engineer of record prohibits the use of a subbase material under this subdivision, he
8or she shall provide that determination in writing.”.